Operations Report – February 9th

Crew 310 Operations Report 09-02-2025

SOL: 7

Name of person filing report: Helena Arias

Non-nominal systems:

Robotic Observatory

Hab secondary structure

Musk Telescope’s Lock

Notes on non-nominal systems: Maintenance of the observatory planned for June. There are air leaks in the upper deck of the Hab. Some scratches were covered with duct tape and bubble wrap. Other scratches will be covered during this evening using the same method. Opportunity’s tire is already filled with air and under observation. Circuit maintenance has been performed on spacesuit 7 and it’s working as nominal again. The lock of the Musk Telescope was unlocked during the morning but would not unlock again when closing the door at the end of the activity. The Musk Telescope is now closed but with no protection.

ROVERS

Spirit rover used: yes

Hours: 264.6

Beginning charge: 100 %

Ending charge: 57 %

Currently charging: yes

Opportunity rover used: no

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: yes

Curiosity rover used: yes

Hours: 294.5

Beginning charge: 100 %

Ending charge: 54 %

Currently charging: yes

Perseverance rover used: no

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: yes

General notes on rovers: last check made on SOL 6 (8:00 PM).

Summary of Hab operations: Sport, meals, EVA preparation, computer-based research and 3d printing activities have been made as usual.

Water Use (please use both methods to estimate water usage)

Time of measurements (collect data for the same time window): 7:00 pm
1) Per formula (see notes): 19.605 gal.
2) Smart Home Dashboard (see notes): 23.93 gal.

Water (static tank, remaining gallons): 321.275 gal.

Static tank pipe heater (on or off): On

Static tank heater (on or off): On

Toilet tank emptied (no or yes): No

Summary of internet: used from 7:00 am to 8:00 am and from 7:00 pm to 9:00 pm for personal communication and reports.

Summary of suits and radios:

Suits: 1, 3, 5º, 6, 8, 9

Radios: nominal

All radio and spacesuit batteries checked before EVA: Yes. All nominal.

Summary of GreenHab operations: plants were watered twice (morning and evening) and some plants were harvested.

WATER USE: 10 gallons

Heater (On or Off): On

Supplemental light (hours of operation): 2h 50min

Harvest (name, weight in grams):

47 g basil

46 g scalion

34 g argula astro

Summary of Science Dome operations: Marina Martínez and Anna Bach has been working on her experiments.

Dual split: Off

Summary of RAM operations: Monica Roca has been working on the reflector parts.

Summary of any observatory issues:

Robotic observatory: Not working. Maintenance planned for June.

Summary of health and safety issues: none

Questions, concerns and requests to Mission Support: The Musk Observatory lock should be replaced.