Operations Report – January 4th

Crew 238 Operations Report 04-01-2022

SOL:2

Name of person filing report: Simon Werner

Non-nominal systems: 1 CO- Sensor, lower deck, replacement in progress
(Atila), spacesuits, radio, please see details below.

Notes on non-nominal systems: Sensor broken on 2022/01/03, spacesuits/
radio defects detected today at 6.30 pm during post EVA checks, see
below.

ROVERS

Spirit rover used: Yes

Hours: (taken after Return from Marble Ritual): 149.4

Beginning charge: 100%

Ending charge: 100%

Currently charging: yes

Opportunity rover used: yes

Hours: 79.2

Beginning charge: 100%

Ending charge: 100%

Currently charging: yes

Curiosity rover used: yes

Hours: 158.8

Beginning charge: 100%

Ending charge: 100%

Currently charging: yes

Perseverance rover used: no

Hours: unknown

Beginning charge: unknown

Ending charge: unknown

Currently charging: unknown

General notes and comments: Since today we are in SIM. A re-supply
mission from the outpost brought a new toilet. We’ve had an EVA to
Marble Ritual in the morning and afternoon, used Rovers, see EVA
report. Used rovers worked nominal, all plugged in. Rock samples have
been taken close to marble ritual, volvanic material (to be
estimated), Quartz, Flintstone and Achat (German).

Summary of Hab operations:

WATER USE:

Water (static tank): 480

Water (loft tank): 28 gallons, filled to 55 gallons

Water Meter: post pumping 01544074

Static to Loft Pump used – yes

Static tank pipe heater (on or off): installation by Outpost, unknown status

Static tank heater (On or off) unknown

Toilet tank emptied: no

Summary of internet: nominal

Summary of suits and radios: Several spacesuit issues occurred.

Spacesuits next to airlock: Spacesuit nr. 2 is non-functional although
plugged in, will be checked in detail tomorrow. Spacesuit nr. 4 is on
low airflow, plugged in, will be re-checked tomorrow, Spacesuit nr. 5
was on low airflow, plugged to a different power socket, now full air
blow capacity availlable.

Spacesuits in the lower deck: Generation 1 type Spacesuit is on low
air flow, plugged in, re-check tomorrow, System nr. is out of order,
battery voltage reads + 5.1 Volts, fuse is ok (0.1 Ohms). Removed fuse
to check with the following connections: battery ground to multimeter
common, fuse into multimeter voltage (DC) in. Test procedure: switch
on, power supply plugged in. Voltage read was very instable, changing
from 0.0V to 13.75V. Repeatedly checked with 3 different power
supplies, same result. I suspect the power in socket or the switch to
have a half-lose cable connection. Each movement on the power supply
cable led to a different or even no voltage read. Suggested procedure:
move System to the RAM tomorrow, dis-assemble the Switch/plug unit and
check soldered connections/ for broken cables.

Same may be necessary for Spacesuit Nr. 1 and 4. Tomorrow is a day in
HAB, so here is time for this. All other spacesuits are nominal, incl.
those used during EVA.

Radio issues: One Midland-type radio (the yellow ones) does not
re-load, when taken out of the supply, it turns of. Asserted, tagged
as non-functional. Maybe the batteries died, re-supply of rechargeable
batteries, test again? All other radio systems are nominal

Summary of GreenHab operations:

WATER USE: 210 gallons (guess)

Heater: On

Supplemental light: On

Harvest: none

Summary of ScienceDome operations: none

Dual split: status unknown, operated by outpost

Summary of RAM operations: Took screwdriver set back to RAM, checked
Lights and ventilators. All nominal, except fan in the airlock. Makes
some heavy noise/ sounds when turned on –> mechanical contact of fan
blades to frame? Should this be checked in detail?

Ram tools have been used to make a military style/survival kitchen
grater from a can – lid. Noticed the following instrument is not
working: dremel tool, motor can be switched on, but no rotation at the
end of the flexible arm.

Summary of any observatory issues: Still missing the astronomy box,
see Operations report Sol1, Image of Messier galaxy taken by crew
astronomer, details to astronomy operations are to be found in
astronomy report.

Summary of health and safety issues: none, see HSO report

Questions, concerns and requests to Mission Support:

All re-supply delivered, thank you.

Simon

[end]

EVA Report – January 4th

EVA #2

Author: Sionade Robinson

Purpose of EVA: Rehearsal and recognisance of Marble Ritual site and environs..

