Crew 216 Operations Report 02-Dec-19
SOL: 8
Name of person filing report: Mike Lawson

Non-nominal systems: NA
Generator: run
Hours run: 12.25
From what time last night: 1845
To what time this morning: 0700
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night: 52 %

Diesel Reading – 36
Station Propane Reading – 54
Ethanol Free Gasoline: N/A

Water (loft tank) (gal): 47
Water Meter (units): 1464017
Water (static tank) (gal): 269
Static to Loft Pump used – yes
Water in Green Hab (gal): 255
Water in Science Dome (gal): 0

Toilet tank emptied: no

Deimos rover used: Off Campus for repairs
Hours:
Beginning charge:
Ending charge:
Currently charging:

Sojourner rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging:

Spirit rover used: yes
Hours: 115.7
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 38%
Currently charging: yes

Opportunity rover used: Off Campus for repairs
Hours: 68.7
Beginning charge: 100
Ending charge: 100
Currently charging:

Curiosity rover used: yes
Hours: 120.7
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 35.%
Currently charging: yes

Notes on rovers: Opportunity to be moved off-site for maintenance.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:

HabCar used and why, where?
CrewCar used and why, where?

General notes and comments: EVA North Ridge, radio relay site surveyed. EVA to vicinity quarry.

Summary of internet: No serious issues.

Summary of suits and radios: No issues.

Summary of Hab operations: Routine maintenance and housekeeping tasks. Replacement of hot water tank installed, running in 120 VAC mode only. Needs an additional switch to run on propane. Will not be an issue when the station is on the generator. Generator frequency is slightly off, electric clocks run fast by 10-15 minutes/day. Not an issue when on the battery bank.

Summary of GreenHab operations: routine watering.

Summary of Science Dome operations: NA

Summary of RAM operations: RAM Rover power charging stations inoperable, electrical issues remain unresolved. Director is aware of issue.

Summary of any observatory issues: NA

Summary of health and safety issues: NA

Questions, concerns and requests to Mission Support: 2 bag NB, 1 bag B trash in the rear airlock.

Operations Report – December 1st

Crew 216 Operations Report 01-DEC-19
SOL: 7
Name of person filing report: Mike Lawson

Non-nominal systems: NA

Generator: run
Hours run: 11.75
From what time last night: 1917
To what time this morning: 0656
List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before generator is run at night: 61 %

Diesel Reading – 37
Station Propane Reading – 55
Ethanol Free Gasoline: N/A

Water (loft tank) (gal): 47
Water Meter (units): 1463701
Water (static tank) (gal): 292
Static to Loft Pump used – yes
Water in Green Hab (gal): 259
Water in Science Dome (gal): 0

Toilet tank emptied: no

Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:

Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:

Spirit rover used: yes
Hours: 114.9
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 57.4%
Currently charging:

Opportunity rover used: no
Hours: 68.7
Beginning charge: 100
Ending charge: 100
Currently charging: yes

Curiosity rover used: yes
Hours: 119.9
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 56.0%
Currently charging: yes

Notes on rovers: Opportunity to be moved off-site for maintenance.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:

HabCar used and why, where?
CrewCar used and why, where?

General notes and comments: EVA to Kissing Camel Ridge. TV crew filmed.

Summary of internet: No serious issues.
Summary of suits and radios: No issues.
Summary of Hab operations: Propane restored to HAB kitchen. Water system pressure pump serviced.
Summary of GreenHab operations: routine watering.
Summary of Science Dome operations: TV crew filmed.
Summary of RAM operations: RAM Rover power charging stations inop, electrical issues remain unresolved.
Summary of any observatory issues: Sun observations performed. TV crew filmed.
Summary of health and safety issues: NA

Questions, concerns and requests to Mission Support: 2 bag NB trash, 1 bag expended dry cell batteries for recycling in the rear airlock. Expended 1 can of helmet screen cleaner, request refill.

Operations Report – November 30th

Crew 216 Operations Report 30-Nov-19
SOL: 6
Name of person filing report: Mike Lawson

Non-nominal systems: RAM rover power charging stations inoperable, electrical issue, ongoing.
Notes on non-nominal systems:

Generator: run
Hours run: 11.5
From what time last night: 1902
To what time this morning: 0630
List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before the generator is run at night: 71%

Diesel Reading – 38
Station Propane Reading – 56
Ethanol Free Gasoline: N/A

Water (loft tank) (gal): 47
Water Meter (units): 1463316
Water (static tank) (gal): 315
Static to Loft Pump used – yes
Water in Green Hab (gal): 263
Water in Science Dome (gal): 0

Toilet tank emptied: yes

Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:

Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:

Spirit rover used: no
Hours: 114.5
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 100
Currently charging:

Opportunity rover used: no
Hours: 68.7
Beginning charge: 100
Ending charge: 100
Currently charging: yes

Curiosity rover used: no
Hours: 119.6
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 100
Currently charging: yes

Notes on rovers: will have to juggle the charging sequence.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:

HabCar used and why, where?
CrewCar used and why, where?

