Operations Report – February 5th

Crew 274 Operations Report 2/5/2023

SOL: 7

Name of person filing report: Alexis Lojek

Non-nominal systems: Toilet.

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews.

ROVERS

Spirit rover used: No

Hours: 208.0

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: No

Hours: 220.3

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: Yes

Hours: 255.2

Beginning charge: 100%

Ending charge: 44%

Currently charging: No

General notes on rovers: Rover Perseverance was used during today’s EVA. The team returned after noon, so they were not plugged in.

Summary of Hab operations: Habitat is in a nominal condition.

WATER USE: 26 gallons as of 5:45 pm.

Water (static tank): 288 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged after EVA completion and taken off the chargers after the red charging lights turned off. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 2 – 2:40 pm.

WATER USE: 12.64 gallons used

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: No.

Summary of ScienceDome operations: GHO Officer Tyler Hines’ experiment is continuing to be monitored; Cress microgreens have made significant progress and are continuing to sprout.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: No observatory issues.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: Based on our average water usage and the fact that we are a larger crew, we have calculated that the minimum water level of ~145 gallons (“31 inches” from the top of the lid) is likely to be reached on Sol 10. We would like a resupply of the 125 gallons of H2O, as offered at the beginning of our mission, as a safety net. Thank you!

Operations Report – February 4th

Crew 274 Operations Report 2/4/2023

SOL: 6

Name of person filing report: Alexis Lojek

Non-nominal systems: N/A

Notes on non-nominal systems: N/A

ROVERS

Spirit rover used: No

Hours: 208.0

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: Yes

Hours: 220.3

Beginning charge: 100%

Ending charge: 55%

Currently charging: Yes

Perseverance rover used: Yes

Hours: 254.6

Beginning charge: 100%

Ending charge: 41%

Currently charging: Yes

General notes on rovers: Rovers Curiosity and Perseverance were used during today’s EVA. The team returned before noon, so they are plugged in and charging.

Summary of Hab operations: Habitat is in a nominal condition.

WATER USE: 33 gallons as of 6:00 pm.

Water (static tank): 314 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged after EVA completion and taken off the chargers after the red charging lights turned off. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants this morning from 1:30 – 2:00 pm.

WATER USE: 13.74 gallons used

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: Yes. Tomatoes – 232 g, green beans – 374 g, spinach – 19 g, micro greens – 21 g, basil – 13 g, dill – 1 g; total: 660 g.

Summary of ScienceDome operations: GHO Officer Tyler Hines’ experiment is continuing to be monitored; Cress micro greens have made significant progress and have begun to sprout.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: No observatory issues.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – February 3th

Crew 274 Operations Report 2/3/2023

SOL: 5

Name of person filing report: Alexis Lojek

Non-nominal systems: N/A

Notes on non-nominal systems: N/A

ROVERS

Spirit rover used: Yes

Hours: 208.0

Beginning charge: 100%

Ending charge: 45%

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: Yes

Hours: 220.0

Beginning charge: 100%

Ending charge: 46%

Currently charging: Yes

Perseverance rover used: No

Hours: 254.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

General notes on rovers: Rovers Spirit and Curiosity were used during today’s EVA. The team returned before noon, so they are plugged in and charging.

Summary of Hab operations: Habitat is in a nominal condition.

WATER USE: 26 gallons – at 5:50 pm.

Water (static tank): 347 gallons remaining.

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged after EVA completion and taken off the chargers after the red charging lights turned off. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants this morning at 12:30 – 1:00 pm.

WATER USE: 12.62 gallons used

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: Nothing harvested today.

Summary of Science Dome operations: GHO Officer Tyler Hines’ experiment is continuing to be monitored; Cress micro greens have made significant progress and have begun to sprout.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: No observatory issues.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: We are very interested in managing our water usage. Is there a bottom limit we should shoot for at the end of the mission?

