Operations Report – February 06th

Crew 221 Operations Report 06Feb2022

SOL: 4

Name of person filing report: Luis D. Monge

Non-nominal systems:

Notes on non-nominal systems:

Generator: on (at 8pm)

Hours run: 13:00

From what time last night: 7:00pm

To what time this morning: 8:00am

List any additional daytime hours when the generator was run : 0

Solar— SOC % (Before generator is run at night) 76%

Diesel Reading – 98%

Station Propane Reading – 61%

Ethanol Free Gasoline – gallons

Water (loft tank): 35 gallons

Water Meter: 148 units

Water (static tank) – 355 gals

Static to Loft Pump used – yes

Water in GreenHab – 243 gals

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging: yes

Spirit rover used: yes

Hours: (before EVA) : 129

Beginning charge: (Before EVA) 100%

Ending charge: (On return from EVA, before recharging) 35%

Currently charging: yes

Opportunity rover used: no

Hours: n/a

Beginning charge: n/a

Ending charge: n/a

Currently charging: yes

Curiosity rover used: yes

Hours: 135

Beginning charge: 100%

Ending charge: 25%

Currently charging: yes

Notes on rovers:

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) not used

Reason for use: not used

Oil Added? not used

ATV Fuel Used: Gals not used

# Hours the ATVs were Used today: not used

Notes on ATVs:

HabCar used and why, where? not used

CrewCar used and why, where? not used

General notes and comments: not used

Summary of internet: operational

Summary of suits and radios: not used

Summary of Hab operations: nominal.

Summary of GreenHab operations: black corn experiment started, 4 trays were filled 3 with mars soil and one with regular soil for control, beans were plantes and watered with 2L. operational, watering of the plants carried out as per procedure

Summary of ScienceDome operations: 2 incubators runing, microbiology experiments going on and cultures are bieng grown in agar plates.

Summary of RAM operations: robot assembly is ongoing adn expected to continue.

Summary of any observatory issues: nominal

Summary of health and safety issues: no issues

Questions, concerns and requests to Mission Support:

Operations Report – February 5th

Crew 221 Operations Report 05Feb2022

SOL: 3

Name of person filing report: Luis D. Monge

Non-nominal systems: Generator

Notes on non-nominal systems: on-going issue

Generator: on (at 7pm)

Hours run: 11:00

From what time last night: 9:00pm

To what time this morning: 8:00am

List any additional daytime hours when the generator was run : 0

Solar— SOC % (Before generator is run at night) 80%

Diesel Reading – 100%

Station Propane Reading – 61%

Ethanol Free Gasoline – gallons

Water (loft tank): 38 gallons

Water Meter: 148 units

Water (static tank) – 390 gals

Static to Loft Pump used – yes

Water in GreenHab – 252.7 gals

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Bayo rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging: yes

Spirit rover used: yes

Hours: (before EVA) : 129

Beginning charge: (Before EVA) 100%

Ending charge: (On return from EVA, before recharging) 35%

Currently charging: yes

Opportunity rover used: no

Hours: n/a

Beginning charge: n/a

Ending charge: n/a

Currently charging: yes

Curiosity rover used: yes

Hours: 135

Beginning charge: 100%

Ending charge: 25%

Currently charging: yes

Notes on rovers: Opportunity still out of commission, brakes need fixing before being delivered to the Hab

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) not used

Reason for use: not used

Oil Added? not used

ATV Fuel Used: Gals not used

# Hours the ATVs were Used today: not used

Notes on ATVs:

HabCar used and why, where? not used

CrewCar used and why, where? not used

General notes and comments: not used

Summary of internet: Notification received on Router replacement, rescheduled to be performed tomorrow as per instructions.

Summary of suits and radios: Fan on suit 7 stoped working during EVA, it restarted after reset. It will be checked for losing conections before being used again.

Summary of Hab operations: full deep cleanig of the upper level of the hab carried out yesterday evening after a mouse was spoted next the couch.

