Operations Report 23Nov2019
Crew 216 Operations Report 23-Nov-2019 |
SOL: -1 |
Name of person filing report: Shane Usher/Mike Lawson |
Non-nominal systems: N/A |
Notes on non-nominal systems: N/A |
Generator: run |
Hours run: 12 h -5 min |
From what time last night: 1910 |
To what time this morning: 0705 |
List any additional daytime hours when the generator was run: N/A |
Solar— SOC % (Before generator is run at night): 72% |
Diesel Reading – 45% |
Station Propane Reading – 63% |
Ethanol Free Gasoline: N/A |
Water (loft tank) (gal): 47 |
Water Meter (units): 1460749 |
Water (static tank) (gal): 500 |
Static to Loft Pump used – yes |
Water in Green Hab (gal): 225.7 |
Water in Science Dome (gal): 0 |
Toilet tank emptied: yes |
Deimos rover used: no |
Hours: – |
Beginning charge: – |
Ending charge: – |
Currently charging: – |
Sojourner rover used: Assigned to Director |
Hours: – |
Beginning charge: – |
Ending charge: – |
Currently charging: – |
Spirit rover used: no |
Hours: 112.7 |
Beginning charge: (Before EVA): 100% |
Ending charge: (On return from EVA, before recharging): 100% |
Currently charging: yes |
Opportunity rover used: no |
Hours: 69 |
Beginning charge: 100% |
Ending charge: 100% |
Currently charging: yes |
Curiosity rover used: no |
Hours: 119.1 |
Beginning charge: (Before EVA) : 100% |
Ending charge: (On return from EVA, before charging): 100% |
Currently charging: yes |
Notes on rovers: N/A |
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no |
Reason for use: N/A |
Oil Added? no |
ATV Fuel Used (gal): 0 |
# Hours the ATVs were used today: 0 |
Notes on ATVs: Assigned to the director |
HabCar used and why, where? With Director |
CrewCar used and why, where? At MDRS |
General notes and comments: N/A |
Summary of internet: Functional |
Summary of suits and radios: N/A |
Summary of Hab operations: N/A |
Summary of GreenHab operations: Atmospheric equalization to the green hab carried out during the afternoon, plants were watered (16L,4.6 gal). Door closed at 5pm, heater on overnight. |
Summary of Science Dome operations: N/A |
Summary of RAM operations: N/A |
Summary of any observatory issues: Nominal |
Summary of health and safety issues: Broken smoke alarm in Greenhab will be replaced. |
Questions, concerns and requests to Mission Support: N/A |
Crew 216 Sol Summary 23Nov2019
[title Sol Summary – November 23rd]
[category sol-summary]
Crew 216 Sol Summary Report 23-NOV-2019
Sol: -1
Summary Title: Change over day
Author’s name: Marc Levesque
Mission Status: Inactive
Sol Activity Summary: Today was a hand over day with Crew 215 who introduced our crew to MDRS and its systems. We have learned engineering procedures, identified EVA locations, GreenHab operations, inquired about rover operations, but tomorrow is when all the familiarizations will be carried out.
Look Ahead Plan: Tomorrow we will be running through Science Dome operations, GreenHab operations, RAM operations, EVA procedures and equipment, rover operations, and familiarization of the Hab operations, including cooking, cleaning, and maintenance.
Anomalies in work: N/A.
Weather: Just freezing overnight, light winds, clear skies.
Crew Physical Status: Healthy
EVA: N/A
Reports to be file: Sol Summary Report, Operations Report
Support Requested: N/A