Operations Report Jan 25

Crew 220 Operations Report 25JAN2020

Sol: 6

Name of person filing report: Alyx Skywalker

Non-nominal systems: Primary Generator, Water Heater

Generator: Primary is inoperable. Rental was run-the following information is for the rental.

Hours run: 26 (as reported by Outpost)

From what time last night: 17:00

To what time this morning: 07:00

List of any additional daytime hours when the generator was run: N/A

Solar- SOC% (Before the generator is run at night): 100%

Diesel Reading – 45%

Station Propane Reading- 86%

Ethanol Free Gasoline- N/A

Water (loft tank) (gal) – 50

Water Meter (units)- 0148233,4

Water (static tank) (gal) – 261

Static to loft Pump used – Yes

Water in Green Hab (gal): 184

Water in Science Dome (gal): 0

Toilet Tank Emptied – Yes

Deimos rover used: Still in the workshop

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Sojourner rover used: Yes, by Outpost

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Spirit Rover used – No

Starting Hours: 127.9

Beginning Charge: 100%

Ending Hours: 127.9

Ending Charge: 100%

Opportunity Rover used: Still in workshop

Hours:

Beginning Charge:

Ending Charge:

Currently Charging:

Curiosity Rover used: No

Starting Hours: 133.9

Beginning Charge: 100%

Ending Hours: 133.9

Ending Charge: 100%

Notes on rovers: Opportunity and Deimos off-site for maintenance. There were no EVAs today, so the rovers were not used.

ATVs Used: (Honda, 300, 350.1, 350.2, 350.3): No

Reason for use:

Oil Added? No

# hours the ATV’s were used today: 0

Notes on ATVs: None.

Habcar used and why, where? Yes. The Habcar was taken to town for water for the GreenHab.

CrewCar used and why, where? No

General Notes and Comments: None.

Summary of the internet: Nominal

Summary of Suit and Radios: Nominal

Summary of Hab: Changed loft tank water filter. Also took pictures per Outpost’s request of the loft tank’s hoses so they can replace the leaking hose.

Summary of Science Dome operations: Our hab-brewed Kombucha was examined under the microscope.

Summary of Ram operations: Nominal

Summary of any observatory issues: Nominal

Summary of Health and Safety issues: Nominal

Questions, concerns, and requests to Mission Support: None.

Operations Report Jan 25

Crew 220 Operations Report 25-JAN-2020

Sol: 6

Name of person filing report: John Hanacek

Non-nominal systems: N/A

Generator: Not Run

Hours run: 0

From what time last night: N/A

To what time this morning: N/A

List of any additional daytime hours when the generator was run: N/A

Solar- SOC% (Before the generator is run at night): n/a

Diesel Reading – N/A

Station Propane Reading- 2%

Ethanol Free Gasoline- N/A

Water (loft tank) (gal) – N/A

Water Meter (units)- N/A

Water (static tank) (gal) – N/A

Static to loft Pump used – N/A

Water in Green Hab (gal): N/A

Water in Science Dome (gal): N/A

Toilet Tank Emptied – no

Diemos rover used: N/A

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Sojourner rover used: Assigned to Director

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Spirit Rover used – N/A

Starting Hours: N/A

Beginning Charge: N/A

Ending Hours: N/A

Ending Charge: N/A

Opportunity Rover used: Still in workshop

Hours:

Beginning Charge:

Ending Charge:

Currently Charging:

Curiosity Rover used: N/A

Starting Hours: N/A

Beginning Charge: N/A

Ending Hours: N/A

Ending Charge: N/A

Notes on Rovers: Opportunity and Deimos off-site for maintenance.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): No

Reason for use:

Oil Added? No

# hours the ATV’s were used today:

Notes on ATVs:

Habcar used and why, where?

CrewCar used and why, where?

General Notes and Comments:

Summary of the internet: N/A

Summary of Suit and Radios: Nominal

Summary of Hab: Structural integrity nominal. Floors becoming dirty due to mud. Will be reinforcing with cardboard

Summary of Science Dome operations: Temperatures are hovering around 7°C during the day.

