EVA Report – February 6th

Crew 310 EVA Report 06-02-2025

EVA #: 7

Author: Helena Arias Casals

Purpose of EVA: Installation of guy wires in the Corner Reflector (wind is expected on Friday so this should be done for safety). Scouting the Kissing Camel area for the large-scale art piece.

Start time: 8:50 am

End time: 11.45 am

Narrative: The crew depressurized through the main entrance to the Hab. They first added two guy wires to the Corner Reflector and tried to attach the third one without success due to a size issue. The crew utilized two rovers to travel to the Kissing Camel Ridge area, which was scouted during the EVA. After tedious analysis of the situation, they failed to install a test line of fabric for the large-scale art piece due to the wind gusts. Then, further observations and measures were taken to understand and simplify the large-scale art piece, continuing this work during EVA #8.

Destination: Destination: 20 meters NW the HAB. Then the north area of the Kissing Camel Ridge W.

Coordinates (use UTM WSG 84): 5185000 E, 4252000 N, and 518000 E, 4249550 N

EVA Participants: Mònica Roca i Aparici (Mission Specialist) (EVA Leader), Helena Arias (Engineer), Ariadna Farrer (Commander), Estel Blay (Health and Safety Officer).

Road(s) and routes per MDRS Map: Walk up the little hill behind the HAB (20 meters NW). After the wires installation, drive on Cow Dung Road 0110.

Mode of travel: walking to the first destination, then driving.

Copyright © The Mars Society. All rights reserved. | Main Site