Non-Nominal Systems: Hab wall heater, Perseverance and Spirit. EVA suit 9, Solar Power inverters slave 1&2, battery bank.

Power system:
Solar: Malfunctioning inverters still out for repairs. One battery bulged and has been removed from the battery bank. Remaining 23 batteries are connected back and currently operational. Control panel did not restart correctly multiply times and does not send SOC to web monitor.
Generator run time: 6201.6 hours. Locked for summer. Portable generator stored for summer in RAM."

Propane Readings:
Station Tank: 77%
Director Tank: 65%
Intern Tank: 76%
Generator Tank: 70%
All tank’s valves closed for summer"

Water:
Hab Static Tank – 200 gallons
GreenHab – 0 gallons
Outpost tank – 100 gallons
Science Dome – 0 gallons
Septic Tanks emptied: No"

Rovers: All rovers are shipped for repairs to Richfield. See packing slip for more information.

ATV: ATV’s Used: None. Nothing to report.

Cars: Hab Car used and why, where: Parked on campus for summer. Odometer: 173006.2 miles.
Crew Car used and why, where: Parked at the outpost for summer. Odometer: 226693 miles.
General notes and comments: Ignition problem persists in habcar. Can get it to start by resetting into park and trying to pull the shifter as high as possible.

Summary of Internet: All nominal.

EVA suits and radios:
Suits: All suits and parts are ready for a pick up.
Comms: All handheld radios brought to Science Dome for summer. Repeater inspected and pictures taken.

Campus wide inspection, if action taken, what and why: Prepared for summer, see pictures for more information.
Tunnels – all tarp removed and inspected.

Summary of Hab Operations: Prepared for summer, see pictures for more information.
Upper deck: fridge emptied and unplugged; all food removed for summer; all necessary devices unplugged; all temperature sensitive devices moved to Science Dome; rat poison and mouse traps have been set up; trash emptied; south window covered; secondary light left on for safety;
Lower deck: outside outlets turned off; inventory pictures taken; toilet emptied; heater breaker is off; water pump breaker is off; pump solenoid valve moved to off position; UV filter is off; all necessary devices unplugged; all temperature sensitive devices moved to Science Dome; trash emptied; rat poison and mouse traps have been set up; all doors locked; safety lights turned on.

Summary of GreenHab Operations: Prepared for summer, see pictures for more information: all necessary devices unplugged; all temperature sensitive devices moved to Science Dome; all breakers set off; new soil brought in; door closed.

Summary of SciDome Operations: Prepared for summer, see pictures for more information: trash emptied; power system operational; AC set up for 75F; summer camera set up; all necessary devices unplugged; safety lights turned on; all windows covered; door locked.

Summary of Observatories Operations: All nominal. Robotic observatory transferred to starlink internet.

Summary of RAM Operations: Prepared for summer, see pictures for more information: all temperature sensitive equipment moved to Science Dome; large ladders moved inside; roll door secured; outside outlets turned off; trash emptied; generator supplies inventory taken; front door and outside breakers locked.

Summary of Outpost Operations: Prepared for summer, see pictures for more information: Shed locked and all gates closed.
Intern trailer: toilet emptied; all windows covered; fridge, heater, water and water heater off; door locked.
Director trailer: toilet emptied; all windows covered; fridge, heater, water and water heater off; door locked.

Summary of Health and Safety Issues: All nominal.