Operations Report – November 21st

Crew 215 Operations Report 21-Nov-2019
SOL: 11
Name of person filing report: Shane Usher
Non-nominal systems: N/A
Notes on non-nominal systems: N/A
Generator: run
Hours run: 12 h 10 min
From what time last night: 1850
To what time this morning: 0700
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night): 69%
Diesel Reading – 45%
Station Propane Reading – 65%
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1459976
Water (static tank) (gal): 276
Static to Loft Pump used – yes
Water in Green Hab (gal): 234.5
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: no
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Sojourner rover used: Assigned to Director
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Spirit rover used: no
Hours: 112.7
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 100%
Currently charging: yes
Opportunity rover used: no
Hours: 69
Beginning charge: 100%
Ending charge: 100%
Currently charging: yes
Curiosity rover used: no
Hours: 119.1
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 100%
Currently charging: yes
Notes on rovers: N/A
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used (gal): 0
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director
HabCar used and why, where? With Director
CrewCar used and why, where? At Grand Junction awaiting Crew 216
General notes and comments: N/A
Summary of internet: Functional
Summary of suits and radios: N/A
Summary of Hab operations: N/A
Summary of GreenHab operations: Atmospheric equalization to the green hab carried out
during the afternoon, plants were watered (16L,4.6 gal). Door closed at 5pm, heater on
overnight.
Summary of Science Dome operations: Gypsum tile synthesis experiments concluded, splint
manufacture conducted.
Summary of RAM operations: N/A
Summary of any observatory issues: Nominal
Summary of health and safety issues: Checklist controlled safety medical drill carried
out.
Questions, concerns and requests to Mission Support: N/A

Copyright © The Mars Society. All rights reserved. | Main Site