Summary of Ram operations: Nominal

Summary of any observatory issues: Nominal

Summary of Health and safety issues: Nominal

Questions, concerns, and requests to Mission Support: None

Operations Report – January 24th

MDRS-MAU Crew 220 Operations Report 24-01-2020

SOL: 05

Name of person filing report: John Hanacek

Non-nominal systems: none

Notes on non-nominal systems: n/a

Generator: Nominal

Hours run: 0 hours

From what time last night: n/a

To what time this morning: n/a

List any additional daytime hours when the generator was run:

Station Propane Reading – ~2%

Ethanol Free Gasoline: 5 gallons

Water (Containers): 17 gallons

Toilet tank emptied: no

General notes and comments: Setup decision to dig drainage canals around MAU base pays off as snow thaws

Summary of internet: n/a

Summary of suits and radios: nominal

Summary of Hab operations: nominal

Summary of health and safety issues: Continual monitoring of all crew during cold night conditions

Questions, concerns and requests to Mission Support: none

Operations Report – January 24th

  

Operations Report

Crew 220 Operations Report 24-JAN-2020

Sol: 5

Name of person filing report: Alyx Skywalker

Non-nominal systems: Primary Generator, Water Heater

Generator: Primary is inoperable. Rental was run-the following information is for the Rental.

Hours run: 14

From what time last night: 17:00

To what time this morning: 07:00

List of any additional daytime hours when the generator was run: N/A

Solar- SOC% (Before the generator is run at night): 82%

Diesel Reading – 45%

Station Propane Reading- 92%

Ethanol Free Gasoline- N/A

Water (loft tank) (gal) – 50

Water Meter (units)- 0148172,4

Water (static tank) (gal) – 307

Static to loft Pump used –Yes

Water in Green Hab (gal): 192

Water in Science Dome (gal): 0

Toilet Tank Emptied –No

Diemos rover used: Still in the workshop

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Sojourner rover used: Yes, by Outpost

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Spirit Rover used – No

Starting Hours: 127.9

Beginning Charge: 72%

Ending Hours: 127.9

Ending Charge: 100%

Opportunity Rover used: Still in workshop

Hours:

Beginning Charge:

Ending Charge:

Currently Charging:

Curiosity Rover used: No

Starting Hours: 133.9

Beginning Charge: 74%

Ending Hours: 133.9

Ending Charge: 100%

Notes on Rovers: Opportunity and Deimos off-site for maintenance. When EVA team left the airlock they discovered the rovers were not at 100% charge. The EVA team reported this and then proceeded on foot. Upon investigation it was realized that the extension cord was not plugged into the MDRS Station. The extension was plugged in and the Rovers were then charged.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): No

Reason for use:

Oil Added? No

# hours the ATV’s were used today: 0

Notes on ATVs: None.

Habcar used and why, where? Yes. Twice the Habcar was taken to town for water for the GreenHab.

CrewCar used and why, where? No

General Notes and Comments: None.

Summary of the internet: Nominal

Summary of Suit and Radios: Nominal

Summary of Hab: Nominal

Summary of Science Dome operations: Science was conducted.

Summary of Ram operations: Nominal

Summary of any observatory issues: Nominal

Summary of Health and Safety issues: See Health and Safety Officer’s report.

Questions, concerns, and requests to Mission Support: None

Operations Report – January 23rd

  

 Crew 220 Operations Report
SOL: 4

Submitting Report: Lee Roberts, Crew Engineer

Non-nominal systems: Primary generator and water heater are inoperative

Generator: Primary generator is offline, power system operating on rental generator

Hours Run: 7:30

Start Time: Ran through the night

End Time: 0730

Solar SOC: 82%

Diesel Reading: 49%

Station Propane Reading: 90%

Ethanol Free Gasoline: N/A

Water in Loft Tank: 50 Gallons

Water Meter: 148107.4

Water in Static Tank: 352 Gallons

Static to Loft Tank: 43 Gallons

Water in GreenHab Tank: 211 Gallons

Water in Science Dome: N/A

Toilet Tank Emptied: Yes

Spirit Rover Used: Yes

Ending Hours: 127.9

EVA 1 Beginning Charge: 100%

EVA 1 Ending Charge: 88%

EVA 2 Beginning Charge: 100%

EVA 2 Ending Charge: 74%

Curiosity Rover Used: Yes

Ending Hours: 133.8

EVA 1 Beginning Charge: 100%

EVA 1 Ending Charge: 87%

EVA 2 Beginning Charge: 100%

EVA 2 Ending Charge: 72%

Notes on Rovers: None

ATVs Used: None

HabCar Used, Why, Where? Negative

Crew Car Used, Why, Where? Negative
General Notes and Comments: None

Summary of Internet: Internet is operating nominally

Summary of Suits and Radios: Communications were intermittent on two of the radios. Spent the afternoon troubleshooting.

Summary of Hab Operations: With noted exceptions, hab systems are operating nominally. The ventilation system air filter was replaced this morning.

