Operations Report – February 07th

Crew 240 Operations Report 07-02-2022

SOL: 7

Name of person filing report: François Vinet

Non-nominal systems: NA

Notes on non-nominal systems: NA

ROVERS

Spirit rover used: no

Hours: 154.3

Beginning charge: NA

Ending charge: NA

Currently charging: handled by Atila

Opportunity rover used: no

Hours: 83.6

Beginning charge: NA

Ending charge: NA

Currently charging: handled by Atila

Curiosity rover used: yes

Hours: 165.9

Beginning charge: 100%

Ending charge: 97%

Currently charging: left uncharged, handled by Atila

Perseverance rover used: yes

Hours: 226.8

Beginning charge: 100%

Ending charge: 95%

Currently charging: left uncharged, handled by Atila

General notes and comments: NA

Summary of Hab operations:

WATER USE: 21 gallons

Water (static tank): 263 gallons

Water (loft tank): 37 gallons

Water Meter: 0155557.0 units

Static to Loft Pump used – yes

Static tank pipe heater (on or off): on

Static tank heater (On or off): on

Toilet tank emptied: no

Summary of internet: NA

Summary of suits and radios: one headset has been broken because of wear due to adaptation to the ear.

Summary of GreenHab operations:

WATER USE: 12 gallons at 8am, 9 gallons at 4pm

Heater: On

Supplemental light: On

Harvest: N/A

Summary of ScienceDome operations:

Dual split: off

SOC: 74% at 6.45pm

Summary of RAM operations:

– The crew engineer has accidently melted the main cable of the heat gun (sorry for that). Please find a picture attached. There is one of the three wires exposed. Electrical tape is considered (a heat-shrinkable sheath would perhaps be better) to fix it but please advise.

– The hose placed by Atila in the RAM has been received.

Summary of any observatory issues: NA

Summary of health and safety issues: NA

Questions, concerns and requests to Mission Support: 2 burnable trashes and 1 non-burnable trash are waiting for pickup in the rear airlock. Thank you!

[end]

Copyright © The Mars Society. All rights reserved. | Main Site