Summary of GreenHab operations: operational, watering of the plants carried out as per procedure

Summary of ScienceDome operations: 2 incubators runing

Summary of RAM operations: not used

Summary of any observatory issues: dome was not properly closed after night observations, it was detected early in the morning reported and fixed.

Summary of health and safety issues: no issues

Questions, concerns and requests to Mission Support: a new mouse trap was requested and it was delivered early in the morning.

Operations Report – February 4th

Crew 221 Operations Report 04-02-2022

SOL: 2

Name of person filing report: Luis D. Monge

Non-nominal systems: MDRS Generator is non-operational and still on inspection

Loft water tank connection presents a minor leak

Notes on non-nominal systems: Since Jan 21st, we have a 15 kW rental generator connected to our power system, meanwhile, we are working to troubleshoot the MDRS generator.

A male to male connection was bought in order to replace it in the line, but the leak it’s not in the connection, it’s in the pipe itself.

Generator: off as we are still waiting for it to reach 80%SOC to be turned on

Hours run: 12:00

From what time last night: 8:00pm

To what time this morning: 8:00am

List any additional daytime hours when the generator was run : 0

Solar— SOC % (Before generator is run at night) 89%

Diesel Reading – 22%

Station Propane Reading – 65%

Ethanol Free Gasoline – gallons

Water (loft tank): 32 gallons

Water Meter: 148 units

Water (static tank) – 420 gals

Static to Loft Pump used – yes

Water in GreenHab – 267.4 gals

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging: yes

Spirit rover used: no

Hours: (before EVA) : 128.7

Beginning charge: (Before EVA)

Ending charge: (On return from EVA, before recharging)

Currently charging: yes

Opportunity rover used: no

Hours: n/a

Beginning charge: n/a

Ending charge: n/a

Currently charging: yes

Curiosity rover used: no

Hours: 134,8

Beginning charge:

Ending charge:

Currently charging: yes

Notes on rovers:

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) not used

Reason for use: not used

Oil Added? not used

ATV Fuel Used: Gals not used

# Hours the ATVs were Used today: not used

Notes on ATVs:

HabCar used and why, where? not used

CrewCar used and why, where? not used

General notes and comments: not used

Summary of internet: Notification received on Router replacement, and it will be performed tomorrow as per instructions.

Summary of suits and radios: Radios were used during the EVAs and batteries are malfunctioning and need to be replaced.

Summary of Hab operations: during the afternoon due to high winds and low temperatures the hab temperature dropped from 22C to 18C, the wall heater in the lower deck was turned on and the temperature is back to normal, reading is 20.6C in the thermometer in the wall.

Summary of GreenHab operations: operational, watering of the plants carried out as per procedure

Summary of ScienceDome operations: 2 incubators running

Summary of RAM operations: not used

Summary of any observatory issues: no issues

Summary of health and safety issues: no issues

Questions, concerns and requests to Mission Support: a measuring cylinder and two mason jars will be needed for the science experiments, permission to use them is requested.

Operations Report – February 3rd

Crew 221 Operations Report 03-02-2022

SOL: 1

Name of person filing report: Luis D. Monge

Non-nominal systems: MDRS Generator is non-operational and still on inspection

Loft water tank connection presents a minor leak

Notes on non-nominal systems: Since Jan 21st, we have a 15 kW rental generator connected to our power system, meanwhile, we are working to troubleshoot the MDRS generator.

A male to male connection was bought in order to replace it in the line, but the leak it’s not in the connection, it’s in the pipe itself.

