Operations Report – April 26th

Crew 280 Operations Report 26-04-2023
SOL: 10
Name of person filing report: Neus Sabaté (Mission Specialist)
Non-nominal systems:
Robotic Observatory
Notes on non-nominal systems: Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation.
ROVERS
Spirit rover used: yes
Hours: 219.8
Beginning charge: 100%
Ending charge: 82%
Currently charging: yes
Opportunity rover used: yes
Hours: 121.9
Beginning charge: –
Ending charge: –
Currently charging: yes
Curiosity rover used: yes
Hours: 232.2
Beginning charge: 100%
Ending charge: 68%
Currently charging: yes
Perseverance rover used: no
Hours: 262.0
Beginning charge: –
Ending charge: –
Currently charging: yes
General notes on rovers: Duck tape on Curiosity’s seat is melting down and sticks to crew’s jumpsuits.
Summary of Hab operations:
WATER USE: 25.5 gal (from 6PM Sol9 to 6PM Sol10)
Water (static tank): 264.5 gal (at 6:00PM)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: yes
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 1,7,8 and 10
Radios: nominal
All radio and spacesuit batteries checked before EVA: Yes. All nominal.
Summary of GreenHab operations:
WATER USE: 14 gallons (+1 gallon for Science Dome)
Heater: Off
Supplemental light: Off
Harvest: 105 gr salad mix sprouts (from crew)
Summary of ScienceDome operations: Laia Ribas, Neus Sabaté and Cesca Cufí have been working on their experiments. Neus Sabaté has used 50 ml of HCl (10%).
Dual split: Heat or AC, Off
Summary of RAM operations: Ariadna Farrés used a work bench to mount a sextant.
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues: none
Questions, concerns and requests to Mission Support:
Questions: none
Requests:
Kitchen: knobs replacement – expected this week

Operations Report – April 25th

Crew 280 Operations Report 25-04-2023
SOL: 9
Name of person filing report: Cesca Cufi Prat (Crew Engineer)
Non-nominal systems:
Robotic Observatory
Notes on non-nominal systems: Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation.
ROVERS
Spirit rover used: yes
Hours: 218.6
Beginning charge: 100%
Ending charge: 67%
Currently charging: no
Opportunity rover used: no
Hours: 121.9
Beginning charge: –
Ending charge: –
Currently charging: yes
Curiosity rover used: no
Hours: 231.0
Beginning charge: –
Ending charge: –
Currently charging: yes
Perseverance rover used: no
Hours: 262.0
Beginning charge: –
Ending charge: –
Currently charging: yes
General notes on rovers: none
Summary of Hab operations:
WATER USE: 30,6 gal (from 6PM Sol4 to 6PM Sol5)
Water (static tank): 290 gal (at 6:00PM)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: no
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 3 and 6.
Radios: nominal
All radio and spacesuit batteries checked before EVA: Yes. All nominal.
Summary of GreenHab operations:
WATER USE: 12 gallons
Heater: Off
Supplemental light: Off
Harvest: 395 g microgreen salad, 99 g of red onions, 40 g chives, 60 g jazz mix, 4 g microgreen, 2 g salvia, 1 g tyme, 1 g albahaca (sweet basil).
Summary of ScienceDome operations: Laia Ribas, Neus Sabaté and Cesca Cufí have been working on their experiments.
Dual split: Heat or AC, Off
Summary of RAM operations: use of solder to repair (for the second time) Laia Ribas’ Martian Bottle.
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues:
Heater: stop due to wind. Restarted as per provided procedure.
Questions, concerns and requests to Mission Support:
Questions: none
Requests:
Kitchen: knobs replacement – expected this week
Retrieval of trash in the rear airlock

