Crew 306 Operations Report 23-12-2024
SOL: 01
Name of person filing report: Keegan Chavez
Non-nominal systems: Suit 1 battery, Suit 9 battery
Notes on non-nominal systems: Suit 1 and suit 9 battery packs are not charging, suit 1 battery pack was at 100%SOC at beginning of day and is now at 89%SOC after EVA, suit 9 battery pack was at 81%SOC at beginning of day and is still at this level, both suits have been charging all day
ROVERS
Spirit rover used: Yes
Hours: (before EVA): 259.6
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 92
Currently Charging: Yes
Opportunity rover used: Yes
Hours: (before EVA): 199
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 96
Currently Charging: Yes
Curiosity rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: Yes
Perseverance rover used: Yes
Hours: (before EVA): 297.4
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 92
Currently Charging: Yes
General notes on rovers: Operations were nominal
Summary of Hab operations: Operations were nominal
Water Use (please use both methods to estimate water usage)
Time of measurements: 12/22/2024 1200 – 12/23/2024 1700
1) Per formula: 75.15 gal
2) Smart Home Dashboard: 36.7 gal
Water (static tank, remaining gallons): 474.85 (per formula)
Static tank pipe heater (on or off): On
Static tank heater (on or off): On
Toilet tank emptied (no or yes): No, 2/3 full
Summary of internet: Mission support provided crew with second router for Hab to test connectivity, after multiple resets and sync attempts no connection was made, router was returned to mission support; nominal internet usage otherwise
Summary of suits and radios: suits 1-6 were used for EVA, see note above on suit 1 and suit 9 battery pack, radios were all operational and are fully charged
Summary of GreenHab operations: watered plants, checked fruiting of cucumbers and tomatos, hand pollinated cucumbers tasted arugula (needs to be removed), harvest of radish and broccoli
WATER USE: 7 gal
Heater (On or Off): On, automatic
Supplemental light (hours of operation): 1700 – 2200
Harvest (name, weight in grams): radish greens, 32 grams; broccoli microgreens, 14 grams
Summary of Science Dome operations: GreenHab officer: fed mushrooms, used laminar flow hood to collect precipitates from mushroom, moved pipette equipment out of laminar flow hood
Dual split (Heat or AC, On or Off): On, automatic
Summary of RAM operations: Engineer: unpacked and took inventory of sensor equipment; Journalist: integrated raspberry pi and lidar onto drone, used 1 heavy duty zip tie
Summary of any observatory issues: No issues.
Summary of health and safety issues: Multiple repairs to the tunnel have been identified:
Hab rear airlock to RAM: 6 rings are missing zip ties
Hab rear airlock to GreenHab split: 6 rings missing zip ties
GreenHab tunnel: 6 rings missing zip ties
GreenHab split to ScienceDome/Observatory split: 2 rings missing zip ties, tarp over intersection has numerous holes of varying size
ScienceDome Tunnel: 5 rings missing zip ties, 1 ring has been completely torn out, 1 tennis ball missing
Observatory Tunnel: 6 rings missing zip ties, 3 small holes in tarp
Questions, concerns and requests to Mission Support: Please send instructions on how to patch holes in tarp, planning on doing all listed repairs tomorrow