Crew 194 Operations Report 18.05.18
SOL: 5
Name of person filing report: Ben Easter
Non-nominal systems: Continuing to work on power system. Generator run during day today per Shannon’s instructions.
Notes on non-nominal systems:
Generator (hours run): Overnight approximately 10 plus 4 hours today per Shannon
Solar— SOC 52%
Diesel – Over 50%
Propane – psi. Not checked
ATV Fuel (Ethanol free gasoline) – 5 gallons.
Water (trailer) – 500 gallons.
Water (static) – Approximately 250
Trailer to Static Pump used – No
Water (loft) – Static to Loft Pump used – Yes
Water Meter: 135115
Toilet tank emptied: Yes
Date last emptied: Today
ATV’s (Honda, 300, 350.1, 350.2, 350.3): all except Honda
ATV Oil Checked?: No
ATV Oil Added?: No
ATV Fuel Used: Approximately 3 gallons
# Hours the ATVs were Used today: 1 hours
Notes on ATVs: We recovered ATV 300.
Deimos rover used: No
Hours: N/A
Beginning charge: 100%
Ending charge: XX %
Currently charging: Yes or No
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: Unknown
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A
Spirit rover used: Yes
Hours: 35.8
Beginning charge: 100 %
Ending charge: 90%
Currently charging: Yes
Opportunity rover used: Yes
Hours: 34.2
Beginning charge: 100 %
Ending charge: 94 %
Currently charging: Yes
Curiosity rover used: No
Hours: 29.8
Beginning charge: 100 %
Ending charge: XX %
Currently charging: Yes or No
Hab Car used?: No
Where was Hab Car used?:
Why was Hab Car used?:
General notes and comments:
Summary of internet: Working well
Summary of suits and radios: working well
Summary of Hab operations: No problems
Summary of GreenHab operations: N/A
Summary of ScienceDome operations: N/A
Summary of RAM operations: N/A
Summary of health and safety issues: none noted
Questions, concerns and requests to Mission Support: None.