Name of person filing report: Sergii Iakymov
Reason for Report: Routine
Non-Nominal Systems: Rovers: Perseverance, Curiosity, Spirit, Sojourner. A tunnel stick on the right from the rear airlock. GreenHab moisture meter. See below for details.
Power system:
Solar: Nominal.
SOC Last 24 hours: Max 100%; Min 76 %; Avg 89.9%.
VDC Last 24 hours: Max 58.69V; Min 46.15V; Avg 50.52V.
Generator run time: 3876.5 hours.
Propane Readings:
Station Tank: 71%
Director Tank: 46%
Intern Tank: 65%
Generator Tank: 66%
Water:
Hab Static Tank – 530 gallons
GreenHab – 200 gallons
Outpost tank – 450 gallons
Science Dome – 0 gallons
Hab Toilet Tank emptied: Yes
Rovers:
Sojourner rover used: No.
Hours: 195.4
Beginning Charge: 100 %
Ending Charge: 100 %
Currently Charging: Yes
Notes on Rovers: Perseverance – passenger and driver side battery sensor cable corroded out and fuse holder is burned from outside; battery clamps of sensor cable replaced, fuse and inside the fuse holder cleaned and checked, fuse holder wrapped in electrical tape; fuse holder requires replacement; long battery cable will require replacement in near future due to corrosion. Curiosity – passenger side battery sensor cable corroded out and fuse holder is burned from outside; battery clamps of sensor cable replaced, fuse and inside the fuse holder cleaned and checked, fuse holder wrapped in electrical tape; fuse holder requires replacement. Spirit – passenger side battery sensor cable corroded out and fuse holder is burned with the fuse from outside; battery clamps of sensor cable replaced; fuse holder with the fuse require replacement. Opportunity – passenger side battery sensor cable corroded out; battery clamps of sensor cable replaced; key switch is loosed and requires a washer. Sojourner – passenger and driver side battery sensor cable corroded out and fuse holder is burned from outside; battery clamps of sensor cable replaced, fuse and inside the fuse holder cleaned and checked, fuse holder wrapped in electrical tape; fuse holder requires replacement. All fuse holders are zip tight to the rover frame to prevent any contacts with the battery terminals. New parts are in order.
ATV: ATV’s Used: None. Nothing to report.
Cars:
Hab Car used and why, where: To Hanksville for supplies. Need to be serviced.
Crew Car used and why, where: To Hanksville for supplies.
General notes and comments: All cars awaiting renewed insurance ID.
Summary of Internet: All nominal.
EVA suits and radios:
Suits: All nominal
Comms: Headset #3 replaced due to absence on the ear cushion. All kits are labeled with new labels
Campus wide inspection, if action taken, what and why: One tunnel stick on the right from the rear airlock is corroded out at the ground level and needs to be replaced.
Summary of Hab Operations: New digital thermometer installed on the upper deck.
Summary of GreenHab Operations: Planted by crew 284. Moisture meter is broken and replacement is in order. New garden stakes received.
Summary of SciDome Operations: All nominal
Summary of Observatories Operations: All nominal.
Summary of RAM Operations: All toolkits are labeled with new labels.
Summary of Outpost Operations: All nominal.
Summary of Health and Safety Issues: All nominal.