Operations Report – February 17th

SOL: 7

Name of person filing report: Verónica Triviño

Non-nominal systems: Generator

Notes on non-nominal systems: Radiator hoses and alternator need replacement on generator. A contractor has been arranged to make these repairs within a few days.

Generator (hours run): Turned on at 1600 (17th Feb), turned off at 0830 (17th Feb)

Solar— SOC % – Turned off Gen (17th Feb) 82%, Turned on Gen (17th Feb) 100%

Diesel Reading – 90%

Propane Reading – ~ 40%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 62%, ~ 343 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 216.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01413047 units

Toilet tank emptied: Yes

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Used

Hours: 51.0 hours

Beginning charge: 100%

Ending charge: 28%

Currently charging: Yes

Curiosity rover used: Used

Hours: 75.0 hours

Beginning charge: 100%

Ending charge: 44%

Currently charging: Yes

Spirit rover used: Not Used

Hours: 75.7

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Notes on rovers: N/A

ATV’s Used: N/A

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? N/A

Crew Car used and why, where? N/A

General notes and comments: Nothing to report

Summary of internet: Nothing to report

Summary of suits and radios: Some suits are being repaired in the evening. The parts of the ones repaired yesterday evening worked well on this morning’s EVA.

Summary of Hab operations: Screws tightened in the back airlock door. White tunnel covers were re-secured with new zip ties, as well as tightening loose zipties and clipping the ends of the zip ties.

Summary of Green Hab operations: GreenHab door screws tightened.

Summary of Science Dome operations: Nothing to report

Summary of RAM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report

Questions, concerns and requests to Mission Support: Nothing to report.

Operations Report – February 16th

Crew 205 Operations Report 16 – FEB – 2019

SOL: 6

Name of person filing report: Dave Masaitis

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): Turned off at 0800 hrs (16th Feb),Turned on at 1530 hrs (16th Feb),

Solar— SOC % – Turned off Gen (16th Feb) 74%, Turned on Gen (16th Feb) 91%

Diesel Reading – 85%

Propane Reading – ~ 44%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use

Water (Static tank) – around 60%, ~ 330 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 228.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01412700 units

Toilet tank emptied: No

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Yes

Hours: 50.4 hours

Beginning charge: 100%

Ending charge: 86%

Currently charging: Yes

Curiosity rover used: Not Used

Hours: 74.3 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Spirit rover used: Yes

Hours: 75.7

Beginning charge: 100%

Ending charge: 73%

Currently charging: Yes

Notes on rovers: N/A

ATV’s Used: N/A

Reason for use: N/A

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: 0

Notes on ATVs: None

HabCar used and why, where? N/A

Crew Car used and why, where? Not used

General notes and comments: No general notes.

Summary of internet: Nothing to report

Summary of suits and radios: Suits 1 and 6 had right-hand air tubes disconnect at the backpack during EVA. The helmet accompanying Suit 6 also had a broken zip-tie on the back panel of the helmet. Suits 3 and 4 are having intermittent fan problems despite having correct battery voltage. These will be checked and repaired this evening and tomorrow by D. Masaitis and V. Trivino.

One radio lost charge early on EVA, despite appearing to be at full charge prior to EVA. It was marked upon return, and will be thoroughly tested before being cleared for EVA use again.

Summary of Hab operations: The lightbulb in the rear (tunnel-side) airlock is out. Crew requires a replacement light bulb in order to repair. The handle hardware of the front airlock interior door was loose. Crew Engineer tightened 7/8 screws, but the top-left screw of the top attachment point would not thread at all. Replacement benchstock required to make a successful repair.

Summary of Green Hab operations: Nothing to report.

Summary of Science Dome operations: Hardware on the drawer set between the microscope table and laminar flow hood was excessively loose to where the drawer set was beinning to collapse. Repaired by tightening all of the hardware.

Summary of RAM operations: Nothing to report.

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report.