Operations Report – April 24th

Crew 280 Operations Report 24-04-2023
SOL:8
Name of person filing report: Neus Sabaté (Mission Specialist)
Non-nominal systems:
Robotic Observatory
Notes on non-nominal systems: Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation.
ROVERS
Spirit rover used: yes
Hours: 217.5
Beginning charge: 100%
Ending charge: 70%
Currently charging: yes
Opportunity rover used: no
Hours: 121.9
Beginning charge: –
Ending charge: –
Currently charging: yes
Curiosity rover used: no
Hours: 231.0
Beginning charge: –
Ending charge: –
Currently charging: yes
Perseverance rover used: yes
Hours: 262.0
Beginning charge: 100%
Ending charge: 65%
Currently charging: yes
General notes on rovers: none
Summary of Hab operations:
WATER USE: 31 gal (from 6PM Sol4 to 6PM Sol5)
Water (static tank): 320 gal (at 6:00PM)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: no
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 2,3,6 and 8.
Radios: nominal
All radio and spacesuit batteries checked before EVA: Yes. All nominal.
Summary of GreenHab operations: a small mouse was found in the trap. It has been removed by Mission Support.
WATER USE: 14 gallons (+1 gallon for Science Dome)
Heater: Off
Supplemental light: Off
Harvest: 8g rocket, 20g of microbeets/beans, 1g lemon balm, 40g yellow tomatoes, 63g red tomatoes and 60g Salad Mix (seeds for the Crew Project from Laia Ribas).
Summary of ScienceDome operations: Laia Ribas, Neus Sabaté and Cesca Cufí have been working on their experiments.
Dual split: Heat or AC, Off
Summary of RAM operations: use of solder to repair Laia Ribas’ Martian Bottle
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues: none
Questions, concerns and requests to Mission Support:
Questions: none
Requests:
Kitchen: knobs replacement – expected next week

Operations Report – April 23rd

Crew 280 Operations Report 23-04-2023
SOL:7
Name of person filing report: Cesca Cufi (Crew Engineer)
Non-nominal systems:
Robotic Observatory
Rover Spirit
Notes on non-nominal systems: Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation.Corroded battery wire in Rover Spirit. Replacement pending (Sergii). Rover can only be used for short distance EVA.

ROVERS
Spirit rover used: no
Hours: 217.0
Beginning charge: –
Ending charge: –
Currently charging: yes
Opportunity rover used: yes
Hours: 121.9
Beginning charge: 100%
Ending charge: 74%
Currently charging: yes
Curiosity rover used: yes
Hours: 231.0
Beginning charge: 100%
Ending charge: 66%
Currently charging: yes
Perseverance rover used: no
Hours: 261.5
Beginning charge: –
Ending charge:-
Currently charging: yes
General notes on rovers: none
Summary of Hab operations:
WATER USE: 15 gal (from 6PM Sol4 to 6PM Sol5)
Water (static tank): 351 gal (at 6:00PM)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: no
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 4, 5, 6 and 7.
Radios: nominal
All radio and spacesuit batteries checked before EVA: Yes. All nominal.
Summary of GreenHab operations: put notes here
WATER USE: 11 gallons
Heater: Off
Supplemental light: Off
Harvest: none
Summary of ScienceDome operations: Laia Ribas, Neus Sabaté and Cesca Cufí have been working on their experiments.
Dual split: Heat or AC, Off
Summary of RAM operations: none
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues: none
Questions, concerns and requests to Mission Support:
Requests: none
Spirit rover: replacement of the corroded wire – expected next week
Kitchen: knobs replacement – expected next week