General notes and comments: EVA to North Ridge, circumnavigated hill mass. No obvious routes for the summit in sim. No recon of potential radio repeater site.

Summary of internet: No serious issues.
Summary of suits and radios: No issues.
Summary of Hab operations: Routine maintenance and housekeeping.
Summary of GreenHab operations: routine watering.
Summary of Science Dome operations: Gypsum processing continued.
Summary of RAM operations: RAM Rover power charging stations inoperable, electrical issues remain unresolved.
Summary of any observatory issues: Sun observations performed.

Operations Report – November 29th

rew 216 Operations Report 29-Nov-19
SOL: 5
Name of person filing report: Mike Lawson
Non-nominal systems: RAM rover power charging stations inoperable, electrical issue, ongoing.
Notes on non-nominal systems:
Generator: run
Hours run: 12.5
From what time last night: 1758
To what time this morning: 0630
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night: 71 %
Diesel Reading – 39
Station Propane Reading – 57
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1462858
Water (static tank) (gal): 343
Static to Loft Pump used – yes
Water in Green Hab (gal): 267
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: no
Hours: 114.5
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 100
Currently charging:
Opportunity rover used: no
Hours: 68.7
Beginning charge: 100
Ending charge: 100
Currently charging: yes
Curiosity rover used: no
Hours: 119.6
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 100
Currently charging: yes
Notes on rovers: will have to juggle charging sequence.
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:
HabCar used and why, where?
CrewCar used and why, where?
General notes and comments: Weather day, no EVA ativity. HAB maintenance, mission planning for future EVAs and personal project/report time.
Summary of internet: No serious issues.
Summary of suits and radios: No issues.
Summary of Hab operations: Routine maintenance and housekeeping.
Summary of GreenHab operations: Routine watering.
Summary of Science Dome operations: Gypsum processing continued.
Summary of RAM operations: RAM Rover power charging stations inop, electrical issues remain unresolved.
Summary of any observatory issues: None, weathered out.
Summary of health and safety issues: HSO broke sim to address medical issue at Base Sopport.
Questions, concerns and requests to Mission Support: Need to replace 1 bottle of cough suppresent/expectorant consumed.

Operations Report – November 27th

Crew 216 Operations Report 27-Nov-19
SOL: 3
Name of person filing report: Mike Lawson
Non-nominal systems: RAM rover power charging stations inoperable, electrical issue.
Notes on non-nominal systems: Outpost directed Opportunity to be charged at Spirit’s
traditional port.
Generator: run
Hours run: 12.1
From what time last night: 1850
To what time this morning: 0658
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night: 55%
Diesel Reading – 41
Station Propane Reading – 59
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1461926
Water (static tank) (gal): 401
Static to Loft Pump used – yes
Water in Green Hab (gal): 272
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: yes
Hours: 114.5
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 81
Currently charging: no (see notes non-nominal systems).
Opportunity rover used: no
Hours: 68.7
Beginning charge: 46
Ending charge: 46
Currently charging: yes (in Spirit port)
Curiosity rover used: yes
Hours: 119.6
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 81
Currently charging: yes
Notes on rovers: will have to juggle charging sequence.
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:
HabCar used and why, where?
CrewCar used and why, where?
General notes and comments:
Summary of internet: No serious issues.
Summary of suits and radios: Midland GXT serial # A1707006944, erratic power setting fluctuations,
possibly intermittent battery connectivity while on afternoon EVA.
Summary of Hab operations: Routine maintenance and housekeeping.
Summary of GreenHab operations: routine watering.
Summary of Science Dome operations: UV scan of gypsum samples performed. In addition to gypsum, samples
proabably include calcite and selenite.
Summary of RAM operations: RAM Rover power charging stations inop, electrical issues.
Summary of any observatory issues: Visual observation of sun AM.
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: Two bags

Operations Report – November 27th

Sorry about the Report! This doesn’t belong to this e-list.