Operations Report – February 1th


Crew 274 Operations Report 2/1/2023

SOL: 3

Name of person filing report: Alexis Lojek

Non-nominal systems: Oven light; toilet (now nominal)

Notes on non-nominal systems: Oven light still needs a new bulb. We previously reported that the specifications of the oven light bulb type were emailed to mission support by crew 272 engineer. The toilet required draining into the septic tank this morning, so that was completed. It is now nominal.

ROVERS

Spirit rover used: No

Hours: 207.5

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: No

Hours: 219.5

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: No

Hours: 254.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

General notes on rovers: None of the four rovers were used on EVA. They are all charging from last night.

Summary of Hab operations: Habitat is in a nominal condition.

WATER USE: 23 gallons

Water (static tank): 393 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Radios were charged after mission completion yesterday and taken off the chargers after the red charging lights turned off. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants this morning at 1100-1130 am.

WATER USE: 17 gallons used.

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: 186 grams

Summary of ScienceDome operations: GHO Officer Tyler Hines’ experiment is fully setup continuing to be monitored.

Dual split: On.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: The Musk Solar Observatory shutter doors were returned to nominal operating state by the engineers. They checked the voltage on the battery and manually actuated the switches, which fixed the issue.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: The propane alarm went through its full startup cycle again when power swapped over to the generator in the evening. This seems to happen whenever power is swapped over from one power source to another.

Operations Report – January 31th

 

 

Crew 274 Operations Report 1/31/2023

SOL: 2

Name of person filing report: Alexis Lojek

Non-nominal systems: Oven light, crew toilet

Notes on non-nominal systems: Oven light still needs a new bulb. We previously reported that the specifications of the oven light bulb type were emailed to mission support by crew 272 engineer. Around 1 pm the toilet started giving off a foul smell and Mission Support was contacted, as the crew suspected the toilet had an issue. Mission Support came to the habitat and assessed the situation, informing the crew engineers Lojek and O’Hara that Mission Support had to empty the toilet. There was a miscommunication regarding when the toilet requires emptying into the septic system, so Mission Support clarified what the correct answer is. We would recommend a drawing or diagram and more clear language be added to the Mission Handbook regarding the function of the habitat’s toilet. We appreciate the prompt response and clarification of toilet procedures. The toilet is now fixed and working nominally.

ROVERS

Spirit rover used: No

Hours: 207.5

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: No

Hours: 219.5

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: No

Hours: 254.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

General notes on rovers: None of the four rovers were used on EVA. They are all charging from last night.

Summary of Hab operations: Habitat is now in nominal condition.

WATER USE: 29 gallons

Water (static tank): 416 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: During the first EVA of the day, suits 7, 8, 9, & 10 were used. During the second EVA of the day, suits 2, 3, & 7 were used. Helmets were cleaned before, between, and after EVAs. All radios were charged after mission completion and taken off the chargers after the red charging lights turned off.

Summary of GreenHab operations: GHO Hines watered plants this morning at 0846-0910 am.

WATER USE: 14 gallons used.

Heater: On

Supplemental light: 4 hours

Harvest: None

Summary of ScienceDome operations: GHO Officer Tyler Hines completed initial setup of research equipment. Experiment is being monitored.

Dual split: On.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: The Musk Solar Observatory had issues in the afternoon (about 3 pm). The “black box” would not open the shutter. The Crew Astronomers included more detail in their own report. We would appreciate any advice on troubleshooting, as we plan to take a look at it tomorrow.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: The propane alarm went through its full startup cycle when power swapped over from the generator to the solar panels in the morning around 7 am. Is this something to be expected? Is this something we should be concerned about in any way (during power swap-over)? (Dr. Rupert responded to this question and stated that it was likely due to slow power turnover, will let know if it happens again). Copy on choosing a suit and using that the whole time.

Operations Report – January 30th

 

Crew 274 Operations Report 1/30/2023

SOL: 1

Name of person filing report: Alexis Lojek

Non-nominal systems: Oven light

Notes on non-nominal systems: Oven light still needs a new bulb. We previously reported that the specifications of the oven light bulb type were emailed to mission support by Crew 272 Engineer.

