Crew 222 EVA Report 17-02-2020
EVA # 1
Author: Benjamin Auzou
Purpose of EVA: Install weather station and aerosol counter, then find a place the installation of an other experiment, The electric field measure. Start time: 9:37am
End time: 11:33am
Narrative:
First of all this EVA was followed by a journalist, who filmed the activities on the field.
After the first steps on Mars for three of us, we checked all rovers status and the static tank level. Then we moved to the place we needed to set the experiment, which needs to be a plane area.
The installation was successful for both parts of the experiment. At 11:10am, the installation was finished and then we had some minutes to study the area to find a location for MegaAres, the experiment that we will deploy tomorrow.
Destination: plane area approximately 500m away from the Hab, along Cow Dung Road
Coordinates (use UTM NAD27 CONUS): 12S 0518483 4250677
Participants: Benjamin Auzou (CO), Bleuenn Roiron (GHO), Valentin Prudhomme (ENG), Nina Sedbon (SC)
Road(s) and routes per MDRS Map: Cow Dung Road
Mode of travel: Driving (needed for material transport)