Operations Report – March 6th

Crew 293 Operations Report 06-03-2024

SOL: 17

Name of person filing report: Leo Tokaryev

Non-nominal systems:

Notes on non-nominal systems:

ROVERS

Spirit rover used:no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used:yes

Hours:165.3

Beginning charge:100

Ending charge:52

Currently charging:no

Curiosity rover used: yes

Hours: 269.9

Beginning charge:100

Ending charge:42

Currently charging:no

Perseverance rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

General notes on rovers:

Summary of Hab operations: put notes here

WATER USE: 15.6 gallons

Water (static tank): 239.3 gallons

Static tank pipe heater (on or off):On

Static tank heater (On or off)On

Toilet tank emptied: yes

Summary of internet: none

Summary of suits and radios:

Summary of GreenHab operations: put notes here

WATER USE: 6 gallons

Heater: On

Supplemental light: 22h-2h automatic

Harvest: none

Summary of ScienceDome operations: none

Dual split: Heat or AC, On

Summary of RAM operations: none

Summary of any observatory issues: none

Summary of health and safety issues: none

Questions, concerns and requests to Mission Support: we have left some trash in the rear airlock, could you please take it out?

EVA Report – March 6th

Crew 293 EVA Report 06Mar2024

EVA #012

Author: Yves Bejach (EVA Leader)

Purpose of EVA: Going back to Candor Chasma to create a better 3D map. As usual, we’ll go through the atmospheric site for data retrieval and changing batteries

Start time: 10:00

End time: 13:36

Narrative: We quickly changed the batteries and retrieved the data of the atmospheric instruments then went back to Candor Chasma. We scanned the area again, with a new strategy.

Suit 8 – 13,18V

Suit 6 – 13,36V 2,5 LPM

Suit 1 – 13,37V – 2,6 LPM

9:55 Start of the EVA

10:00 Out on Mars

10:04 Opportunity 165.3 100%

10:04 Curiosity 269.9 100%

10:06 Atmospheric instrument’s site, unloading the rovers

10:18 Data retrieved, battery switched, instruments turned on, going back to the rovers

10:19 Leaving the site with the rovers

10:21 Switching to channel 1

10:29 Galileo Road

10:36 Compass Rock, leaving the rovers, walking to Candor Chasma

10:48 Arrived at the entrance of Candor Chasma

11:08 end of the canyon, starting photogrammetry soon (15min of walk to go back to rovers)

11:25 to 12:41 Everything is okay. Contacting every 15min

12:47 Photogrammetry finished, soon leaving Candor Chasma

13:03 Out of Candor Chasma, walking back to the rovers

13:13 Back to the rovers, leaving the site

13:19 Stopped to take pictures, leaving the picture’s site

13:24 Passing in front of North Ridge

13:29 Opportunity 52%, Curiosity 42%

13:31 Pressurization start

13:36 End of EVA, back into the Hab

Suit 8: 12,76V

Suit 6: 12,88V 2,2

Suit 1: 12,91V 2,3

Destination: Atmospheric site: between the Hab and Marble Ritual and then Candor Chasma

Coordinates (use UTM WGS 84): Atmospheric Site: 518500,4251000 ; Candor Chasma: 520500,4251000

Participants: Yves Bejach, Leo Tokaryev, Mathurin Franck

Road(s) and routes per MDRS Map: Cow Dung Road, North direction by rover then walking through Gateway to Candor.

Modes of travel: Curiosity Rover and Opportunity Rover and walking

GreenHab Report – March 6th

Crew 293 GreenHab Report 06-03-2024

GreenHab Officer: Mathurin FRANCK

Environmental control: (heater, fan, door open?) Heater/fan turning on automatically

Average temperatures: between 70°F- 90°F

Hours of supplemental light: 10pm-2am

Daily water usage for crops: 6G

Daily water usage for research and/or other purposes: None

Water in Blue Tank (200 gallon capacity): 192 gallons

Time(s) of watering for crops: 9:15 am 7:00pm

Changes to crops:

None

Narrative: /

Harvest: (include which crop and mass in grams): None

Support/supplies needed: /

EVA Report – March 8th

Crew 293 EVA Report 08-03-2024

EVA 13

Author: Leo Tokaryev

Purpose of EVA: 3D Photogrammetry EVA at Candor Chasma

Start time: 08:48

End time:12:34

Narrative:

08:35 all suits are tested and are above 13V

08:48 beginning of depressurization

08:53 end of depressurization

08:55 rovers are loaded, drone is deployed

08:56 drone taking off

Curiosity: 100%, 270.3(Yves)

Opportunity: 100%, 165.9(Marie and Lise)

08:59 leaving to atmospheric instruments site

09:01: arriving at site

09:16 data retrieved

09:19 drone landed

09:26 drone taking off second time

09:30 leaving the site and heading to candor chasma

09:33 switching to channel 1

09:45 parked, start to walking towards candor chasma

09:47 the drone has landed

10:00 entrance to candor chasma

10:20 tentative of contact, can’t hear very well

10:34 halfway through finding

10:50 everything is ok

11:16 done searching, taking pictures and getting ready to go back

11:44 walking towards the rovers

12:06 back at the rovers

12:09 leaving candor chasma

12:25 back at campus

Curiosity 38%

Opportunity 48%

12:29 beginning of pressurization

12:34 end of pressurization and successful end of EVA

Suits 1,2 and 3 respectively: 12.82, 12.56, 12.57

Destination: Candor Chasma

Coordinates (use UTM WGS 84): 520500, 4251000

Participants: Marie(EVA Leader), Yves and Lise

Road(s) and routes per MDRS Map: Cow Dung Road, North direction, then Galileo Road to Compass Rock

Mode of travel: Rovers and walking

Operations Report – March 8th

Crew 293 Operations Report 08-03-2024

SOL: 19

Name of person filing report: Leo Tokaryev

Non-nominal systems:

Notes on non-nominal systems:

ROVERS

Spirit rover used:no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used:yes

Hours:165.9

Beginning charge:100

Ending charge:48

Currently charging:yes

Curiosity rover used: yes

Hours: 270.3

Beginning charge:100

Ending charge:38

Currently charging:yes

Perseverance rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

General notes on rovers:

Summary of Hab operations: put notes here

WATER USE: 18.7 gallons

Water (static tank): 208 gallons

Static tank pipe heater (on or off):On

Static tank heater (On or off)On

Toilet tank emptied: no

Summary of internet: none

Summary of suits and radios:

Summary of GreenHab operations: put notes here

WATER USE: 8 gallons

Heater: On

Supplemental light: 22h-2h automatic

Harvest: none

Summary of ScienceDome operations: none

Dual split: Heat or AC, On

Summary of RAM operations: none

Summary of any observatory issues: none

Summary of health and safety issues: none

Questions, concerns and requests to Mission Support:none

Sol Summary – March 8th

Crew 293 Sol Summary Report 08-03-2024

Sol: 19

Summary Title: Martian Topography

Author’s name: Marie Delaroche, Crew Commander

Mission Status: Nominal

Sol Activity Summary:

Today’s exploration of Candor Chasma with the 3D map was a success. All checkpoints were reached in less than an hour, leaving plenty of time to enjoy the beauty of the canyon and take pictures. The walk from the rovers to the chosen photogrammetry site was long, but the EVA was well timed and planned, and the Martian landscapes were worth it. The Crew Scientist, HSO and I returned from Candor Chasma before 1 PM, and we enjoyed lunch with the rest of the Crew.

In the afternoon, scheduling made it so that the Science Dome was occupied almost constantly, rushing the pace of the assessments and experiments a bit. No setbacks were experienced. The Crew Astronomer continued working on their project in the Observatory, while the GreenHab Officer started working on the drone footage shot this morning, at the beginning of the EVA. It looks quite promising!

Tonight, I assisted the Crew Astronomer in repairing the Observatory dome, an operation which proved unsuccessful; we ended up securing the opening with a tarp. Hopefully, we will be able to repair the dome when the sun comes up.