Operations Report – April 22nd

Crew 280 Operations Report 22-04-2023
SOL:6
Name of person filing report: Neus Sabaté (Mission Specialist)
Non-nominal systems:
Robotic Observatory
Rover Spirit
Notes on non-nominal systems: Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation. Corroded battery wire in Rover Spirit. Replacement expected for next week. Rover can only be used for short distance EVA.
ROVERS
Spirit rover used: no
Hours: 217.0
Beginning charge: –
Ending charge: –
Currently charging: yes
Opportunity rover used: no
Hours: 121.1
Beginning charge: –
Ending charge: –
Currently charging: yes
Curiosity rover used: no
Hours: 230.1
Beginning charge: –
Ending charge: –
Currently charging: yes
Perseverance rover used: no
Hours: 261.5
Beginning charge: –
Ending charge:-
Currently charging: yes
General notes on rovers: last check made on SOL 5 (12:05 PM)
Summary of Hab operations: put notes here
WATER USE: 31 gal (from 6PM Sol4 to 6PM Sol5)
Water (static tank): 366 gal (at 6:00PM)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: yes
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 1, 4 and 7
Radios: nominal
All radio and spacesuit batteries checked before EVA: Yes. All nominal.
Summary of GreenHab operations: put notes here
WATER USE: 14 gallons
Heater: Off
Supplemental light: Off
Harvest: 234 g cucumber, 112 g tomatoes, 4 g chives, 15 g jazz mix, 1 g salvia and 8 g mint
Summary of ScienceDome operations: Laia Ribas, Neus Sabaté and Cesca Cufí have been working on their experiments.
Dual split: Off
Summary of RAM operations: none
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues: Some bridles have been added in the tunnels.
Questions, concerns and requests to Mission Support:
Requests:
Spirit rover: replacement of the corroded wire – expected next week
Kitchen: knobs replacement – expected next week

Supplemental Operations Report 22Apr2023

[title Supplemental Operations Report – April 22th]

Name of person filing report: Sergii Iakymov

Reason for Report: Routine.

Non-Nominal Systems: Robotic observatory.
Action taken for non-nominal systems: New parts for Robotic observatory are received and scheduled to be installed during Crew 261 rotation.

Power system:
Solar: nominalSOC Last 24 hours: Max 100%; Min 61 %; Avg 78.4%.
VDC Last 24 hours: Max 59.12V; Min 46.35; Avg 51.61V.Generator run time: about 12am – 6am. Not used on April 15th.

Propane Reading Station Tank: 77%
Propane Reading Director Tank: 73%
Propane Reading Intern Tank: 71%
Propane Reading Generator Tank: 77%

Water (Static Tank) – 366 gallons
Water in GreenHab – 117 gallons
Water (Outpost tank) – 442 gallons
Water in Science Dome: 0 gallons
Hab Toilet Tank emptied: n/a

Sojourner rover used: Yes, to Zubrin’s Head and back.
Hours: 190.7
Beginning Charge: 100
Ending Charge: 100
Currently Charging: Yes
Notes on Rovers: All are plugged in, charged. All corroded battery wires were received and replaced. Sojourner and Spirit need one additional short battery wire to be replaced. Parts are in transit.
ATV’s Used: (Honda, 350.1, 350.2, 300): None
Reason for use: n/a
Oil Added? No
ATV Fuel Used: 0 Gals
Ethanol Free Gasoline — 0 Gallons
# Hours the ATVs were Used today: 0
Notes on ATV: All parked at the outpost and awaiting to be taken to service.

HabCar used and why, where? Yes. Picked up in Loa after repair, its alternator was replaced. To Hanksville for water runs and supplies pick up.

Crew Car used and why, where? Yes. From Grand Junction by crew. To Hanksville for water runs and supplies.

General notes and comments: Hab Car alternator was replaced.

Dual Split in Science Dome: off due to warmer weather.

Summary of Internet: Nominal

Summary of suits and radios: Nominal

EVA COMMS: Nominal

Campus wide inspection, if action taken, what and why: nothing to report

Summary of General Operations: All nominal.

Summary of Hab operations: Nominal. Hab heater was offline several times this week due to strong north winds. Current work is nominal after restart.

Summary of GreenHab Operations: Nominal.

Summary of SciDome Operations: Nominal.

Summary of any Observatory Issues: New parts for Robotic observatory are received and scheduled to be installed during Crew 261 rotation .

Summary of RAM Operations: Nothing to report

Summary of Outpost Operations:

Shade exterior painting completed. It will require a second coat in a month or so.
Old wood from the clothesline deck is in the process of being burned.
Director’s trailer:
1) Heater went offline after strong winds. The control board displayed a fault code (single red light flashing) – limit switch/airflow problem. Unplugging the control board from power resolved the problem.
2) Porch was leveled.

