MARS DESERT RESEARCH STATION

Operations Report – February 10th

*Operations Report*
SOL: 12
Name of person filing report: Arpan Vasanth
Non-nominal systems: 3 x wall outlets in the Engineering Bay and static
tank pipe leakage.
Generator — functioning
Solar — not checked
Diesel – 50%
Propane – 54 psi
Gasoline (5 Gallon containers for ATV) – all the containers are full
Water (trailer) – Tank #1 – <05%
– Tank #2 – <05%
Water (static) – 90%
Trailer to Static Pump used – Yes
Water (loft) – Static to Loft Pump used – Yes
Water Meter: full – 0120350
ATV’s Used: 1 x 300
Oil Checked: No
ATV # Fuel Used Gals: <1.5
Tires Status: nominal
# Hours Used Day: 0
Phobos used: No
Hours: start = 13.2, end = 14.0
Beginning charge: 100%
Ending charge: 79%
Currently charging: No
Deimos used: Yes
Hours: start = 15.0, end = 16.9
Beginning charge: 100%
Ending charge: 67%
Currently charging: Yes
HabCar used? No
Notes and Comments: – ATV 300 had issues with battery connections and broke
down twice. The crew members think that is due to lose wire connection from
batteries. We suggest CapCom to put this information across to Crew 175 to
avoid any issues during future EVAs.
Summary of Operations activities: –

Kind regards,
Mamatha