Crew 297 Operations Report 17-04-2024
SOL: 3
Name of person filing report: Matt Lynch (Engineer)
Non-nominal systems: Suit 2 (stuck valve), Suit 9 (broken visor), Suit 4 (missing metal tie on rear of helmet collar)
Notes on non-nominal systems: The issues with Suit 2 and 9 were already noted before our mission. The issue with Suit 4 was found today, spare parts are being looked for and if they are not found a zip tie can be used as a temporary fix.
ROVERS
Spirit rover used:
Hours: 251.1
Beginning charge: 100%
Ending charge: 38%
Currently charging: No
Curiosity rover used:
Hours: 180
Beginning charge: 100%
Ending charge: 56%
Currently charging: No
General notes on rovers: NA
Summary of Hab operations:
WATER USE: 20.4 gallons
Water (static tank): 380 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet: Looking up recipes, downloading entertainment, downloading navigation applications, report formatting methods, catching up on Earthly news
Summary of suits and radios:
Radios 1,2,5, and 6 were used.
EVA Suits 4,7, and 11 were used.
Summary of GreenHab operations:
WATER USE: 5.25 gallons
Heater: Yes
Supplemental light: N/A
Harvest: 288 g of suspected squash and 2 g cherry tomato
Summary of ScienceDome operations: NA
Summary of RAM operations: (Tools used, work done): NA
Summary of any observatory issues: NA