Sol Summary Report – January 2nd

Crew 186 Sol 2 Summary Report 02JAN2018

Sol 2

Summary Title: Elusive Blueberries and Baby Radishes

Author’s name: Max Fagin

Mission Status: All nominal

Sol Activity Summary: Our second day on Mars was opened with the slow-motion electrical chords of Vangelis theme from Chariots of Fire. After our morning Yoga, the second EVA team composed of Kshitij, Cesare, Mark, and Sam departed the airlock to search and sample the hematite blueberry formations at Goldstone Rd. that had eluded the first EVA team. While they were out, the remaining crew members caught up on Hab tasks, including Melanie dealing with a finicky battery charger, and Max watering our brand new Radish microgreens that Mark has spent the last few days preparing GreenHab for. The EVA team had a very successful (if exhausting) long duration EVA, stopping twice under Cesare’s guidance to sample interesting geological features. The hematite blueberries, alas, continued to evade us. Shannon: We formally request a hint.

The connection to the Hanksville radio repeater we had hoped to use today for long-range communication wasn’t ready, so communications were lost between the EVA and Hab almost as soon as they rounded the corner, but the connection was fixed by the time they had returned, and we intend to use it to keep in touch on tomorrow’s EVA. The evening finished with Sam beginning his microbe sampling swabs around the hab, and an engineering EVA to move rover supplies from the RAM, along with a brand new load of soil for GreenHab that a friendly supply shuttle dropped right on our doorstep.

Our crew has developed a new tradition which we have dubbed “The Idiot Box”. It is a box which we leave just outside the airlock all day, into which we put all the equipment which we will feel like an idiot for forgetting on our next EVA. That missing airlock fastener? That thermal probe? That EVA medical kit? Ask any one of us about any of these pieces of equipment and we will all give you the same answer: “Put it in the Idiot Box.”

Look Ahead Plan: Our first non-geology EVA will take place tomorrow, with the three goals of photographing the as yet unvisited Maxwell Montes, testing our new long-range communications system with the Hanksville repeater, and testing the direction radio beacon for navigation.

Anomalies in work: The new generator battery does not seem to be charging as expected

Weather: 0C, Winds W at 3MPH, Humidity 43%

Crew Physical Status: Healthy

EVA: Greenstone Rd take 2, 3.25 hrs, geological sampling for spectral analysis

Reports to be filed: Sol Summary, Journalist Report, Greenhab Report, EVA Report, EVA Request, Geology Report

Support Requested: The newer of the two generator batteries that we have on hand is not charging as expected. This may simply be due to it being relatively unused (see Operations report for details), but we aren’t sure. We can continue on the one battery for now, but would appreciate advice or sources on breaking in a new battery.

Copyright © The Mars Society. All rights reserved. | Main Site