Summary of GreenHab Operations: The automatic timer on the lights was out of sync due to the power outage of the last two days. I am resetting the time to correspond to the local clock time. Please refer to the GreenHab Report for further details.

Summary of RAM Operations: An air filter was taken from the RAM supply closet to replace the ventilation system air filter.

Summary of Observatory Issues: None

Summary of Health and Safety Issues: Please refer to the Health and Safety Report

Questions, concerns, and requests to Mission Support: We have no specific concerns or requests at this time

Operations Report – January 22nd

MAU Crew 001 Operations Report 22-01-2020

SOL: 03

Name of person filing report: John Hanacek

Non-nominal systems: none

Notes on non-nominal systems: n/a

Generator: Nominal

Hours run: 4 hours

From what time last night: 1:00

To what time this morning: 4:00

List any additional daytime hours when the generator was run:

Station Propane Reading – ~2%

Ethanol Free Gasoline: 0 gallons

Water (Containers): 30 gallons

Toilet tank emptied: no

General notes and comments:

Summary of internet: n/a

Summary of suits and radios: nominal

Summary of Hab operations: nominal

Summary of health and safety issues: Continual monitoring of all crew during cold night conditions

Questions, concerns and requests to Mission Support: none

Operations Report – January 21st

MAU Crew 001 Operations Report 21-01-2020

SOL: 02

Name of person filing report: John Hanacek

Non-nominal systems: none

Notes on non-nominal systems: n/a

Generator: Nominal

Hours run: ~ 5 hours

From what time last night:

To what time this morning: 11:08

List any additional daytime hours when the generator was run:

Station Propane Reading – ~80%

Ethanol Free Gasoline: 0 gallons

Water (Containers): 35 gallons

Toilet tank emptied: no

General notes and comments:

Summary of internet: n/a

Summary of suits and radios: nominal

Summary of Hab operations: nominal

Summary of health and safety issues: Continual monitoring of all crew during cold night conditions

Questions, concerns and requests to Mission Support: none

Operations Report – January 22nd

Crew 220 Operations Report

SOL: 3

Submitting Report: Lee Roberts, Crew Engineer

Non-nominal systems: None

Generator: Standby Rental Generator

Hours Run: 0

Generator running times

Start Time: N/A

End Time: N/A

Total Run Time: 0 hours

Solar SOC: 100%

Diesel Reading: 49%

Station Propane Reading: 24%

Ethanol Free Gasoline: N/A

Water in Loft Tank: 30 Gallons

Water Meter: 148045.7

Water in Static Tank: 395 Gallons

Static to Loft Tank: 49 Gallons

Water in GreenHab Tank: 222 Gallons

Water in Science Dome: N/A

Toilet Tank Emptied: No

Spirit Rover Used: No

Ending Hours: 127.7

Beginning Charge: N/A

Ending Charge: 100%

Curiosity Rover Used: No

Ending Hours: 133.7

Beginning Charge: N/A

Ending Charge: 100%

Notes on Rovers: None

ATVs Used: None

HabCar Used, Why, Where? Negative

Crew Car Used, Why, Where? Negative

General Notes and Comments: None

Summary of Internet: While restoring Hab power the Internet router failed to power up properly. After several attempts to reboot the router, Outpost was contacted and advised of the concern. The router was sent to them, and they are working on repairing or replacing it. Two crew members from the MAU team brought a router that they had in their possession and installed it as a temporary replacement, with the permission of Outpost.

Summary of Suits and Radios: No EVAs were conducted from MDRS today, but crew members drilled in donning and doffing procedures. Suits and radios are all charging after restoration of power, and all systems appear to be operating nominally.

Summary of Hab Operations: We were still in emergency operations for the first portion of the day, but power was restored with a standby rental generator at approximately 0900. The decision was made to restore power to electrical systems with a staggered ramp up, beginning with radio comms, then suits, rovers, and Internet, and then full load after the SOC was stable above 50%. All systems appear to be operating nominally at this time. Our crew is extremely grateful for the dedicated effort of the Outpost team in restoring power for us.

Summary of GreenHab Operations: Please refer to the GreenHab Report

Summary of RAM Operations: No operations today

Summary of Observatory Issues: None

Summary of Health and Safety Issues: Please Refer to the Health and Safety Report

Questions, concerns, and requests to Mission Support:We have no specific concerns or requests at this time.