ROVERS

Spirit rover used: Yes

Hours: 207.5

Beginning charge: 100%

Ending charge: 91%

Currently charging: No

Opportunity rover used: Yes

Hours: 112.2

Beginning charge: 100%

Ending charge: 91%

Currently charging: Yes

Curiosity rover used: Yes

Hours: 219.5

Beginning charge: 100%

Ending charge: 91%

Currently charging: No

Perseverance rover used: Yes

Hours: 254.2

Beginning charge: 100%

Ending charge: 87%

Currently charging: Yes

General notes on rovers: All four rovers were used on EVA during second rover training mission to Marble Ritual. The chargers were set aside upon return to the Hab.

Summary of Hab operations: It was noted that the oven light was not working and that Crew 274 had also reported the same. The oven currently has no bulb in it, but the bulb cover is still present. No showers were taken today.

WATER USE: 46 gallons

Water (static tank): 445 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suits 1 & 4 were not utilized during EVA suit training due to Suit 1 blowers not turning on and Suit 4 having a crossthreaded coupling. The crossthreaded coupling for the vent fans on Suit 4 was fixed after the EVAs were completed. Suit 1 remains an issue and has not yet been troubleshot. Suits 2, 3, 5, & 6 were utilized during both the first and second EVAs. Helmets were cleaned before and between EVAs and different helmets were utilized for different crew members.

Summary of GreenHab operations: GHO Hines watered plants this morning at 0830-0930 am.

WATER USE: 12 gallons used.

Heater: On

Supplemental light: 4 hours

Harvest: None

Summary of ScienceDome operations: GreenHab Officer Tyler Hines continued setting up his equipment in the ScienceDome.

Dual split: Unknown, request MDRS Support guidance on what this is.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: N/A

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: What is the “dual split?” in the ScienceDome? Should we attempt to troubleshoot EVA 1?

Operations Report – January 13th

 

 

Crew 272 Operations Report 13-1-2023

SOL: 12

Name of person filing report: Mason Kuhn

Non-nominal systems: Oven light

Notes on non-nominal systems: No additional issues

ROVERS

Spirit rover used: Yes

Hours: 207.3

Beginning charge: 100%

Ending charge: 73%

Currently charging: Yes

Opportunity rover used: Yes

Hours: 112.0

Beginning charge: 100%

Ending charge: 78%

Currently charging: Yes

Curiosity rover used: No

Hours: 219.3

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Perseverance rover used: No

Hours: 253.9

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

General notes on rovers: Spirit and Opportunity were used on the EVA. They performed nominally. The chargers were draped over the front bumper upon return to the Hab. Perseverance is still at the outpost temporarily.

Summary of Hab operations: Post-sim cleanings to be conducted in the afternoon (upper deck, RAM, Sci Dome, GreenHab), and cleanings of the lower deck will be completed this afternoon with touch-up cleanings taking place in the morning of Sol 13.

WATER USE: 11.8 gallons (by 2:30pm and before cleanings that use water)

Water (static tank): 142.8 gallons

Static tank pipe heater (on or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suits 1, 5, 9, and 10 were used on the EVA. All suits performed nominally, and all are cleaned & currently charging. All radios have been charged to full, and they have been removed from the charging docks. The EVA crew had no communication issues.

Summary of GreenHab operations: Monitored and watered GreenHab crops, with a bit of extra watering due to higher temperatures. Fertilized in the afternoon. Harvested beans, chives, thyme, and dill. Planted cilantro and radishes. Cleared out dead leaves and overgrowth, distributed organic matter around GreenHab to recycle nutrients, and swept and cleaned the floor & cabinets.

