Crew 190 Operations Report 17th March 2018
SOL: 6
Name of person filing report: Bastien BAIX
Non-nominal systems: –
Notes on non-nominal systems: –
Generator (hours run): Turned off at 9.36 am and turned on at 6.10 pm.
Solar – SOC 99% (Before generator is run at night)
Diesel – ~45%
Propane – 81%
Ethanol Free Gasoline (5 Gallon containers for ATV) – 2 empty jerrycans.
Water (trailer) – 0 gallons.
Water (static) – ~ 250 gallons
Water (third tank) – 500 gallons
Trailer to Static Pump used – NO
Water (loft) – Static to Loft Pump used – YES
Water Meter: 132 303.3
Toilet tank emptied: NO
ATV’s Used: –
Oil Added: NO
ATV Fuel Used: NO
Hours the ATVs were used today: _
Notes on ATVs: –
Deimos rover used: NO
Hours: 116.6
Beginning charge: 100%
Ending charge: –
Currently charging: NO
Notes on Deimos rover: flat tire, not yet repaired
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: YES
Hours: 25.1
Beginning charge: 89%
Ending charge: 100%
Currently charging: YES
Opportunity rover used: NO
Hours: 24.1
Beginning charge: 100%
Ending charge: –
Currently charging: NO
Curiosity rover used: YES
Hours: 19.3
Beginning charge: 86%
Ending charge: 100%
Currently charging: YES
HabCar used and why, where: –
General notes and comments: –
Summary of internet: ~ 250 Mb remaining
Summary of suits and radios: –
Summary of Hab operations: Ariane, Sophie & Bastien working on their experiments
Summary of GreenHab operations: –
Summary of ScienceDome operations: Martin, Maximilien & Fred working on their experiments.
Summary of RAMM operations: the muon detector of Sophie is remotely controlled from the Hab
Summary of health and safety issues: –
Questions, concerns and requests to Mission Support: –