Crew 297 Operations Report 15-04-2024
SOL: 1
Name of person filing report: Matt Lynch (Engineer)
Non-nominal systems: Suit 5 (ventilation electrical connection), Suit 2 (stuck valve) Suit 9 (broken visor), and Suit 3 (loose power connection)
Notes on non-nominal systems: The issues with Suit 5, 2, and 9 were already noted before our mission. We found the issues with suit 3 before EVA #2.
ROVERS
Spirit rover used:
Hours: 251.0
Beginning charge: 100
Ending charge: 80
Currently charging: No
Opportunity rover used:
Hours: 178.6
Beginning charge: 100
Ending charge: 72
Currently charging: No
Curiosity rover used:
Hours: 277.5
Beginning charge: 100%
Ending charge: 84%
Currently charging: No
General notes on rovers: NA
Summary of Hab operations:
WATER USE: 9.5 gallons
Water (static tank): 420.5 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: yes
Summary of internet:
Summary of suits and radios:
Radios 1,2,3,4, 5 and 6 were used.
EVA Suits 4,6,7,8,10 and 11 were used.
Summary of GreenHab operations: First time observing and watering of all plants in the greenhab.
WATER USE: 4.25 gallons
Heater: On
Supplemental light: N/A
Harvest: None
Summary of ScienceDome operations: NA
Summary of RAM operations: (Tools used, work done): NA
Summary of any observatory issues: NA