Questions, concerns and requests to Mission Support: Replacement lightbulb for rear airlock, replacement benchstock for front airlock door handle

Operations Report – February 15th

Crew 205 Operations Report 15 – FEB – 2019

SOL: 5

Name of person filing report: Natalia Larrea

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): Turned off at 0830 (15th Feb),Turned on at 1730 (15th Feb),

Solar— SOC % – Turned off Gen (15th Feb) 69%, Turned on Gen (15th Feb) 74%

Diesel Reading – 97%

Propane Reading – ~ 45%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use

Water (Static tank) – around 64.5%, ~ 355 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 240.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01412441 units

Toilet tank emptied: Yes

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable566

Currently charging: Not Applicable

Opportunity rover used: Not Used

Hours: 50.1 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: Not Used

Hours: 74.3 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Spirit rover used: Not Used

Hours: 73.7

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Notes on rovers: N/A

ATV’s Used: Yes, number 2

Reason for use: exploration

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: 40 min

Notes on ATVs: None

HabCar used and why, where? Not used

Crew Car used and why, where? Not used

General notes and comments: Downstairs furnace was turned off due to higher ambient temperatures.

Summary of internet: Nothing to report

Summary of suits and radios: Two radios have been stuck in privacy and NOAA weather radio mode, respectively since we arrived. Following the radio’s manual did not fix them. Notes describing the issues have been clipped to the radios to assist future troubleshooting and identify them as not working. We still have plenty of radios working so it is not urgent.

Summary of Hab operations: Replaced the air filter in the heater in the lower-deck. Heater upstairs is nominal and currently used.

Summary of Green Hab operations: GreenHab smoke detector was beeping (it seems it was low in battery). Replacing its AA batteries fixed the problem.

Summary of Science Dome operations: Nothing to report

Summary of RAM operations: We observed a water leak above the workbench (we found a water puddle this morning)

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report

Questions, concerns and requests to Mission Support: Due to strong winds a white canvas flew towards the tunnels. We believe it belongs to Director’s compound.

Operations Report – February 14th

SOL: 4

Name of person filing report: Verónica Triviño

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): Turned on at 1730 (14th Feb), turned off at 1500 (14th Feb)

Solar— SOC % – Turned off Gen (14th Feb) 83%, Turned on Gen (14th Feb) 67%

Diesel Reading – 97%

Propane Reading – ~ 50%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use

Water (Static tank) – around 68%, ~ 372 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 252.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01412244 units

Toilet tank emptied: No

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Not Used

Hours: 50.1 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: Not Used

Hours: 74.3 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Spirit rover used: Not Used

Hours: 73.7

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Notes on rovers: N/A

ATV’s Used: N/A

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? Yes, going to town

Crew Car used and why, where? Not used

General notes and comments: Nothing to report

Summary of internet: Around noon, D. Masaitis (CO) checked the internet data status and saw a remaining data allocation of 392 MB. 20 minutes later, the data allocation dropped to 0 MB. Upon inspection of the crew’s devices, no offending device was found. A survey of the devices connected to the internet revealed only the router and D. Masaitis’ laptop, which was being used to correspond with Mission Control. The cause of the anomaly is still unknown and we will continue to monitor the Hab network.

Summary of suits and radios: Nothing to report.

Summary of Hab operations: Nothing to report

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: Nothing to report

Summary of RAM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report

Questions, concerns and requests to Mission Support: Temperature in the upper deck of the Hab rose during the morning, at some points getting close to reaching 27 deg C, even though the heater in the lower deck was set by the engineer to slightly below the "ideal" middle setting of "3" (which usually gives the Hab a temperature of 21 – 23 deg C). The assistant director recommended turning the heater off and on again. After turning the heater off, the engineer and commander struggled to turn it back on again. As of writing this report, it is currently still off, however the temperature in the upper deck is a comfortable 23.8 deg C.

Operations Report – February 12th

Crew 205 Operations Report 12 – FEB – 2019

SOL: 2

Name of person filing report: Veronica Trivino

Non-nominal systems: Generator

Notes on non-nominal systems: Radiator hoses and alternator need replacement on generator. A contractor has been arranged to make these repairs within a few days.

Generator (hours run): Turned on this evening by 1708 (12thFeb), Stopped by this morning 0730 (12thFeb)

Solar— SOC % – Turned off Gen (12th Feb) 33%, Turned on Gen (12th Feb) 69%

Diesel Reading – 100%

Propane Reading – ~ 50%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 77%, ~ 422 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 276.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01411709 units

Toilet tank emptied: Yes

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Used

Hours: 49.6 hours

Beginning charge: 100%

Ending charge: 61%

Currently charging: Yes

Curiosity rover used: Not Used

Hours: 73.6 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Spirit rover used: Used

Hours: 73.7

Beginning charge: 100%

Ending charge: 40%

Currently charging: Yes

Notes on rovers: Spirit was accidentally left on after returned from EVA no.1. Engineer when checking readings in the evening turned it off. It was charged to 100% when checked by engineer.

