Crew 240 Operations Report 08-02-2022
SOL: 8
Name of person filing report: François Vinet
Non-nominal systems: NA
Notes on non-nominal systems: NA
ROVERS
Spirit rover used: yes
Hours: 154.3
Beginning charge: 100%
Ending charge: 69%
Currently charging: left uncharged, handled by Atila
Opportunity rover used: no
Hours: 83.6
Beginning charge: NA
Ending charge: NA
Currently charging: handled by Atila
Curiosity rover used: yes
Hours: 166.0
Beginning charge: 100%
Ending charge: 67%
Currently charging: left uncharged, handled by Atila
Perseverance rover used: no
Hours: 226.9
Beginning charge: NA
Ending charge: NA
Currently charging: handled by Atila
General notes and comments: NA
Summary of Hab operations:
WATER USE: 27 gallons
Water (static tank): 223 gallons
Water (loft tank): 50 gallons
Water Meter: 0155589.3 units
Static to Loft Pump used – yes
Static tank pipe heater (on or off): on
Static tank heater (On or off): on
Toilet tank emptied: no
Summary of internet: NA
Summary of suits and radios: it seems that there is a problem in the load of the suits batteries #7, #8, #9 and #10 (the voltage of the batteries is around 5V after a night of charge). The crew engineer will investigate that problem (it is perhaps the chargers or the power strip) but before that, we use our own battery charger to charge them.
Summary of GreenHab operations:
WATER USE: 12 gallons at 8am
Heater: On
Supplemental light: On
Harvest: N/A
Question: The water from the Greenhab tank is quite warm in the morning when I water the plants since now the Sun is quite strong in the morning and the temperatures aren’t as low, is that normal or should I do something to try to keep the tank cooler?
Summary of ScienceDome operations:
Dual split: off
SOC: 73% at 7.00pm
Summary of RAM operations: NA
Summary of any observatory issues: NA
Summary of health and safety issues: NA
Questions, concerns and requests to Mission Support: NA