Summary of Health and Safety Issues: Nominal.

Questions, Concerns, Supplies needed and Requests: Nothing to report

Operations Report – April 21th

Crew 280 Operations Report 21-04-2023

SOL: 5
Name of person filing report: Neus Sabaté (Mission Specialist) and Cesca Cufí (Crew Engineer))
Non-nominal systems:
Robotic observatory.
Rover Spirit.
Notes on non-nominal systems sections:
Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation. Corroded battery wire in Rover Spirit. Replacement pending (Sergii). Rover can only be used for short distance EVA.
Rovers
Spirit rover used: yes
Hours: 217.0
Beginning charge: 100%
Ending charge: 65%
Currently charging: yes
Opportunity rover used: no
Hours: 121.1
Beginning charge: –
Ending charge: –
Currently charging: no
Curiosity rover used: no
Hours: 230.1
Beginning charge: 100%
Ending charge: 65%
Currently charging: yes
Perseverance rover used: yes
Hours: 261.5
Beginning charge: –
Ending charge: –
Currently charging: no
General notes on rovers: none
Summary of Hab operations:
Water use: 22 gal (from 6PM Sol4 to 6PM Sol5)
Water (static tank): 398 gal (at 6:00PM)
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 3, 6, 7 and 8.
Radios: EVA radios work nominally. Channel 1 com with the station was lost after passing by the road passage at Kissing Camel ridge, driving South. The EVA-Station com was maintained thanks to the crew’s own radio equipment (Midland HAM radios).
All radio and spacesuit batteries checked before EVA: ok.
Summary of GreenHab operations:
Water use: 14 gal for watering and 1 gal for experiments in Science Dome
Heater: off
Supplemental light: off
Harvest: 289 g cucumber (1 piece), 36 g micro greens, 163 g tomatoes, 1 g chives, 27g jazz mix, 1g salvia and 1g thyme
Neus Sabaté has taken 200gr of soil from Green Hab wheelbarrow to grow seeds for her Martian Batteries experiment at the Science Dome.
Summary of Science Dome operations:
Laia Ribas (Green Hab Officer): experiment.
Neus Sabaté (Mission Specialist): experiment.
Cesca Cufí (Crew Engineer): experiment
Dual split: off
Summary of RAM operations: CO monitor has been replaced.
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues:
Summary of other system’s issues: non
Questions, concerns and requests to Mission Support:
Questions:
Today’s EVA has taken the team to Robert’s Garden Rock, which is relatively close to the base (approx. 1 mile) and the rover’s batteries discharged to 65%. We have observed that the batteries show a fast discharging rate at the beginning of the EVA and then keep discharging at a lower pace. Considering the Mission Support advice of not letting the rover’s batteries go down below 60% we would like to know if it is possible to plan a longer EVA that allows us to reach longer distances. Advice about this matter will be highly appreciated.
Requests:
Spirit rover: replacement of the corroded wire
Kitchen: knobs replacement
Retrieval of trash in the rear airlock

