Crew 299 Operations Report 5-16-2024
SOL: 4
Name of person filing report: Rishabh Pandey (Engineer)
Non-Nominal Systems: Suit 9 (broken visor), Suit 11 (fan issue)
Notes on non-nominal systems: Issues with both suits were noted before our mission, both will not be used during our mission.
ROVERS
Rovers Used: None
General notes on rovers:
Summary of Hab operations:
WATER USE: 70.12 Gallons (septic tank cleaning might have caused this value to double from yesterday)
Water (static tank): 309 (using effective value from spreadsheet)
Static tank pipe heater: off
Static tank heater: off
Toilet tank emptied: yes
Summary of internet usage: Catch up on Earthly news, email responses, code development, entertainment
Summary of suits and radios: None used
Summary of GreenHab operations: NA, GreenHab out of operation
Summary of ScienceDome operations: Trimmed radish leaves in an attempt to stop a potential bacterial infection. Soil was checked again. Incident with vial breaking, all glass shards were safely secured and disposed.
Summary of RAM operations: Multimeter and Measuring tape used
Summary of observatory issues: NA