On Fri, Nov 29, 2019 at 7:44 PM Atila Meszaros <atila> wrote:

Crew 216 Operations Report 27-Nov-19
SOL: 3
Name of person filing report: Mike Lawson
Non-nominal systems: RAM rover power charging stations inoperable, electrical issue.
Notes on non-nominal systems: Outpost directed Opportunity to be charged at Spirit’s
traditional port.
Generator: run
Hours run: 12.1
From what time last night: 1850
To what time this morning: 0658
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night: 55%
Diesel Reading – 41
Station Propane Reading – 59
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1461926
Water (static tank) (gal): 401
Static to Loft Pump used – yes
Water in Green Hab (gal): 272
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: yes
Hours: 114.5
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 81
Currently charging: no (see notes non-nominal systems).
Opportunity rover used: no
Hours: 68.7
Beginning charge: 46
Ending charge: 46
Currently charging: yes (in Spirit port)
Curiosity rover used: yes
Hours: 119.6
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 81
Currently charging: yes
Notes on rovers: will have to juggle charging sequence.
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:
HabCar used and why, where?
CrewCar used and why, where?
General notes and comments:
Summary of internet: No serious issues.
Summary of suits and radios: Midland GXT serial # A1707006944, erratic power setting fluctuations,
possibly intermittent battery connectivity while on afternoon EVA.
Summary of Hab operations: Routine maintenance and housekeeping.
Summary of GreenHab operations: routine watering.
Summary of Science Dome operations: UV scan of gypsum samples performed. In addition to gypsum, samples
proabably include calcite and selenite.
Summary of RAM operations: RAM Rover power charging stations inop, electrical issues.
Summary of any observatory issues: Visual observation of sun AM.
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: Two bags

Operations Report – November 27th

Crew 216 Operations Report 27-Nov-19
SOL: 3
Name of person filing report: Mike Lawson
Non-nominal systems: RAM rover power charging stations inoperable, electrical issue.
Notes on non-nominal systems: Outpost directed Opportunity to be charged at Spirit’s
traditional port.
Generator: run
Hours run: 12.1
From what time last night: 1850
To what time this morning: 0658
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night: 55%
Diesel Reading – 41
Station Propane Reading – 59
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1461926
Water (static tank) (gal): 401
Static to Loft Pump used – yes
Water in Green Hab (gal): 272
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: yes
Hours: 114.5
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 81
Currently charging: no (see notes non-nominal systems).
Opportunity rover used: no
Hours: 68.7
Beginning charge: 46
Ending charge: 46
Currently charging: yes (in Spirit port)
Curiosity rover used: yes
Hours: 119.6
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 81
Currently charging: yes
Notes on rovers: will have to juggle charging sequence.
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:
HabCar used and why, where?
CrewCar used and why, where?
General notes and comments:
Summary of internet: No serious issues.
Summary of suits and radios: Midland GXT serial # A1707006944, erratic power setting fluctuations,
possibly intermittent battery connectivity while on afternoon EVA.
Summary of Hab operations: Routine maintenance and housekeeping.
Summary of GreenHab operations: routine watering.
Summary of Science Dome operations: UV scan of gypsum samples performed. In addition to gypsum, samples
proabably include calcite and selenite.
Summary of RAM operations: RAM Rover power charging stations inop, electrical issues.
Summary of any observatory issues: Visual observation of sun AM.
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: Two bags

Operations Report – November 28th

Crew 216 Operations Report 28-Nov-19
SOL: 4
Name of person filing report: Mike Lawson
Non-nominal systems: RAM rover power charging stations inoperable, electrical issue, ongoing.
Notes on non-nominal systems:
Generator: run
Hours run: 12.3
From what time last night: 1902
To what time this morning: 0723
List any additional daytime hours when the generator was run: N/A Solar— SOC % (Before generator is run at night): 69 %
Diesel Reading – 40
Station Propane Reading – 58
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1462347
Water (static tank) (gal): 375
Static to Loft Pump used – yes
Water in Green Hab (gal): 267
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: no
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: no
Hours: 114.5
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 100
Currently charging:
Opportunity rover used: no
Hours: 68.7
Beginning charge: 100
Ending charge: 100
Currently charging: yes
Curiosity rover used: no
Hours: 119.6
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 100
Currently charging: yes
Notes on rovers: will have to juggle charging sequence.
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
# Hours the ATVs were used today: 0
Notes on ATVs:
HabCar used and why, where?
CrewCar used and why, where?
General notes and comments:
Summary of internet: No serious issues.
Summary of suits and radios: Power strip to radio charger farm was inadvertently switched off, setting low power alarm off on one radio. Reset, no further issues.
Summary of Hab operations: Routine maintenance and housekeeping. Summary of GreenHab operations: Routine watering.
Summary of Science Dome operations: None, crew holiday.
Summary of RAM operations: RAM Rover power charging stations inop, electrical issues remain unresolved. RAM used to fabricate two baking pans from residue food cans for use in preparing holiday meal. Rover maintenance EVA performed.
Summary of any observatory issues: None, crew holiday.
Summary of health and safety issues: None.
Questions, concerns and requests to Mission Support: 1 bag NB trash in rear airlock. Request that a knife sharpener be added to the kitchen set for future mission. Crew used a field rock for sharpening. expedient (obsidian sample) for immediate need.