Operations Report – April 20th

Crew 280 Operations Report 20-04-2023
SOL: 4
Name of person filing report: Cesca Cufí (Crew Engineer) and Neus Sabaté (Mission Specialist)
Non-nominal systems:
Robotic observatory. Rover Spirit.
Notes on non-nominal systems sections:
Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation. Corroded battery wire in Rover Spirit. Replacement pending (Sergii). Rover can only be used for short distance EVA.
Rovers
Spirit rover used: no
Hours: 216.7
Beginning charge: –
Ending charge: –
Currently charging: no
Opportunity rover used: yes
Hours: 121.1
Beginning charge: 100%
Ending charge: 73%
Currently charging: no
Curiosity rover used: no
Hours: 229.8
Beginning charge: –
Ending charge: –
Currently charging: no
Perseverance rover used: yes
Hours: 261.5
Beginning charge: 100%
Ending charge: 56%
Currently charging: no
General notes on rovers:
Perseverance batteries are older and discharge faster. From the station to Cowboy Corner the battery decreased down to 65%.
Summary of Hab operations:
Water use: 23 gal (from 6PM Sol3 to 6PM Sol4). Note: tank refiled yesterday, the current level of water has reached the upper section of the tank, where formula probably gives an overestimation of the water consumption.
Water (static tank): 420 gal (at 6:00PM)
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 3,7,8 and 10.
Radios: EVA radios work nominally. Channel 1 com with the station was lost after passing by Galileo Road, driving North, as expected (from the data provided by Mission support). The EVA-Station com was maintained thanks to the crew’s own radio equipment (Midland HAM radios).
All radio and spacesuit batteries checked before EVA: ok.
Summary of GreenHab operations:
Water use: 12 gal
Heater: off
Supplemental light: off
Harvest: 21 g micro greens, 3 g mint, 116 g red tomatoes, 23 g yellow tomatoes
Summary of Science Dome operations:
Laia Ribas (Green Hab Officer): experiment.
Neus Sabaté (Mission Specialist): experiment.
Dual split: off
Summary of RAM operations: none
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues:
Hab heater: it turned off about 17PM due to the high winds. Same light code as in Sol3. Crew Engineer troubleshoot the issue with the procedure given by Mission Support the previous sol (Sol3).
Hab outer layer: Hab outer layer is a little loose. When the wind is blowing, the panel is knocking the structure, constantly. The integrity of the structure is not concerned. Replacement of hab outer layer scheduled for October.
Questions, concerns and requests to Mission Support:
Spirit rover: replacement of the corroded wire
Kitchen: knobs replacement
Retrieval of trash in the rear airlock

Operations Report – April 19th

Crew 280 Operations Report 19-04-2023

SOL: 3

Name of person filing report: Cesca Cufí (Crew Engineer) and Neus Sabaté (Mission Specialist)

Non-nominal systems:

Robotic observatory. Notes: replacement parts are scheduled to be installed during crew 261 rotation.

Rover Spirit. Notes: corroded battery wire. Replacement pending (Sergii). Rover can only be used for short distance EVA.

Rovers

Spirit rover used: no

Hours: 216.7

Beginning charge: –

Ending charge: –

Currently charging: no

Opportunity rover used: no

Hours: 120.7

Beginning charge: –

Ending charge: –

Currently charging: no

Curiosity rover used: no

Hours: 229.8

Beginning charge: –

Ending charge: –

Currently charging: no

Perseverance rover used: no

Hours: 261.1

Beginning charge: –

Ending charge: –

Currently charging: no

General notes on rovers: none

Summary of Hab operations:

Water use: 20 gal (from 9AM Sol2 to 8AM Sol3)

Water (static tank): 443 gal (at 6:30PM). Water tank refilled this afternoon.

Static tank pipe heater (on or off): off

Static tank heater (On or off): off

Toilet tank emptied: no

Summary of internet: used from 18:00 to 21:00 for personal communication and reports.

Summary of suits and radios:

Suits: not used.

Radios: EVA radios not used.Station radios

All radio and spacesuit batteries checked before EVA: ok.

Summary of GreenHab operations:

Water use: 1,5 gal for experiments in the Science Dome

Heater: off

Supplemental light: off

Harvest: 3g of mint and 263g of tomatoes

Summary of Science Dome operations:

Laia Ribas (Green Hab Officer) continued preparing her experiments.

Neus Sabaté (Mission Specialist) started her experiment.

Dual split: off

Summary of RAM operations:

Cesca Cufí (Crew Engineer) continued her project integration.

Summary of any observatory issues: none

Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.

Summary of health and safety issues: we have replaced batteries of portable gas detectors. The exhausted batteries have been placed in a ziplog bag and left next to the B and NB bins in the lower deck.

Summary of other system’s issues:

Hab heater: it turned off about 2PM. No reason found. Crew Engineer and Commander troubleshoot the issue with the help of mission control. The heater showed the following Light code message: one short blink followed by 3 long blinks. The following actions were executed following mission control orders. The heater was turned off and on again, without results. Then the heater switch on the voltage panel was turned off and on again. The heater LED indicator was then constantly on, meaning that the heater was receiving 24VAC. After a few seconds, the heater turned on.

