Crew 306 Operations Report 24-12-2024
SOL: 02
Name of person filing report: Keegan Chavez
Non-nominal systems: Headset 4
Notes on non-nominal systems: Headset 4 microphone was not working, headset 4 speaker was nominal, radio 4 was nominal
ROVERS
Spirit rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: Yes
Opportunity rover used: Yes
Hours: (before EVA): 199.3
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 77
Currently Charging: Yes
Curiosity rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: Yes
Perseverance rover used: Yes
Hours: (before EVA): 297.6
Beginning charge: (Before EVA): 100
Ending charge: (On return from EVA, before recharging): 89
Currently Charging: Yes
General notes on rovers: Opportunity battery level dropped more than Perseverance, operating conditions were nominal for both
Summary of Hab operations: Operations were nominal
Water Use (please use both methods to estimate water usage)
Time of measurements: 12/23/2024 1700 – 12/24/2024 1700
1) Per formula: 42.4775 gal
2) Smart Home Dashboard: 38.64 gal
Water (static tank, remaining gallons): 432.37 (per formula)
Static tank pipe heater (on or off): On
Static tank heater (on or off): On
Toilet tank emptied (no or yes): No, 2/3 full
Summary of internet: nominal internet usage
Summary of suits and radios: suits 4-6 were used for EVA, radios were all operational and are fully charged
Summary of GreenHab operations: GreenHab Officer: watered cucumbers, watered floor to increase humidity, harvest of basil, thyme, and radish; Commander: gathered water to wash sand samples collected during EVA
WATER USE: 6.13 gal
Heater (On or Off): On, automatic
Supplemental light (hours of operation): 1700 – 2200
Harvest (name, weight in grams): Basil: 7g; Thyme: >1g ; Radish: 14g
Summary of Science Dome operations: Commander: moved samples collected from EVA to science dome, weighed and organized samples, used scale and beakers, washed samples of sand to prepare for iron extraction; GreenHab Officer: fed mushrooms
Dual split (Heat or AC, On or Off): On, automatic
Summary of RAM operations: Engineer: used 25 heavy duty zip ties, 2 tennis balls, and duct to make repairs throughout tunnels; HSO: attempting to fix Christmas Grogu, using wire strippers, solder wire, solder station
Summary of any observatory issues: No issues.
Summary of health and safety issues: No issues.
Questions, concerns and requests to Mission Support: N/A