Generator: off

Hours run: 11:30

From what time last night: 20:30

To what time this morning: 8:00

List any additional daytime hours when the generator was run : 0

Solar— SOC % (Before generator is run at night) 85%

Diesel Reading – 23%

Station Propane Reading – 70%

Ethanol Free Gasoline – gallons

Water (loft tank): 30 gallons

Water Meter: units

Water (static tank) – 450 gals

Static to Loft Pump used – no

Water in GreenHab – 130 gals

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging: yes

Spirit rover used: no

Hours: (before EVA) : 128.7

Beginning charge: (Before EVA)

Ending charge: (On return from EVA, before recharging)

Currently charging: yes

Opportunity rover used: no

Hours: n/a

Beginning charge: n/a

Ending charge: n/a

Currently charging: yes

Curiosity rover used: no

Hours: 134,8

Beginning charge:

Ending charge:

Currently charging: yes

Notes on rovers:

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) not used

Reason for use: not used

Oil Added? not used

ATV Fuel Used: Gals not used

# Hours the ATVs were Used today: not used

Notes on ATVs:

HabCar used and why, where? not used

CrewCar used and why, where? not used

General notes and comments: not used

Summary of internet: Notification received on Router replacement, and it will be performed tomorrow as per instructions.

Summary of suits and radios: Radios were used during the EVAs and batteries are malfunctioning and need to be replaced.

Summary of Hab operations: during the afternoon due to high winds and low temperatures the hab temperature dropped from 22C to 18C, the wall heater in the lower deck was turned on and the temperature is back to normal, reading is 20.6C in the termometer in the wall.

Summary of GreenHab operations: Nominal

Summary of ScienceDome operations: Nominal

Summary of RAM operations: Nominal

Summary of any observatory issues: Nominal

Summary of health and safety issues: No issues

Questions, concerns and requests to Mission Support: none

Operations Report – February 2nd

Crew 221 Operations Report 2-2-2022 UPDATE 3

SOL: 0

Name of person filing report: Luis D. Monge

Non-nominal systems: Primary Generator, Hab lower deck 1 fluorescent light ballast (MDRS team in process of upgrade).

Notes on non-nominal systems:

Generator:

From what time last night: 21:00

To what time this morning: 07:00

List any additional daytime hours when the generator was run : 0

Solar— SOC % (Before generator is run at night) 79%

Diesel Reading – 25%

Station Propane Reading – 70%

Ethanol Free Gasoline – gallons

Water (loft tank): 50 gallons

Water Meter: units-

Water (static tank) – (MDRS team full refilling in progress)

Static to Loft Pump used – yes

Water in GreenHab –88.44 (MDRS team full refilling in progress)

Water in ScienceDome: 0 gallons

Toilet tank emptied: yes

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging: yes

Spirit rover used: yes

Hours: (before EVA) 128.7

Beginning charge: (Before EVA) 100%

Ending charge: (On return from EVA, before recharging) 85%

Currently charging: yes

Opportunity rover used: no

Hours: n/a

Beginning charge: n/a

Ending charge: n/a

Currently charging: yes

Curiosity rover used: Yes

Hours: 134,8

Beginning charge: 100%

Ending charge: 80%

Currently charging: yes

Notes on rovers:

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3)

Reason for use:

Oil Added?

ATV Fuel Used: Gals

# Hours the ATVs were Used today:

Notes on ATVs:

HabCar used and why, where?

CrewCar used and why, where?

General Notes and Comments: full Cleaning and maintenance performed

Summary of the internet: Nominal.

Summary of Suit and Radios: Suits Nominal

Summary of Hab: Main fluorescent lights in Hab lower deck are being upgraded by MDRS team. New cameras installed and connected to existing station TV.

Summary of Science Dome operations: Nominal.

Summary of Ram operations: Nominal.

Summary of any observatory issues: Nominal

Summary of Health and Safety issues: MDRS crew all healthy

This is the first ops report for Crew 221. Looking forward to a great time here!

General Notes and Comments: Cleaning and maintenance performed

Summary of the internet: Nominal.

Summary of Suit and Radios: 5 radios malfunctioning

Suits Nominal

Summary of Hab: (UPDATE) Main fluorescent lights in Hab lower deck are being upgraded by MDRS team. New stove installed. New cameras installed and connected to existing station TV. Water heater repaired and functioning.

Summary of Science Dome operations: Nominal.