At 6.45PM the heater turned off again and it was troubleshot the same way.

Some bridles of the corridor tents were missing or broken after overnight winds. We replaced the damage with new bridles.

Questions, concerns and requests to Mission Support:

Spirit rover: replacement of then corroded wire

Kitchen: knobs replacement

Science dome: we have been organizing the science dome in order to fit all the planned experiments of the mission. Yesterday we had to move the microwave from one of the tables in order to have more dedicated space for biology experiments. Today, we allocated it in its original place but we realized that that space was needed to run the genome sequencing experiment. Therefore, we request to Mission Support the permission to store the microwave in a safe place during the mission and put it back to its original location once the experiments are completed. Attached you will find a pdf that explains how the different available locations of the science dome will be used and the suggested temporary location for the microwave.

Operations Report – April 18th

Crew 280 Operations Report 18-04-2023
SOL: 2
Name of person filing report: Neus Sabaté – Mission Specialist (Assisted by Cesca Cufí – Crew Engineering)
Non-nominal systems: robotic observatory
Notes on non-nominal systems: Replacement parts are scheduled to be installed during crew 261 rotation.
Rovers
Spirit rover used: yes
Hours: 216.7
Beginning charge: 100%
Ending charge: 88%
Currently charging: no
Opportunity rover used: no
Hours: 120.7
Beginning charge: –
Ending charge: –
Currently charging: no
Curiosity rover used: yes
Hours: 229.8
Beginning charge: 100%
Ending charge: 92%
Currently charging: no
Perseverance rover used: no
Hours: 261.1
Beginning charge: –
Ending charge: –
Currently charging: no
General notes on rovers: non
Summary of Hab operations:
Water use: can not be estimated because water tank has been partially refilled
Water (static tank): 280 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: yes
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: spacesuits 1,2,5 and 6 have been used during the EVA. All nominal.
Radios: all operative during EVA
All radio and spacesuit batteries checked before EVA: ok.
Radio batteries charged after EVA.
Spacesuit batteries plugged.
Summary of GreenHab operations:
Water use: 14 gallons
Heater: off
Supplemental light: off
Harvest: 191 gr of cucumber
Radios were found discharged: the jack plug of charger was half disconnected so the radios were not properly charged. This has already been solved.
Summary of Science Dome operations:
Laia Ribas (Green Hab Officer) prepared the setups for her experiments.
Neus Sabaté (Mission Specialist) brought rock samples from EVA and prepared the setup for further analysis of electroactive iron contents.
Dual split: off
Summary of RAM operations:
Cesca Cufí (Crew Engineer) used the RAM to start mounting her experiment setup (homemade biological safety cabinet).
Summary of any observatory issues: none
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues:
Gas stove knobs dammaged: the gas stove knobs are damaged and they don’t fit properly the valves axis, resulting in a serious hazard. Because of this reason, there was a gas leak during cooking lunch, while during the EVA. The two cooks detect immediately the leak but could not stop it immediately as the knob was not working and the other knobs neither. The leakage was stopped several minutes after by the crew engineer (cooking at this time) that turned off the knob axis using a pliers that she had in the Hab, while one crew member went to the RAM to pick a gas sensor to monitor the concentration of gas. After the EVA, to ensure the safety, the Crew Engineer explained the issue to all crew members. The HSO has recommended limiting the use of the stove to the single burner that has an actual functional knob while we find a way to repair the rest. A gas detector has been placed in the kitchen to measure the gas concentration in case we need to use several burners, to ensure all burners are off when finishing cooking. All crew members are aware and know the procedure to follow.
Questions, concerns and requests to Mission Support:
The gas detector that has been used to detect the gas leak from the kitchen stove has a very low battery level. Also the second one we found in RAM. We have looked for replacement but could not find AAA batteries in the RAM.
In case Mission Control refuses the crew repairing/substituting the knobs, we require spare parts to replace all of them (x4). We can provide the knob measures and pictures.