Crew 190 Operations Report 20th March 2018
SOL: 9
Name of person filing report: Bastien BAIX
Non-nominal systems: –
Notes on non-nominal systems: –
Generator (hours run): Turned off at 9.37 am and turned on at 6.45 pm.
Solar – SOC 77% (Before generator is run at night)
Diesel – ~45%
Propane – 81%
Ethanol Free Gasoline (5 Gallon containers for ATV) – 1 ½ full jerrycans.
Water (trailer) – 0 gallons.
Water (static) – 550 gallons
Water (third tank) – 0 gallons
Trailer to Static Pump used – YES
Water (loft) – Static to Loft Pump used – YES
Water Meter: 132 470.8
Toilet tank emptied: YES
ATV’s Used: –
Oil Added: NO
ATV Fuel Used: YES
Hours the ATVs were used today: _
Notes on ATVs: –
Deimos rover used: NO
Hours: 116.6
Beginning charge: 100%
Ending charge: –
Currently charging: NO
Notes on Deimos rover: the wheel is under reparation
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: NO
Hours: 26.2
Beginning charge: 71%
Ending charge: –
Currently charging: NO
Opportunity rover used: NO
Hours: 25
Beginning charge: 100%
Ending charge: –
Currently charging: NO
Curiosity rover used: NO
Hours: 20.7
Beginning charge: 82%
Ending charge: –
Currently charging: YES
HabCar used and why, where: –
General notes and comments: The water level of the aquapony system is lowering due to evaporation, should we refill it ?
Summary of internet: ~ 0 Mb remaining
Summary of suits and radios: –
Summary of Hab operations: Power charging to rovers resolved. Fuses were being blown when two outlets were being used. With one cord the issue is resolved.
Summary of GreenHab operations: –
Summary of ScienceDome operations: –
Summary of RAMM operations: –
Questions, concerns and requests to Mission Support: –