Operations Report – April 22nd

Crew 280 Operations Report 22-04-2023
SOL:6
Name of person filing report: Neus Sabaté (Mission Specialist)
Non-nominal systems:
Robotic Observatory
Rover Spirit
Notes on non-nominal systems: Replacement parts of Robotic observatory are scheduled to be installed during crew 261 rotation. Corroded battery wire in Rover Spirit. Replacement expected for next week. Rover can only be used for short distance EVA.
ROVERS
Spirit rover used: no
Hours: 217.0
Beginning charge: –
Ending charge: –
Currently charging: yes
Opportunity rover used: no
Hours: 121.1
Beginning charge: –
Ending charge: –
Currently charging: yes
Curiosity rover used: no
Hours: 230.1
Beginning charge: –
Ending charge: –
Currently charging: yes
Perseverance rover used: no
Hours: 261.5
Beginning charge: –
Ending charge:-
Currently charging: yes
General notes on rovers: last check made on SOL 5 (12:05 PM)
Summary of Hab operations: put notes here
WATER USE: 31 gal (from 6PM Sol4 to 6PM Sol5)
Water (static tank): 366 gal (at 6:00PM)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: yes
Summary of internet: used from 18:00 to 21:00 for personal communication and reports.
Summary of suits and radios:
Suits: 1, 4 and 7
Radios: nominal
All radio and spacesuit batteries checked before EVA: Yes. All nominal.
Summary of GreenHab operations: put notes here
WATER USE: 14 gallons
Heater: Off
Supplemental light: Off
Harvest: 234 g cucumber, 112 g tomatoes, 4 g chives, 15 g jazz mix, 1 g salvia and 8 g mint
Summary of ScienceDome operations: Laia Ribas, Neus Sabaté and Cesca Cufí have been working on their experiments.
Dual split: Off
Summary of RAM operations: none
Summary of any observatory issues:
Robotic observatory: Not working. Replacement parts are scheduled to be installed during crew 261 rotation.
Summary of health and safety issues: none
Summary of other system’s issues: Some bridles have been added in the tunnels.
Questions, concerns and requests to Mission Support:
Requests:
Spirit rover: replacement of the corroded wire – expected next week
Kitchen: knobs replacement – expected next week

Copyright © The Mars Society. All rights reserved. | Main Site