Operations Report – January 3rd

Crew 306 Operations Report 01-03-2025
SOL: 12
Name of person filing report: Keegan Chavez

Non-nominal systems: Water Filter UV Lamp, Overflow sensor
Notes on non-nominal systems: UV lamp light is out, alarm sounds when plugged in, needs to be replaced. Overflow sensor is still unplugged

ROVERS
Spirit rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: No

Opportunity rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: Yes

Curiosity rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: Yes

Perseverance rover used: No
Hours: (before EVA):
Beginning charge: (Before EVA):
Ending charge: (On return from EVA, before recharging):
Currently Charging: No
General notes on rovers: none

Summary of Hab operations: Upper and lower Hab floors were cleaned, crew members showered, extra water was brought for cleaning and full showers
Water Use (please use both methods to estimate water usage)
Time of measurements: 1/2/2024 1800 – 1/3/2024 2000
1) Per formula:
2) Smart Home Dashboard: 47.85 gal
Water (static tank, remaining gallons): 242.855 gal (per formula)
Static tank pipe heater (on or off): On
Static tank heater (on or off): On
Toilet tank emptied (no or yes): no

Summary of internet: nominal internet usage

Summary of suits and radios: No suits were used today, all radios are charged and fully operational

Summary of GreenHab operations: GreenHab Officer: watered plants and the floor to increase humidity, removed dead leaves, cleaned GreenHab
WATER USE: 3.5 gal
Heater (On or Off): On, automatic
Supplemental light (hours of operation): 1700 – 2200
Harvest (name, weight in grams): none

Summary of Science Dome operations: GreenHab Officer: collected waste media from mushrooms, fed mushrooms, measured temp of mushrooms, cleaned out grow tent, cleaned Science Dome; Commander: cleaned Science Dome
Dual split (Heat or AC, On or Off): On, automatic

Summary of RAM operations: Engineer: Soldered prototype suit biometric measurement system, packed up equipment, cleaned RAM

Summary of any observatory issues: No issues
Summary of health and safety issues: No issues

Questions, concerns and requests to Mission Support:

Copyright © The Mars Society. All rights reserved. | Main Site