Start time:14.00

End time: 14.50

Narrative: On recommendation of Mission Support, our three crew
undertook a rehearsal EVA to the destination specified, using suits,
rovers, maps, coordinates and radios. Various rock samples and
landscape features were photographed, small rock samples collected and
identified subsequently at the Hab.

Destination: Marble Ritual

Coordinates (use UTM NAD27 CONUS): 38.41N by 110.79W

Participants: HSO Turner, Engineer Werner, Commander Robinson.

Road(s) and routes per MDRS Map: Cow Dung Road to Pooh’s Corner where
rovers were parked and then party proceeded by foot.

Mode of travel: Opportunity and Spirit Rovers, by foot.

[end]

EVA Report – January 4th

Crew 238 EVA Report 04-01-2022

EVA # 1

Author: Pedro José-Marcellino

Purpose of EVA: Training EVA

Start time: 11:16 AM

End time: 12:26 AM

Narrative: Short training EVA to Marble Ritual, as pre-determined by Mission Support. Based on tasks organized for the day, Team 1 was led by XO Marcellino. The destination appeared to be a short distance away and was found fast. We were told to look for a man-made structure, and thus kept an eye out for a marble structure. But having identified the correct location, we quickly realized there was no such thing. Instead, seeing three sticks with bowls from afar, we discussed the possibility of some sort of ancient Martian ceremony passing glass marbles from a container to the another. Yet, upon closer inspection we realized the bowls were in fact cake pans coloured after the Mars Trilogy books – hinting at a marble cake. Good one, Mission Support.

Destination: Marble Ritual

Coordinates (use UTM NAD27 CONUS): 38.41 N by 110.79 W

Participants: XO Marcellino, GHO Sandor, ART Pokrywka

Road(s) and routes per MDRS Map: MDRS access to Cow Dung Road, headed N-NE toward Pooh’s Corner where we parked. Proceeded on foot 200 m due E.

Mode of travel: Rover Spirit (lead) and Rover Opportunity

[end]

Crew 238 Sol Summary Report 04Jan2022

[Commander Report Sol Summary – January 4th]

Sol:2

Summary Title: The Beginning of Life on Mars

Author’s name: Sionade Robinson

Mission Status: Underway

Sol Activity Summary: Two EVAs to Marble Ritual and the commencement
of crew research projects in

Look Ahead Plan: Day of project work underway in the hab

Anomalies in work: None in work, but significant anomalies experienced
in units of measurement used by an international crew when calculating
dinner ingredients- resolved on this occasion.

Weather: Crisp and clear

Crew Physical Status: Nominal

EVA: Morning and afternoon EVAs to Marble Ritual

Reports to be filed: Sol, Operations, two EVA Reports, and Journalist report.

Support Requested: Coffee Filters requested? We are out!

[end]

Crew Photos – January 4th

Good evening/morning CAMPCOM,

Apologies for the belated submission of our Daily Photos for SOL 1.

We were wrapping up our training, filing reports, and getting through outstanding tasks of our own, due prior to the start of our Sim in a few hours.

Here are our 7 photos from SOL 1, all taken in and around the Hab.

The Photo of the Day is captioned "SOL 1 was a Pre-Sim day at MDRS238".

We’re starting low-key, but since it’s day 1, we thought we’d send you a couple of freebies too — our official crew portraits in both "Explorer Mode" and "Cool Mode."

You may also have noticed our little stowaway, nabbed last night after a dinner-time raid of our staterooms. She was a little scared, but by the AM had grown fond of us (maybe?) and we had grown fond of her. We named her Alice, fed her some oatmeal for the road, then dropped her off beyond the property limits just before sunset. It was kinda cute.

Please let me know if the submission formats are not appropriate, and I’ll be happy to correct.

To be continued at sign-off tomorrow.

Best,

P.J. Marcellino

XO/CJ, MDRS238

Operations Report – January 3rd

Crew 238 Operations Report 03-01-2022

SOL:1

Name of person filing report: Simon Werner

Non-nominal systems: 1 CO- Sensor, lower deck, Atila takes care for
replacing with new one

Notes on non-nominal systems: Sensor went to low battery alarm/ test
mode last night twice. Change of Batteries did not solve the problem.
Measured batteries voltages today with multimeter, all were fully
loaded, so the sensor itself is damaged, See separate mail to mission
control this morning.