Crew 216 Operations Report 26Nov2019

[title Operations Report – November 26th]

Crew 216 Operations Report 26-Nov-19
SOL: 2
Name of person filing report: Mike Lawson
Non-Nominal systems:
Notes on Non-Nominal systems:
Generator: run
Hours run: 12.3
From what time last night: 1900
To what time this morning: 0720
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night: 75% as of 1620
Diesel Reading – 42
Station Propane Reading – 60
EthaNol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1461497
Water (static tank) (gal): 421
Static to Loft Pump used – Yes
Water in Green Hab (gal): 274
Water in Science Dome (gal): 0
Toilet tank emptied: No
Deimos rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: Yes x2 EVAs
Hours: 114
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 48
Currently charging: Yes
Opportunity rover used: Yes
Hours: 68.7
Beginning charge: 100
Ending charge: 46
Currently charging: Yes
Curiosity rover used: Yes
Hours: 119.4
Beginning charge: 100
Ending charge: (On return from EVA, before charging):70
Currently charging: Yes
Notes on rovers: 0
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): No
Reason for use: N/A
Oil Added? No
# Hours the ATVs were used today: 0
Notes on ATVs:
HabCar used and why, where?
CrewCar used and why, where?
General Notes and comments:
Summary of internet: No serious issues.
Summary of suits and radios: Open VOX on radio in HAB caused issues with morning EVA. Resolved.
Summary of Hab operations: Routine maintenance and housekeeping.
Summary of GreenHab operations: Routine watering.
Summary of Science Dome operations: Gypsum samples processing started.
Summary of RAM operations: No issues.
Summary of any observatory issues: Visual observation of sun.
Summary of health and safety issues: Icing on rear HAB airlock, removed by engineer. CO test negative.
Questions, concerns and requests to Mission Support: None

Operations Report – November 25th

Crew 216 Operations Report 25-Nov-19
SOL: 1
Name of person filing report: Mike Lawson
Non-nominal systems:
Notes on non-nominal systems: N/A

Generator: Run
Hours run: 12
From what time last night: 1909
To what time this morning: 0710
List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before generator is run at night: 72% as of 1649
Diesel Reading – 43
Station Propane Reading – 61
Ethanol Free Gasoline: N/A

Water (loft tank) (gal): 47
Water Meter (units): 1461353
Water (static tank) (gal): 436
Static to Loft Pump used – Yes
Water in Green Hab (gal): 279
Water in Science Dome (gal): 0
Toilet tank emptied: Yes

Deimos rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging:

Sojourner rover used:
Hours:
Beginning charge:
Ending charge:
Currently charging:

Spirit rover used: Yes
Hours: 114
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 65
Currently charging: Yes

Opportunity rover used: Yes
Hours: 69.7
Beginning charge: 100
Ending charge: 50
Currently charging: Yes

Curiosity rover used: Yes
Hours: 119
Beginning charge: 100
Ending charge: (On return from EVA, before charging): 42
Currently charging: Yes

Notes on rovers: 100

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): No
Reason for use: N/A
Oil Added? No
# Hours the ATVs were used today: 0
Notes on ATVs:

HabCar used and why, where? N/A
CrewCar used and why, where?

General notes and comments: Crew morale is high.
Summary of internet: Crew usage triage meeting tonight.
Summary of suits and radios: Conducted a ranging test between EVA and HAB, comparing Midland H/H and TERA TR-590 with 5/8th wave antenna. Superior performance from the TERA; will use for future EVAs as HAB NCS on Channel 22.
Summary of Hab operations: Repaired exposed wiring connection in HAB living area.
Summary of GreenHab operations: Routine watering.
Summary of Science Dome operations: Gypsum samples deposited for further processing. Agate and pretrified wood samples UV tested. Fluoresed yellow/red and magenta respetively under low band UV.
Summary of RAM operations: Require replacement light bulb, standard screw in base. Airlock ready room bulb broken, have cannibalized bulb from spare bedroom. 0 balance on hand. Fabricated expedient 4 x 4 junction box cover, exposed wiring connections, HAB living area. 0 balance o/h.
Summary of any Observatory issues: No solar obseration because of cloud cover.
Summary of health and safety issues: Placed CO alarm is spare stateroom. Some crew complaining of evening headaches. Likely just symptomatic of mild dehydration, test is simply to eliminate a possible cause.

Questions, concerns and requests to Mission Support: Light bulb resupply. Suggest two, one for spare stateroom and one for maintenance float. Need power cable (outlet to transformer) for astronomy laptop.