Summary of Ram operations: Nominal. MDRS team began work to upgrade exterior outlets

Summary of any observatory issues: Nominal

Summary of Health and Safety issues: MDRS crew all healthy

This is the last ops report for Crew 220. Thanks for everything!

Supplemental Operations Report – February 3rd

MDRS Supplemental Operations Report 03-Feb-2020

Name of person filing report: Atila Meszaros

Reason for Report: MDRS Hab systems update

Non-nominal systems:
MDRS Generator is non-operational and still on inspection
Loft water tank connection presents a minor leak

Action taken for non-nominal systems:
Since Jan 21st, we have a 15 kW rental generator connected to our power system, meanwhile, we are working to troubleshoot the MDRS generator.
A male to male connection was bought in order to replace it in the line, but the leak it’s not in the connection, it’s in the pipe itself.

Solar— running nominally, solar throughout the day and generator
backup usually on 12 hours a night.

Diesel Reading – 25%, have refill ordered for the end of the week

Propane Reading – 70%

Ethanol Free Gasoline – 2 gallons.

Water (Outpost tank) – 250 gallons

Water (static tank) – 450 gallons

Water (GreenHab) – 130 gallons

Water (loft) – 50 gallons.

Static to Loft Pump used – yes

Water Meter: n/a

Toilet tank emptied: No

Deimos rover used: Off-campus, but on its way back to MDRS this week.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: Nominal

Hours:

Beginning charge:

Ending charge:

Currently charging: Yes

Spirit rover used: Nominal

Hours:

Beginning charge:

Ending charge:

Currently charging: Yes

Opportunity rover used: Off-campus, but on its way back to MDRS this week.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: Nominal.

Hours:

Beginning charge:

Ending charge:

Currently charging: Yes

Notes and action taken on rovers: Nothing to report.

ATV’s used: (Honda, 300, 350.1, 350.2, 350.3):
Honda:
Oil: OK
Battery: non-operational. Management Team tried to jump it, but the ATV won’t keep running.

300:
Currently in town and non-operational.
350-1:
Oil: OK
Fully operational during maintenance running.

350-2:
Oil: OK
Battery: non-operational
Additional safety issue with the damaged handlebars

350-3:
Oil: OK
Fully operational during maintenance running.

Reason for use: Started and checked for operations

Oil Added? No, all OK.

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used: 1

Notes and action taken on ATVs: Nothing more to report

HabCar running? If used, why, where? Started and checked for operations
All systems checked and major inner cleaning by MDRS Management Team.
Transmission fluid: OK
Coolant: 2/3 – OK
Breaker fluid: Full – OK
Oil: Minimum
Power steering fluid: Full – OK
Washer fluid: replacement part to order.

CrewCar running, If used why, where? Started and checked for operations.
All systems checked and major inner cleaning by MDRS Management Team.
Transmission fluid: OK
Coolant: 3/4 – OK
Breaker fluid: Full – OK
Oil: OK
Power steering fluid: Full – OK
Washer fluid: Full – OK (Refilled)

Summary of the internet: Hab and Astronomy accounts nominal. Outpost account nominal, but low in data.

Summary of suits and radios: 5 radios malfunctioning, the main issue seems to be a battery dysfunction, however, new batteries were added and replaced 6 weeks ago for most of the radios. The problem is still on inspection.

Summary of Hab operations:

Camera’s system
All 4 cameras have been installed in the hab:
Inner cameras:
Science Dome
Green Hab
Outside cameras:
From outside the RAM observing the main porch and the station
From outside the Science Dome observing the observatory
All cameras are working perfectly, and the website is still in process. More news about this soon.

Water heater
Up and running. The propane line was secured and the system is already fully operational.

NEW Kitchen Oven
After a long long time, it has arrived. It was picked up yesterday at Salt Lake City and it was finally installed today.

RAM
The breakers and outside plugs have been finally installed, just in time for the soon arrival of the two Rovers.

Lower deck lights
In media res. The full installation will be finished by tomorrow. If the lighting is adequate and enough, the upper deck lights might be changed with this new model too.

Lower deck wall heater
Moved to the right location, connected and fully operational. A replacement propane hose was bought for the water heater system, but it wasn’t finally needed, and it was necessary for the lower deck wall heater, due to the long distance from the propane line in the new correct location

Upper deck loft water tank connection
A male-male connection for the loft tank was bought to be added to the loop, but the leak was caused by the degraded pipe. The leak’s not critical, but a new pipe will be required in the near future.

Supplies added:
2 packs of mop heads
A handle (and a spare) that was missing from a drawer from the IKEA new furniture.

Summary of Outpost operations: Intern Trailer pipelines fully installed and operational.

Summary of GreenHab operations: Crew 220 did a great job on the
GreenHab. Two small disposals containers (organic and non-organic) have been added. Most of the crops look healthy, there has been a good rate of crew’s harvest and it looks like it has been a great season for the Green Hab.

Summary of ScienceDome operations:
Additional wooden pieces for the "island" in the Science Dome have been picked up.

Summary of RAM operations:
Breaker system upgraded and outer plugs for the rovers are fully operational.
The pressurized air pump has a complete hose system already installed and working.
The oil pump has a new hose

Summary of any observatory issues: Nothing to report

Summary of health and safety issues: First Aid Kit for the EVA room seems to be missing.

Questions, concerns, supplies needed and requests: None

Operations Report – February 2nd

Crew 221 Operations Report 2-2-2020

SOL: 0

Name of person filing report: Luis D. Monge

Non-nominal systems: Primary Generator, Hab lower deck 1 fluorescent light ballast (MDRS team in process of upgrade).

Notes on non-nominal systems:

Generator:

From what time last night: 21:00To what time this morning: 07:00
List any additional daytime hours when the generator was run: 0

Solar— SOC % (Before generator is run at night) 79%

Diesel Reading – 25%

Station Propane Reading – 70%

Ethanol Free Gasoline – gallons

Water (loft tank): 50 gallons
Water Meter: units-
Water (static tank) – (MDRS team full refilling in progress)

Static to Loft Pump used – yes 70 gal

Water in GreenHab –88.44 (MDRS team full refilling in progress)

Water in ScienceDome: 0 gallons

Toilet tank emptied: yes

Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours:
Beginning charge:
Ending charge:
Currently charging: yes

Spirit rover used: yes
Hours: (before EVA) 128.7
Beginning charge: (Before EVA) 100%
Ending charge: (On return from EVA, before recharging) 85%
Currently charging: yes

Opportunity rover used: no
Hours: n/a
Beginning charge: n/a
Ending charge: n/a
Currently charging: yes

Curiosity rover used:
Hours: 134,8
Beginning charge: 100%
Ending charge: 80%
Currently charging: yes

Notes on rovers:

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3)

Reason for use:

Oil Added?

ATV Fuel Used: Gals

# Hours the ATVs were Used today:

Notes on ATVs:

HabCar used and why, where?

CrewCar used and why, where?

General Notes and Comments: full Cleaning and maintenance performed

Summary of the internet: Nominal.

Summary of Suit and Radios: Suits Nominal

Summary of Hab: Main fluorescent lights in Hab lower deck are being upgraded by the MDRS team. New cameras installed and connected to existing station TV.

Summary of Science Dome operations: Nominal.

Summary of Ram operations: Nominal.

Summary of any observatory issues: Nominal

Summary of Health and Safety issues: MDRS crew all healthy

This is the first ops report for Crew 221. Looking forward to a great time here!

Operations Report – February 1st

Hab Car
All systems checked and major inner cleaning by MDRS Management Team.
Transmission fluid: OK
Coolant: 2/3 – OK
Breaker fluid: Full – OK
Oil: Minimum
Power steering fluid: Full – OK
Washer fluid: replacement part to order.

