Operations Report – March 26th

Operations Report 26-MAR-2020

SOL: n/a

Name of person filing report: Shannon Rupert

Non-nominal systems: None

Notes on non-nominal systems: Nothing to report

Power system: SOLAR ONLY. Nominal.

Diesel Reading – 60%

Station Propane Reading – 65 %

Ethanol Free Gasoline – 5.5 gallons

Water (loft tank): half full gallons

Water Meter: n/a units

Water (static tank) – 300 gallons

Static to Loft Pump used – no

Water in GreenHab – 0 gallons

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Notes on rovers: All rovers are in town to be stored until May.

Notes on ATVs: ATVs are stored in a line outside the Hab until May.

HabCar used and why, where? Not used

CrewCar used and why, where? In Hanksville

General notes and comments: Nothing to report

Summary of internet: Nominal.

Summary of suits and radios: Nothing to report.

Summary of Hab operations: Hab is ready for shutdown except that I
have to play musical chairs with things that I found that belong in
other buildings. I was really disappointed in how dirty the Hab was
after just a half a year of operations. The kitchen was a real mess.
I did not clean it completely as it needs a deep cleaning (dishes
included) before operations start up again.

Summary of GreenHab operations: Shutdown complete until Fall 2020. I
went to out the wheelbarrow in the GreenHab this morning and the door
handle will not open. If I can’t get it to open, I will just leave it
as is until May.

Summary of ScienceDome operations: Shutdown complete until May

Summary of RAM operations: Shutdown complete until May

Summary of any observatory issues: The seal on the inner half-shell of
the dome was off in the middle again but I managed to get it all back
on this time. Will check tomorrow to see if it held.

Summary of health and safety issues: Nothing to report

Questions, concerns and requests to Mission Support: Nothing at this time

Copyright © The Mars Society. All rights reserved. | Main Site