WATER USE: 9 gallons

Heater: On

Supplemental light: 4 hours

Harvest: 15g beans, 3g chives, 15g thyme, 30g dill

Summary of Science Dome operations: Crew items were removed from the Science Dome, and cleanings according to the checklist to be completed shortly

Dual split: On (from approximately 8:00 pm to 8:00 am)

Summary of RAM operations: All tools from the RAM that were in the lower deck have been returned to the RAM after final measurements were made, cleanings were conducted.

Summary of any observatory issues: N/A

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – January 12th

 

 

Crew 272 Operations Report 12-1-2023

SOL: 11

Name of person filing report: Mason Kuhn

Non-nominal systems: Oven light

Notes on non-nominal systems: No additional issues, just need a new bulb. The specifications of the light bulb type have been emailed to mission support in the Sol 10 Operations Report email chain.

ROVERS

Spirit rover used: No

Hours: 207.1

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Opportunity rover used: Yes

Hours: 111.8

Beginning charge: 100%

Ending charge: 66%

Currently charging: Yes

Curiosity rover used: Yes

Hours: 219.3

Beginning charge: 100%

Ending charge: 61%

Currently charging: Yes

Perseverance rover used: No

Hours: 253.9

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

General notes on rovers: Curiosity and Opportunity were used on EVA. They performed nominally. The chargers were draped over the front bumper upon return to the Hab. Perseverance has been moved to the outpost temporarily per Mission Support’s notice.

Summary of Hab operations: The oven light was removed & inspected for its specifications. The oven currently has no bulb in it, but the bulb cover was put back on for electrical safety reasons. 1 shower was taken today, and several pasta dishes were made throughout the sol, so water usage was slightly above average. The crew has been aware that it has plenty of water left over, but in the Martian mindset, we have still been trying our best to conserve.

WATER USE: 26.2 gallons

Water (static tank): 154.6 gallons

Static tank pipe heater (on or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Suits 5, 8, 9, and 10 were used on the EVA. All suits performed nominally, and all are cleaned & currently charging. All radios have been charged to full, and they have been removed from the charging docks. The EVA crew had no communication issues.

Summary of GreenHab operations: Monitored and watered GreenHab crops. Collected relevant experimental data.

WATER USE: 8 gallons

Heater: On

Supplemental light: 4 hours

Harvest: 5g beans, 15g carrots

Summary of Science Dome operations: GreenHab Officer data collection and recording took place at the center Sci Dome table. Geologist’s samples were re-organized and are being stored on a side table of the Sci Dome.

Dual split: On (from approximately 8:00 pm to 8:00 am)

Summary of RAM operations: Tools from the RAM that are still in the lower deck of the Hab are a tape measure and a Multimeter. They will be returned to the RAM on sol 12 after the last measurements are taken for final reports.

Summary of any observatory issues: N/A

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Best Regards,

Mason Kuhn

Crew 272 Engineer

Operations Report – January 11th

 

 

Crew 272 Operations Report 11-1-2023

SOL: 10

Name of person filing report: Mason Kuhn

Non-nominal systems: Oven light, Suit 7’s vent panel on the back of the suit (one of the screw holes in the wood)

Notes on non-nominal systems: Noticed the oven light today while cooking dinner. It is definitely not an urgent problem. 1 of 2 screw holes in the wood to secure the vent panel to suit 7 is too large for the washer and nut. Ideally, the wood should be repaired/replaced, but I can temporarily secure the vent panel with a larger diameter washer and nut.

ROVERS

Spirit rover used: No

Hours: 207.1

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Opportunity rover used: No

Hours: 111.5

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: No

Hours: 219.0

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Perseverance rover used: No

Hours: 253.9

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

General notes on rovers: None were used on the EVA to Hab Ridge.

Summary of Hab operations: Suit 7 repairs were made on the lower deck, see suits summary for information. 4 showers were taken today, so the water usage was above our average.

