Today has been a busy day for the Crew 185. As it was our last day before entering simulation, we needed to prepare the hab in the best possible way and to fix as many things as possible before closing our doors.
We decided to work in two groups. Ilaria and David took the car to buy a new battery for the generator, soil for the greenhab and food. Arno, Thibault and John set the laboratory with the 3D printer, the medical supplies, the X-1 spacesuit prototype, etc…
This afternoon, we repaired the generator by replacing the battery and changing a part of the cooling liquid and the oil. It is working better at the moment when I write these lines! Hopefully, it will keep being in a good shape.
We decided that we would begin the simulation tomorrow morning when waking up. Mars, here we come!
The Crew 185
Operations Report – December 17th
GreenHab Report – December 17th
Operations Report – December 16th
GreenHab Report – December 16th
GreenHab Report
Written by David Murray
Supervised by Trisha Randazzo
December 16, 2017
Environmental control: (Choose which is appropriate and explain further if needed)
Ambient (no heating or/cooling)
Ambient with window/door open
· Outside temperature during work hours: -4.5 C
· At 20:25 inside temperature was 15 C.
· Inside temperature high 31
· Inside temperature low 15
· Inside humidity: 16%
Heating
· Functioning nominally
· Turns on at 16 C stops at 20 C
Cooling
· Not available
Both heating and cooling
· Nominal
Shade cloth on/off
· On
Average temperature: (N/A until new sensor is delivered)
· N/A
Changes to crops: Note all emergence of seedlings, death of seedlings, etc
· Two of the bean plants are still drooping
· The sprouting bean plants now has 4 flowers
Daily water usage for crops:
· Used more water to accommodate the drier planter box.
Time(s) of watering for crops:
· 20:25
Morning research observations: (Currently not operational)
· N/A
Changes to research plants:
· N/A
Daily watering and amount of water used:
· 4 Gallons
Aquaponics: (Currently not operational)
· N/A
Narrative: Any other information you want to share
· Completed crew handover activities for GreenHab. David is now well trained as the new GreenHab Officer.
Support/supplies needed:
· Soil and a fire extinguisher
Astronomy Report – December 15th
Astronomy Report
Name: Thomas Horn Crew: 184
Date: 7/15/17
Sky Conditions: Clear
Wind Conditions: Light
Observation Start Time: 2:00 pm
Observation End Time: 2:30 pm
Summary: No observing, shutdown Observatory and returned Laptop to HAB
Objects Viewed: None
Problems Encountered: None