ROVERS

Spirit rover used: Yes

Hours: (before EVA) not noted (introduction)

Beginning charge: (Before EVA) 100%

Ending charge: (On return from EVA, before recharging) 98%

Currently charging: yes

Opportunity rover used: yes

Hours: not noted (introduction)

Beginning charge: 100%

Ending charge: 99%

Currently charging: yes

Curiosity rover used: yes

Hours: not noted (introduction)

Beginning charge: 100%

Ending charge: 99%

Currently charging: yes

Perseverance rover used: no

Hours: unknown

Beginning charge: unknown

Ending charge: unknown

Currently charging: unknown

General notes and comments: none

Summary of Hab operations: We’ve had an introduction to the spacesuits
today, the crew members selected their assigned suits and headsets.
New toilet was delivered.

WATER USE:

Water (static tank): 507

Water (loft tank): 37 gallons, filled to 55 gallons

Water Meter: pre pumping 01543756 units, post pumping 01543757

Static to Loft Pump used – yes

Static tank pipe heater (on or off): New heater will be delivered and
installed tomorrow.

Static tank heater (On or off) unknown

Toilet tank emptied: yes

Summary of internet: nominal

Summary of suits and radios: suits assigned to team members, used for
introduction, Spacesuits in spacesuits storage room are nominal,
(number 3 had a red-light power supply, meanwhile turned green), all
plugged in. Spacesuits firstfloor: all nominal

Summary of GreenHab operations:

WATER USE: 240 gallons (guess)

Heater: On

Supplemental light: On

Harvest: none

Summary of ScienceDome operations: none

Dual split: Heat or AC, On or Off: OFF

Summary of RAM operations: Took multimeter and screwdriver set to Hab,
checked batteries and CO-sensor, will be brought back tomorrow.

Summary of any observatory issues: astronomy box is missing, lock of
observatory might be frozen in (Atila and Aga tested), Aga gets in
touch with Peter Detterline

Summary of health and safety issues: none

Questions, concerns and requests to Mission Support:

Please pick up trash. Mr. Clean, toilet paper, kitchen paper towels
and pasta (Spaghetti) is needed. Thank you

Sol Summary – January 3rd

Sol:1

Summary Title: Reaping the Benefits of Productive Anxiety

Author’s name: Sionade Robinson

Mission Status: After two years of anticipation, Crew 238 have been
getting acclimatised to MDRS and has been working hard to complete
training to support our mission.

Sol Activity Summary: Crew 238 completed training with suits, campus
map, Mars Rover care and driving practice, and living in Sim with MDRS
Mission Support.

Look Ahead Plan: Mission Control recommended two rehearsal EVAs
tomorrow to Marble Ritual – we request one at 11am and one at 2pm.

Anomalies in work: None

Weather: Crisp and clear

Crew Physical Status: Nominal

EVA: Practice drives for all crew with Spirit, Opportunity and
Curiosity to Galileo Road.

Reports to be filed: Sol, Operations, HSO and EVA Request (see above)

Support Requested: Support for two practice EVAs.

Sol Summary – December 20th

Crew 236 Sol Summary Report 20-DEC-2021

Sol: 1

Summary Title: Living Martian

Author’s name: Kasey Hilton

Mission Status: Nominal, sim started this morning

Sol Activity Summary: Today was the first day of simulation. After our first Martian breakfast, we headed to the lower deck of the Hab to prepare for the two training EVA to Marble Ritual. While part of the crew was on EVA, ENG had the amazing opportunity to practice emptying the toilet tank! We settled down this evening to discover a little more about each other over dinner (like the fact that everyone else in the crew puts the toilet paper roll facing the wrong way).

Look Ahead Plan: Tomorrow will be spent in the Hab working on research and outreach projects inside. More EVA are planned in the following days.

Anomalies in work: None

Weather: Sunny and clear all day, high in the upper 30s.

Crew Physical Status: Crew Scientist accidentally inhaled a whole Thai pepper during dinner, but besides that everyone is still feeling bright eyed and bushy tailed.

EVA: We had two EVA today to train the crew. Both went to Marble Ritual and the nearby hills. All members of the crew felt confident and comfortable with both EVA attire and protocol after.

Reports to be filed: Operations Report, GreenHab Report, EVA Report, Health and Safety Initial Report, Sol Summary, and Journalist Report (with photos).

Support Requested: None

Copyright © The Mars Society. All rights reserved. | Main Site