WATER USE: 26.1 gallons

Water (static tank): 180.8 gallons

Static tank pipe heater (on or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suit 7 has been repaired! There was a loose connection in terminal 3 of the toggle switch, and the wire-organizing zip tie was too tight. These items were resulting in spotty functionality. A new zip tie is still organizing the wires inside the suit back, but it is now a bit looser. The terminal 3 connection was retightened to the underside of the toggle switch, and Suit 7 electrical systems are now nominal. Suits 8,9,10,11 were used on the EVA. All suits are charging. All radios have been charged to full and removed from the charging docks.

Summary of GreenHab operations: Monitored and watered GreenHab crops and experimental crops. The door was propped open most of the sol due to warmer temperatures.

WATER USE: 7 gallons

Heater: On

Supplemental light: 4 hours

Harvest: 5g beans

Summary of Science Dome operations: N/A

Dual split: On (from approximately 8:00 pm to 8:00 am)

Summary of RAM operations: Placed the observatory and Science Dome items in their correct locations. Retrieved needle nose pliers, wrench, and screwdriver from the RAM, they will be returned to the RAM immediately.

Summary of any observatory issues: N/A

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support:

  • Please advise if you would like me to complete the temporary repair on suit 7’s vent panel, or if you would like me to leave it as-is. The vent panel is secure, but the left side of the panel has about 0.5 inches of undesired movement.

Best Regards,

Mason Kuhn

Crew Engineer

Operations Report – January 10th

 

 

Crew 272 Operations Report 10-1-2023

SOL: 9

Name of person filing report: Mason Kuhn

Non-nominal systems: Wiring in EVA Suit 7

Notes on non-nominal systems: Due to the RAM being closed to the crew this morning, EVA, Hab operations, and time-sensitive personal items, I did not have time to repair Suit 7. This will be completed during sol 10.

ROVERS

Spirit rover used: Yes

Hours: 207.1

Beginning charge: 100%

Ending charge: 69%

Currently charging: Yes

Opportunity rover used: No

Hours: 111.5

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: No

Hours: 219.0

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Perseverance rover used: Yes

Hours: 253.9

Beginning charge: 100%

Ending charge: 58%

Currently charging: Yes

General notes on rovers: Spirit and Perseverance were used on the EVA. After returning to the Hab, per mission support request, all 4 rover positions were slightly adjusted back to their correct parking spots. A crewmate noticed that the rear-left taillight on Perseverance was non-nominal.

Summary of Hab operations: Around 8:00 pm, despite already being roped shut, the outer front airlock door flew open. The crew was prepared and scrambled to get ready with EVA Suits, boots, and other essential items. The problem was very promptly addressed, and all crew members are safe.

WATER USE: 19.6 gallons

Water (static tank): 206.9 gallons

Static tank pipe heater (on or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal (with the exception of a ~15-minute anomaly last night around 8:40 pm)

Summary of suits and radios: Suits 1, 8, 9, and 10 were used during the SAR EVA to Kissing Camel Ridge. All suits performed nominally with airflow and minimal fogging. All suits have been cleaned and are currently charging. There were no issues with radios or headsets on the EVA. All radios that were used have been charged and removed from the charging dock.

Summary of GreenHab operations: Monitored and watered GreenHab crops and experimental crops. Placed new shovels and broom in the GreenHab.

WATER USE: 7 gallons

Heater: On

Supplemental light: 4 hours

Harvest: 10g beans, 80g carrots

Summary of Science Dome operations: No crew activity, there was Mission Support activity.

Dual split: On (from approximately 8:00 pm to 8:00 am)

Summary of RAM operations: The items that were dropped off on Mars were retrieved from the RAM and put into their proper location (GreenHab, Kitchen, EVA Suit Cabinet). The items that were not retrieved and are still in the RAM are the goggles for the Sci Dome and the Observatory Items. After the supply trip was made, the Hab had an emergency situation of a blown open airlock door. This was promptly taken care of and all crew members are safe, but the storm prohibited a crew member from going to back to retrieve the remaining items. They will be taken care of when the weather permits.

Summary of any observatory issues: N/A

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support:

  • Where is the proper location for Observatory items?

Best Regards,

Mason Kuhn

Crew Engineer