ATV’s Used: N/A

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? N/A

Crew Car used and why, where? Not used

General notes and comments: None

Summary of internet: Nothing to report

Summary of suits and radios: Several suits with fan broken. Other suits had not finished charging by the time the second EVA preparation had begun, even though they were set to charge as soon as the crew from the first EVA came back. One of the suit chargers is not functional. More information was sent to Atila/Mission support in an email.

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: Nothing to report

Summary of RAM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report

Questions, concerns and requests to Mission Support: None

Operations Report – February 11th

rew 205 Operations Report 11 – FEB – 2019

SOL: 1

Name of person filing report: Veronica Trivino

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): Turned on this evening by 1730 (11th Feb), Stopped by this morning 0730 (11th Feb)

Solar— SOC % – Turned off Gen (11th Feb) 21%, Turned on Gen (11th Feb) 70%

Diesel Reading – 25%

Propane Reading – ~ 50%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 88%, ~ 485 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 288.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01411118 units

Toilet tank emptied: No

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Used

Hours: 49.2 hours

Beginning charge: 100%

Ending charge: 86%

Currently charging: Yes

Curiosity rover used: Not Used

Hours: 73.6 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Spirit rover used: Used

Hours: 73.2

Beginning charge: 100%

Ending charge: 85%

Currently charging: Yes

Notes on rovers: None

ATV’s Used: None

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? Yes, Off campus

Crew Car used and why, where? Not used

General notes and comments: None

Summary of internet: Nothing to report

Summary of suits and radios: Suit 10 – Fan broken. Email sent to to Scott for repair aid.

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: We were operating the autoclave by the handbook that was provided and as the pressure began to rise to the optimal pressure, it began to drop suddenly. We found that there was a leak out of the threads of the pressure valve that attaches the whole valve assembly to the lid, probably because it was not tightened properly. In order to remedy that, the XO got an adjustable wrench and made a tightening quarter turn on the valve, which caused the leak to stop and pressure, began to rise again. However, a minute later, the upper pressure release segment popped off. Upon inspection, we found that the valve sheared where pressure normally releases. It appears that the valve was already weakened as it sheared cleanly. No threads were damaged, so if a replacement valve assembly can be obtained, the issue should be repairable. The minimum sterilization pressure (17 psi) was obtained only momentarily and no higher pressures were experienced.

Summary of RAM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: EVA 2 encountered 2 cases of overheating crew, one light, one more significant. All treated and crew were healthy again within 25 mins. See more in HSO report.

Questions, concerns and requests to Mission Support: None

Operations Report – February 10th

Crew 205 Operations Report 10 – FEB – 2019

SOL: 0

Name of person filing report: Veronica Trivino

Non-nominal systems: Generator

Notes on non-nominal systems: Radiator hoses and alternator need replacement on generator. A contractor has been arranged to make these repairs within a few days.

Generator (hours run): Turned on this evening by 1800 (10thFeb), Stopped by this morning 0800 (10thFeb)

Solar— SOC % – Turned off Gen (10th Feb) 70%, Turned on Gen (10th Feb) 20%

Diesel Reading – 25%

Propane Reading – ~ 50%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 90%, ~ 495 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 148 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01410586 units

Toilet tank emptied: yes

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Used

Hours: 49 hours

Beginning charge: 100%

Ending charge: 88%

Currently charging: Yes

Curiosity rover used: Used

Hours: 73.6 hours

Beginning charge: 100%

Ending charge: 63%

Currently charging: Yes

Spirit rover used: Used

Hours: 73

Beginning charge: 100%

Ending charge: 85%

Currently charging: Yes

Notes on rovers: None

ATV’s Used: None

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: N/A

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? Driven to Hanksville 4 times to get water

Crew Car used and why, where? Not used

General notes and comments: Hab Car is operational and back from workshop

Summary of internet: Nothing to report

Summary of suits and radios: Nothing to report

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: Nothing to report

Summary of RAMM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report.

Questions, concerns and requests to Mission Support: None

Operations Report – February 9th

Crew 204 Operations Report 09 – FEB – 2019

SOL: 12

Name of person filing report: Kunal Naik (Space_bot)

Non-nominal systems: Generator

Notes on non-nominal systems: Generator: Non- nominal. The alternator needs to be replaced and the coolant system flushed and hoses replaced. All parts already arrived.

