Crew 265 Operations Report Sol 1 25-04-2022
SOL: 1
Name of person filing report: Dave Laude/Sergii Iakymov
Non-nominal systems: Furnace. Curiosity Rover.
Notes on non-nominal systems: Furnace this morning worked properly. The stuck electrical contact seems to have come unstuck on the pressure sensor for now.
Curiosity rover ended with 90% charge after a short drive while others for the same drive were 96-98%. Started at 100%. Driver insisted the data is correct.
ROVERS
Spirit rover used: Yes
Hours: 173.1
Beginning charge: 100
Ending charge: 98
Currently charging: Yes
Opportunity rover used: Yes
Hours: Not recorded
Beginning charge: 100
Ending charge: 96
Currently charging: Yes
Curiosity rover used: Yes
Hours: 186.0
Beginning charge: 100
Ending charge: 90
Currently charging: Yes
Perseverance rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging:
General notes and comments:
Summary of Hab operations: Trained crew on EVA suits, radios and rovers then sim began at noon. Some food supplies were absent. Requested more.
WATER USE:
Water (static tank): Not full. ~445 gallons.
Water (loft tank): 55 gallons
Water Meter: 01580472 units
Static to Loft Pump used – Yes
Static tank pipe heater (on or off): Off
Static tank heater (On or off): Off
Toilet tank emptied: Yes
Summary of internet: Nominal
Summary of suits and radios: Batteries charging. Test of EVA suits (1-6, 8, 9) battery capacity by running fans for 3 hour 40 minutes has shown all to be in good condition by dropping in open circuit voltage to 12.58-12.93V. The remaining two one-piece suits were not on charge when we arrived and have battery voltages ~3V. Will investigate soon.
Summary of GreenHab operations: Not used, nothing to report
WATER USE: N/A
Heater: OFF
Supplemental light: OFF
Harvest: N/A
Summary of ScienceDome operations: Not used, nothing to report
Dual split: Heat or AC, Off
Summary of RAM operations: Tools used for furnace work. DMMs used for battery checks.
Summary of any observatory issues: Won’t be using, nothing to report
Summary of health and safety issues: See HSO Report
Questions, concerns and requests to Mission Support: one bag of burnable is ready for pick up in the engineering airlock.
Water (static tank): Not full. ~435 gallons.