Crew 299 Operations Report 5-24-2024
SOL: 12
Name of person filing report: Rishabh Pandey (Engineer)
Non-Nominal Systems: Suit 9 (broken visor), Suit 11 (fan issue)
Notes on non-nominal systems: Issues with both suits were noted before our mission, both will not be used during our mission.
ROVERS
Rovers Used: None
General notes on rovers: None
Summary of Hab operations:
WATER USE: 41 Gallons
Water (static tank): 178.3 (using effective value from spreadsheet) (was also refilled today)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: yes
Summary of internet usage: Catch up on Earthly news, email responses, code development, entertainment
Summary of suits and radios: No suits or radios used.
Summary of GreenHab operations: NA, GreenHab out of operation
Summary of ScienceDome operations: Final soil analysis was conducted.
Summary of RAM operations: Measuring tape used.
Summary of observatory issues: NA