Generator (hours run): Turned on this evening by 1700 (9th Feb), Stopped by this morning 0830 (9th Feb)

Solar— SOC % – Turned off Gen (9th Feb) 72%, Turned on Gen (9th Feb) 55%

Diesel Reading – 28%

Propane Reading – ~ 50%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 50%, ~ 250 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 159 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01409959 units

Toilet tank emptied: yes

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: Not Used

Hours: 48.5 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: Not Used

Hours: 73.6 hours

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Spirit rover used: Not used

Hours: 72.8

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Notes on rovers: Curiosity returned yesterday with a very low charge, compared with Oppy. For long distance EVA., it’s recommended to use Oppy.

ATV’s Used: None

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: Nope

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? To town for Dinner

Crew Car used and why, where? To town for Dinner

General notes and comments: HabCar: back on campus. The car was taken to the workshop in order to fix the transmission issue. It was successfully repaired and ready to work. Currently, it doesn’t have a spare tire. The tire is on its way. One of the rear tires had a nail on it, it’s already patched.

Summary of internet: Nothing to report

Summary of suits and radios: Nothing to report

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: Nothing to report

Summary of RAMM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report.

Questions, concerns and requests to Mission Support: None

Operations Report – February 8th

Crew 204 Operations Report 08- FEB – 2019

SOL: 11

Name of person filing report: Kunal Naik (Space_bot)

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): Turned on this evening by 1830 (8th Feb), Stopped by this morning 0900 (8th Feb)

Solar— SOC % – Turned off Gen (8th Feb) 77%, Turned on Gen (8th Feb) 72%

Diesel Reading – 30%

Propane Reading – ~ 55%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 58%, ~ 290 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 168 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01409242 units

Toilet tank emptied: No

Deimos rover used: No, still not functional

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable

Beginning charge: Not Applicable

Ending charge: Not Applicable

Currently charging: Not Applicable

Opportunity rover used: 1st EVA

Hours: 48.5 hours

Beginning charge: 100%

Ending charge: 42%

Currently charging: Yes

Curiosity rover used: 1st EVA

Hours: 73.6 hours

Beginning charge: 100%

Ending charge: 12%

Currently charging: Yes

Spirit rover used: 2nd EVA

Hours: 72.8

Beginning charge: 100%

Ending charge: 25%

Currently charging: Yes

Notes on rovers: None

ATV’s Used: None

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: Nope

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? The car is in Workshop, not at the campus

Crew Car used and why, where? Off Campus

General notes and comments: None

Summary of internet: Nothing to report

Summary of suits and radios: Nothing to report

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: Nothing to report

Summary of RAMM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report.

Questions, concerns and requests to Mission Support: None

Operations Report- February 7th

Crew 204 Operations Report 07- FEB – 2019

SOL: 10

Name of person filing report: Kunal Naik (Space_bot)

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): Turned on this evening by 1922 (7th Feb),
Stopped by this morning 0630 (7th Feb)

Solar— SOC % – Turned off Gen (7th Feb) Not checked, Turned on Gen
(7th Feb) 77%

Diesel Reading – 32%

Propane Reading – ~ 58%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – around 60%, ~ 300 gallons

Auxillary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – ~ 183 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01408827 units

Toilet tank emptied: No

Deimos rover used: No, still not functional
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: Not Applicable
Beginning charge: Not Applicable
Ending charge: Not Applicable
Currently charging: Not Applicable

Spirit rover used: Not Used
Hours: 72.1
Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes

Opportunity rover used: Not Used
Hours: 47.6 hours
Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes

Curiosity rover used: Not Used
Hours: 72.7 hours

Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes

Notes on rovers: None

ATV’s Used: None

Reason for use: Not used

Oil Added? N/A

ATV Fuel Used: Nope

# Hours the ATVs were Used today: None

Notes on ATVs: None

HabCar used and why, where? The car is in Workshop

Crew Car used and why, where? Off Campus

General notes and comments: None

Summary of internet: Nothing to report

Summary of suits and radios: Nothing to report

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report

Summary of Science Dome operations: Nothing to report

Summary of RAMM operations: Nothing to report

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report.

Questions, concerns and requests to Mission Support: None

Copyright © The Mars Society. All rights reserved. | Main Site