The length and intensity of the mission have slowly started to take their toll on the Crew; we are looking forward, after tomorrow’s second exploration EVA to Candor Chasma, to a restful 21st Sol.

Look Ahead Plan:

We have planned a second exploration EVA to Candor Chasma, involving another team of astronauts having prepared the EVA using the 2D map of the site. A stop will be made at the atmospheric instruments to retrieve the data and change the batteries.

Anomalies in work: NA

Weather: Sunny, Low 2°C, High 15°C

Crew Physical Status: Nominal

EVA: Candor Chasma exploration with 3D map

Reports to be filed: Sol Summary, Journalist’s Report, GreenHab Report, Operations Report, Photos (6-8 pics), EVA Report, EVA Request, Astronomy Report

Support Requested: NA

Astronomy Report – March 8th

[category  astronomy-report]

Astronomy Report

Name: Léa Bourgély

Crew: 293

Date: 08/03/2024

MDRS SOLAR OBSERVATORY

Telescope Requested: Solar Observatory

Objects to be Imaged this Evening: None

Images submitted with this report: None

Additional Notes:

1. The lower part of the shutter is stuck. We have oriented it away from the wind and taped a big tarp on it to prevent sand from entering. The telescope is covered with its aluminium tarp, and closed. Everything is turned off.

Journalist Report – March 8th

SOL 19: Martian topography

"And now here is my secret, a very simple secret: It is only with the heart that one can see rightly; what is essential is invisible to the eye." – The Little Prince, Antoine de Saint-Exupéry

The photogrammetry EVA of this morning was a huge success! Even though Mathurin and Yves weren’t fully convinced by the 3D map of Candor Chasma generated by photogrammetry, Lise and Marie found all the checkpoints surprisingly quickly: they went through the 12 checkpoints in less than one hour! They identified yesterday the checkpoints thanks to the 3D map, and prepared the path they wanted to follow. It seems like their preparation was efficient! Even though they were fast in finding the checkpoints, the EVA lasted 4 hours because Candor Chasma is located far from the station, and we had to walk a lot to arrive at the searching site. Assisted by Yves during the EVA, Lise and Marie came back to the Hab exhausted by their expedition, but proud of their performance!

This morning during the EVA, Mathurin piloted the drone from the inside of the Science Dome in order to take pictures of a future path we’ll take on an EVA, and to capture images of the station from the sky! For the seven of us, it was strange to see our living place being so little and seeming lost in the huge Martian desert. On his side, Leo, while he was HabCom for the EVA, meaning he was in permanent contact with the EVA Crew, cooked some pancakes for the Crew. We were delighted to eat them as a dessert for lunch!

Like almost every day, various Crew members did cognitive assessments. For the Orbital Architecture experiment, we perform 3 tests per week and per Crew member, in three different places of the station: the Hab, our major living and working place; the GreenHab, a silent place close to nature; and the Science Dome, a more peaceful working place. Today, there were tests in each module! The tasks we must perform are various, but mostly about concentration, working memory and multitasking.

Finally, at the end of the day, Léa and I prepared tomorrow’s EVA. We’ll go to Candor Chasma as well, but we prepared ourselves with a regular 2D map. It will be hard to counteract Lise and Marie’s performance from this morning!

GreenHab Report – March 8th

Crew 293 GreenHab Report 08-03-2024

GreenHab Officer: Mathurin FRANCK

Environmental control: (heater, fan, door open?) Heater/fan turning on automatically

Average temperatures: between 70°F- 100°F

Hours of supplemental light: 10pm-2am

Daily water usage for crops: 8G

Daily water usage for research and/or other purposes: None

Water in Blue Tank (200 gallon capacity): 172 gallons

Time(s) of watering for crops: 10:00 am 5:00pm

Changes to crops:

I have replanted radish

Narrative:

Harvest: (include which crop and mass in grams): /

Support/supplies needed: /

Copyright © The Mars Society. All rights reserved. | Main Site