Crew 215 Operations Report 15-Nov-2019
SOL: 5
Name of person filing report: Shane Usher
Non-nominal systems:
Notes on non-nominal systems:
Generator: run
Hours run: 12 h 42 min
From what time last night: 1830
To what time this morning: 0712
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night): 68%
Diesel Reading – 49%
Station Propane Reading – 70%
Ethanol Free Gasoline: N/A
Water (loft tank) (gal): 47
Water Meter (units): 1458114
Water (static tank) (gal): 392
Static to Loft Pump used – yes
Water in Green Hab (gal): 355.5
Water in Science Dome (gal): 0
Toilet tank emptied: yes
Deimos rover used: not at Hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Sojourner rover used: Assigned to Director
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Spirit rover used: yes
Hours: 111.0
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 67%
Currently charging: yes
Opportunity rover used: no
Hours: 66.2
Beginning charge: 100%
Ending charge: 100%
Currently charging: yes
Curiosity rover used: yes
Hours: 117.1
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 80%
Currently charging: yes
Notes on rovers:
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used (gal): 0
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director
HabCar used and why, where? With Director
CrewCar used and why, where? At Grand Junction awaiting Crew 216
General notes and comments: This report template is now produced through an Excel spreasheet template developed by Crew Engineer, Shane Usher.
Summary of internet: Functional
Summary of suits and radios: Functional
Summary of Hab operations: Kitchen benchtop installed. Sink plumbed by Shane Usher and Andrew Wheeler.
Summary of GreenHab operations: Atmospheric equalization to the green hab carried out during the afternoon, plants were watered (16L, 4.5 gal). The heater automatically came on at 5pm.
Summary of Science Dome operations: Washed and crushed gypsum samples, Re-bagged micrometeorite samples.
Summary of RAM operations: Nominal
Summary of any observatory issues: Nominal
Summary of health and safety issues: Conducted a simulated medical emergency.
Questions, concerns and requests to Mission Support: