EVA Report – March 14th

EVA #: 16

Author: Robin GORIUS (Crew engineer, EVA Leader)

Purpose of EVA: retrieve the atmospheric instruments from Marble Rituals

Start time: 9:01 AM

End time: 9:46 AM

Narrative: The crew went to marble ritual with curiosity and perseverance. They parked the rovers at 9:10 AM then walked to the instrument site. On site they retrieved the last data set and started disconnecting all the instruments from the batteries at 9:13 AM. They did two back and forth between the instrument site and the rovers and completed the task at 9:33. They drove back to the station and placed every instrument in the RAM. They entered the hab airlock at 9:41 AM. With that the final EVA of crew 311 was completed!

Destination: Marble Rituals

Coordinates (use UTM WSG 84): 518250 E, 4250750 N

EVA Participants: Erin Pougheon (Crew commander), Isolde Louzier-Ricalens (Crew Journalist), Robin GORIUS ( and EVA Leader).

Road(s) and routes per MDRS Map: Cow Dung Road 0110

Mode of travel: Driving to Marble Rituals, walking to the experiments site and coming back to the rovers. The crew will drive back and forth between the station and the instrument site to bring everything home.

Vehicles used: Curiosity and Perseverance

Curiosity: Start 100%, 300.7h/ End 92%, 300.8h

Perseverance: Start 100%, 310.4h/ End 92%, 310.5h

Copyright © The Mars Society. All rights reserved. | Main Site