CrewCar:
All systems checked and major inner cleaning by MDRS Management Team.
Transmission fluid: OK
Coolant: 3/4 – OK
Breaker fluid: Full – OK
Oil: OK
Power steering fluid: Full – OK
Washer fluid: Full – OK (Refilled)

ATVs:

Honda:
Oil: OK
Battery: non-operational. Management Team tried to jump it, but the ATV won’t keep running.

350-1:
Oil: OK
Fully operational during maintenance running.

350-2:
Oil: OK
Battery: non-operational.

350-3:
Oil: OK
Fully operational during maintenance running.

Camera’s system
All 4 cameras have been installed in the hab:
Inner cameras:

  • Science Dome
  • Green Hab

Outside cameras:

  • From outside the RAM observing the main porch and the station
  • From outside the Science Dome observing the observatory

All cameras are working perfectly, except the one from outside the RAM, the problem seems to be the ethernet cable. We have a spare cable and tomorrow we will finish the full system.

Tomorrow the website will be configured, and pictures will be upload to it, so anyone can go and see them. Tomorrow we’ll have more news about this.

Water heater
Up and running. The propane line was secured and the system is already fully operational.

NEW Kitchen Oven
After a long long time, it has arrived. It was picked up yesterday at Salt Lake City and it was finally installed today.

RAM
The breakers and outside plugs have been finally installed, just in time for the soon arrival of the two Rovers.

Lower deck lights
In media res. The full installation will be finished by tomorrow. If the lighting is adequate and enough, the upper deck lights might be changed with this new model too.

Lower deck wall heater
Moved to the right location, connected and fully operational. A replacement propane hose was bought for the water heater system, but it wasn’t finally needed, and it was necessary for the lower deck wall heater, due to the long distance from the propane line in the new correct location

Upper deck loft water tank connection
A male-male connection for the loft tank was bought to be added to the loop, but the leak was caused by the degraded pipe. The leak’s not critical, but a new pipe will be required in the near future.

Supplies added to the Hab:

  • 2 packs of mop heads
  • An M-M metal for loft tank connection
  • The pressurized air pump has a complete hose system already installed and working.
  • The oil pump has a new hose.
  • A handle (and a spare) that was missing from a drawer from the IKEA new furniture.
  • Additional wooden pieces for the “island” in the Science Dome.

Operations Report – February 1st

Crew 220 Operations Report 01FEB2020

Sol: 13

Name of person filing report: Matt Wise

Non-nominal systems: Primary Generator, Hab lower deck 1 fluorescent light ballast (MDRS team in process of upgrade). Hot water heater has been repaired

Generator: Primary is inoperable. Rental was run-the following information is for the rental. MDRS team worked on primary generator yesterday making several startup attempts

Hours run: 12.5
From what time last night: 19:00

To what time this morning: 0730 (still off, SOC 91%, nice sunny day)

List of any additional daytime hours when the generator was run: N/A

Solar- SOC% (Before the generator is run at night): 80%

Diesel Reading – 1/4

Station Propane Reading- 72%

Ethanol Free Gasoline- N/A

Water (loft tank) (gal) – 50

Water Meter (units)- 0148719,2

Water (static tank) (gal) – 6 (MDRS team refilling in progress)

Static to loft Pump used – Yes 75 gal

Water in GreenHab (gal): 92.14

Water in Science Dome (gal): 0

Toilet Tank Emptied – No

Deimos rover used: Still in the workshop

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Sojourner rover used: No

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Spirit Rover used – No

Starting Hours: 128.7

Beginning Charge: 100%

Ending Hours: 128.7

Ending Charge: 100%

Opportunity Rover used: Still in workshop

Hours:

Beginning Charge:

Ending Charge:

Currently Charging:

Curiosity Rover used: No

Starting Hours: 134.7

Beginning Charge: 100%

Ending Hours: 134.7

Ending Charge: 100%

Notes on rovers: Opportunity and Deimos off-site for maintenance. Should be operational within a few sols