Operations Report – January 20th

   

Crew 220 Operations Report

SOL:1

Submitting Report: Alyx Skywalker, Crew Scientist (Engineer unavailable to report)

Non-nominal Systems: Generator

Generator: Inoperable

Hours Run: 0

Generator running times (Radio Outpost for info) Start Time (HH:MM) = N/A

End Time (HH:MM) = N/A

Total Run time (Hrs) = 0

Solar—SOC %: 0

Diesel Reading: 49%

Station Propane Reading: 25%

Ethanol Free Gasoline: N/A

Water (Loft Tank): 34 gallons in tank

Water Meter: 148,001.8

Water (Static Tank): 487

Static to Loft Pump used – No

Water in GreenHab—245.5 gallons (6.5 gallons for plants, 8 gallons taken to Hab in state of Emergency)

Water in Science Dome: N/A

Toilet Tank Emptied: No

EVA 1

Spirit Rover Used: Yes

Hours: 127.3

Beginning Charge: 100%

Ending Charge: 84%

Currently Charging: Yes

Curiosity Rover Used: Yes

Hours: 133.0

Beginning Charge: 100%

Ending Charge: 87%

Currently Charging: Yes

EVA 2

Spirit Rover Used: Yes

Hours: 127.7

Beginning Charge: 100%

Ending Charge: 78%

Currently Charging: Yes

Curiosity Rover Used: Yes

Hours:133.7

Beginning Charge: 100%

Ending Charge: 72%

Currently Charging: Yes

Notes on Rovers: None

ATV’s Used: None

HabCar Used and why, where? Did not use today.

General Notes and Comments: None

Summary of Internet: 300mb

Summary of Suits and Radios: Suits are in good working conditions. During our EVAs many of our Radios died despite being fully charged. Currently all the yellow radios work and only 2 blue ones are working. We are charging all radios to test them once charged. Additionally, we only have 2 headsets that worked during our EVAs today.

Summary of Hab Operations: We have been operating on a state of emergency power due to the generator not being functional. We have used minimal lighting and are currently on flashlight power. We have not used Hab power for charging devices today although we did charge the spacesuits, radios and rovers. We did not fill the Loft tank today and have been using as little water that is driven from a pump as possible today to conserve what power we had.

Summary of GreenHab Operations: See GreenHab report

Summary of ScienceDome Operations: No operations today

Summary of RAM Operations: No operations today

Summary of any observatory issues: No issues

Summary of Health and Safety issues: See Health and Safety Report

Questions, concerns and requests to Mission Support: We just request to be kept appraised of the generator situation, especially to be notified when the state of emergency is over or any updates as to the duration of the state of emergency so that we can take appropriate steps.

Operations Report – January 18th

Crew 219 Operations Report 18-JAN-2020

Sol: 13

Name of person filing report: Alejandro Perez

Non-nominal systems: N/A

Generator: Run

Hours run: 13.5

From what time last night: 17:30

To what time this morning: 07:00

List of any additional daytime hours when the generator was run: N/A

Solar- SOC% (Before the generator is run at night): 80%

10:00 = 95%; 11:00 = 93%; 12:30 = 91%; 13:45 = 90%; 15:30 = 86% 16:30 = 82%

Diesel Reading – 55%

Station Propane Reading- 29%

Ethanol Free Gasoline- N/A

Water (loft tank) (gal) – 50

Water Meter (units)- 0147887,4

Water (static tank) (gal) – 206

Static to loft Pump used –Yes

Water in Green Hab (gal): 133.39

Water in Science Dome (gal): 0

Toilet Tank Emptied –Yes

Diemos rover used: Still in the Work shop

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Sojourner rover used: Assigned to Director

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Spirit Rover used- No

Starting Hours: 126.4

Beginning Charge: 100%

Currently Charging: Yes

Ending Hours:

Ending Charge:

Opportunity Rover used: Still in workshop

Hours:

Beginning Charge:

Ending Charge:

Currently Charging:

Curiosity Rover used: No

Starting Hours: 132.4

Beginning Charge: 100%

Currently Charging: Yes

Ending Hours:

Ending Charge:

Notes on Rovers: Opportunity and Deimos off-site for maintenance.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): No

Reason for use:

Oil Added? No

# hours the ATV’s were used today:

Notes on ATVs:

Habcar used and why, where? Yes, by Outpost for to get Crew 220

CrewCar used and why, where? On campus.

General Notes and Comments:

Summary of the internet: Nominal

Summary of Suit and Radios: Nominal

Summary of Hab: Nominal

Summary of Science Dome operations: Nominal

Summary of Ram operations: Nominal

Summary of any observatory issues: Nominal

Summary of Health and safety issues: See HSO report.

Questions, concerns, and requests to Mission Support:

Copyright © The Mars Society. All rights reserved. | Main Site