Crew 275 Operations Report 25Feb2023
SOL: 13
Name of person filing report: Quentin Royer
Non-nominal systems:
• Toilet
• Spacesuit n°9
• GreenHab Carbon Monoxide alarm
Notes on non-nominal systems: None
ROVERS
Spirit rover used: Yes
• Hours: 209.6
• Beginning charge: 100%
• Ending charge: 68%
• Currently charging: Yes
Opportunity rover used: No
• Hours: 113.4
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes
Curiosity rover used: Yes
• Hours: 221.4
• Beginning charge: 100%
• Ending charge: 68%
• Currently charging: Yes
Perseverance rover used: No
• Hours: 255.8
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes
General notes on rovers: Rovers were used during today’s EVA. Nothing to report.
Summary of Hab operations: The Crew conducted routine operations.
• WATER USE: 38.62 – It is the beginning of the tank, so the formula could be inaccurate
• Water: 502.11 gallons
• Static tank pipe heater: On
• Static tank heater: On
• Toilet tank emptied: Yes
Summary of internet: Hughes Net was used during the day before the opening of COMMS for email purposes, and Starlink (MDRSCampus-Guest) is used during COMMS. MDRScampus is used for experimental purpose.
Summary of suits and radios: Suits and radios were used during today’s EVA. Nothing to report.
Summary of GreenHab operations: The Crew botanist conducted routine operations, and harvested some tomatoes.
• WATER USE: 13.74 gallons
• Heater: On
• Supplemental light: No
• Harvest: 1541 g of tomatoes
Summary of ScienceDome operations: The Crew Scientist conducted routine operations, and tests for the Human Factors experiment were performed.
• Dual split: Switched off during the night
Summary of RAM operations: No operations were conducted in the RAM today.
Summary of any observatory issues: Nothing to report.
Summary of health and safety issues: Nothing to report.
Questions, concerns, and requests to Mission Support:
• The non-nominal GreenHab Carbon Monoxide detector was placed in the RAM.