Crew 221 Operations Report 04-02-2022
SOL: 2
Name of person filing report: Luis D. Monge
Non-nominal systems: MDRS Generator is non-operational and still on inspection
Loft water tank connection presents a minor leak
Notes on non-nominal systems: Since Jan 21st, we have a 15 kW rental generator connected to our power system, meanwhile, we are working to troubleshoot the MDRS generator.
A male to male connection was bought in order to replace it in the line, but the leak it’s not in the connection, it’s in the pipe itself.
Generator: off as we are still waiting for it to reach 80%SOC to be turned on
Hours run: 12:00
From what time last night: 8:00pm
To what time this morning: 8:00am
List any additional daytime hours when the generator was run : 0
Solar— SOC % (Before generator is run at night) 89%
Diesel Reading – 22%
Station Propane Reading – 65%
Ethanol Free Gasoline – gallons
Water (loft tank): 32 gallons
Water Meter: 148 units
Water (static tank) – 420 gals
Static to Loft Pump used – yes
Water in GreenHab – 267.4 gals
Water in ScienceDome: 0 gallons
Toilet tank emptied: no
Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours:
Beginning charge:
Ending charge:
Currently charging: yes
Spirit rover used: no
Hours: (before EVA) : 128.7
Beginning charge: (Before EVA)
Ending charge: (On return from EVA, before recharging)
Currently charging: yes
Opportunity rover used: no
Hours: n/a
Beginning charge: n/a
Ending charge: n/a
Currently charging: yes
Curiosity rover used: no
Hours: 134,8
Beginning charge:
Ending charge:
Currently charging: yes
Notes on rovers:
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) not used
Reason for use: not used
Oil Added? not used
ATV Fuel Used: Gals not used
# Hours the ATVs were Used today: not used
Notes on ATVs:
HabCar used and why, where? not used
CrewCar used and why, where? not used
General notes and comments: not used
Summary of internet: Notification received on Router replacement, and it will be performed tomorrow as per instructions.
Summary of suits and radios: Radios were used during the EVAs and batteries are malfunctioning and need to be replaced.
Summary of Hab operations: during the afternoon due to high winds and low temperatures the hab temperature dropped from 22C to 18C, the wall heater in the lower deck was turned on and the temperature is back to normal, reading is 20.6C in the thermometer in the wall.
Summary of GreenHab operations: operational, watering of the plants carried out as per procedure
Summary of ScienceDome operations: 2 incubators running
Summary of RAM operations: not used
Summary of any observatory issues: no issues
Summary of health and safety issues: no issues
Questions, concerns and requests to Mission Support: a measuring cylinder and two mason jars will be needed for the science experiments, permission to use them is requested.