ATVs Used: (Honda, 300, 350.1, 350.2, 350.3): No

Reason for use:

Oil Added? Checked and added as necessary

# hours the ATV’s were used today: 0

Notes on ATVs: Maintenance performed on all. Honda Non-operational, 350-1 operational, 350-2 Non-operational, 350-3 Fully operational

Habcar used and why, where? yes; water. Major cleaning/maintenance by MDRS team
Trans fluid: ok
Coolant: 2/3 OK
Break Fluid: Full OK
Oil: OK
Power Steering Fluid: Full OK
Washer Fluid: Replacement part to be ordered

CrewCar used and why, where? Yes. Supplies brought to MDRS station. Incoming crew transported to station
Trans Fluid: OK
Coolant: 3/4 OK
Break Fluid: Full OK
Oil: OK
Power Steering Fluid: Full OK
Washer Fluid: Min. OK

General Notes and Comments: Cleaning and maintenance performed

Summary of the internet: Nominal. New TP Link wifi router donated and configured by Crew 220 Engineer. Username and password are both ‘admin’ for config interface. Original Netgear router is inside the tv cabinet in the grey carton.

Summary of Suit and Radios: 5 radios malfunctioning
Suits Nominal

Summary of Hab: Main fluorescent lights in Hab lower deck are being upgraded by MDRS team. New stove installed. New cameras installed and connected to existing station TV. Water heater repaired and functioning.
New Vizio 52″ flat panel TV donated to MDRS by crew 220 Engineer (wall mount included if you need it).

Summary of Science Dome operations: Nominal.

Summary of Ram operations: Nominal. MDRS team began work to upgrade exterior outlets

Summary of any observatory issues: Nominal

Summary of Health and Safety issues: MDRS crew all healthy

This is the last ops report for Crew 220. Thanks for everything!

Operations Report – February 1st

Crew 220 (MAU) Operations Report 1Feb2020

SOL 13

Name of person filing report: Shawna Pandya, Commander

Non-nominal systems: N/A

Generator: Operating nominally.

Hours run: Not run overnight

From what time last night: N/A

To what time this morning: N/A

List of any additional daytime hours when the generator was run: 0 hours

Solar- SOC% (Before the generator is run at night): N/A

Diesel Reading – N/A

Station Propane Reading- 100% + Backup (1.6 cylinders)

Ethanol Free Gasoline- N/A

Water (loft tank) (gal) – N/A

Water Meter (units)- N/A

Water (static tank) (gal) – N/A

Static to loft Pump used – N/A

Water in GreenHab (gal): N/A

Water in Science Dome (gal): N/A

Toilet Tank Emptied – no

Deimos rover used: N/A

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Sojourner rover used: Assigned to Director

Hours:

Beginning Charge:

End Charge:

Currently Charging:

Spirit Rover used – No

Starting Hours: 128.7

Beginning Charge: 100%

Ending Hours: 128.7

Ending Charge: 100%

Opportunity Rover used: Still in workshop

Hours:

Beginning Charge:

Ending Charge:

Currently Charging: Yes

Curiosity Rover used: No

Starting Hours:134.7

Beginning Charge: 100%

Ending Hours: 134.7

Ending Charge: 100%

Notes on Rovers: Opportunity and Deimos off-site for maintenance, to be returned soon.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): No

Reason for use:

Oil Added? No

# hours the ATV’s were used today:

Notes on ATVs:

Habcar used and why, where? Used to go to town for water.

CrewCar used and why, where? Used for Crew 221 transport and support.

General Notes and Comments: None.

Summary of the internet: N/A

Summary of Suit and Radios: Nominal

Summary of Hab: MAU Station breakdown, storage and clean-up complete.

Summary of Science Dome operations: Temperatures are hovering around 6°C during the day.

Summary of RAM operations: Nominal

Summary of any observatory issues: Nominal

Summary of health and safety issues: Nominal

Questions, concerns, and requests to Mission Support: None

Copyright © The Mars Society. All rights reserved. | Main Site