Engineering Report – Friday 3 Nov. 2017
Refit Crew: Dr.Shannon Rupert, Kay Radzik Warren, Kevin Seidler, John
Lillquist, and John Stone
******************************
STATUS OF HAB:
Water: Full tank, 500 gallons
Water on trailer: Both tanks empty
Diesel for generator: 75%
Solar Power: 100% SOC
Generator: on from 4 pm. Last person up tonight will shut it off.
Propane: big tank = 58%, small tank = 40%
Fuel for ATV’s (Jerry Cans): All gas unusable. DO NOT USE FUEL WITH
ETHANOL IN IT
Fuel for Hab Car: Full tank, new battery
******************************
Tasks done today:
1) GreenHab: grow lights installed; shade cloth installed on south
wall; +/- 2 dozen pots planted and watered.
2) Toilet tank flushed out.
3) Tunnel between GreenHab and intersection to Science Lab removed and replaced.
4) Generator jump started, oil was topped off, and it is in working condition.
5) Electrical receptacles checked, and we found that the receptacles
in the toilet, shower room, and alcove in front are not working. Lack
of GFCI outlets in wet areas noted.
6) Replacement lid for vent/skylight fabricated.
7) Porthole in south airlock exterior door had fallen out due to
extreme wind conditions (and the fact that it was just sitting in the
opening and not fastened mechanically, just siliconed), but was
undamaged. So it was put back in with carabiners slotted through holes
on each side so that it won’t fall out again.
******************************
Tasks that need to be done:
A. Water heater is still not working. Per Curtis, it needs to be fully
replaced. Installation expected soon.
B. Need more water in spare tanks.