Operations Report – February 15th

 

Crew 275 Operations Report 15Feb2023
SOL: 3

Name of person filing report: Quentin ROYER
Non-nominal systems:
• Toilets
• RAM: 1 leak in the roof
• Science Dome: 3 leaks in the walls
• Science Dome: Heater possibly non-nominal during the night
• GreenHab: supplemental light

Notes on non-nominal systems:
• RAM: 1 leak in the roof, probably due to snow. There was no leak in the morning due to freezing temperatures, but this afternoon the bucket which had been placed under the leak was full and had to be replaced.
• Science Dome: As yesterday, 1 leak coming from the junction between the ground and the wall under the window. A small amount of water leaked from the outside and flowed into the Science Dome. The puddle was about 1 cm high, 5 cm wide, and 3 meters long at 3:00 pm, and is located close to an electric socket. As yesterday, 1 leak coming from the junction between the ground and the wall near the door. The puddle was about 0.5 cm high, 3 cm wide, and 70 cm long at 3:00 pm. This second puddle fully dried during the afternoon. A third leak appeared at the junction between the ground and the wall under the window, but in the right side of the window. At 5:00 pm, the puddle was about 0.5 cm high, 4 cm wide and 1.5 meters long, and it is located close to an electric socket.
• Science Dome: as per protocol of an experiment, the Crew Engineer placed an environmental sensor in the Science Dome, including a temperature sensor. A recording of the temperature was performed during the night, and it shows that the temperature decreased during the whole night. Therefore, we assume that the heater did not turn on properly. I can send you the graph of the temperature between 11:55 pm and 6:55 am if you need it.
• GreenHab: supplemental light did not switch on yesterday at 10:00 pm. The Crew Botanist went in the GreenHab to set up the timer at the right time (it was 10 to 15 minutes late).

ROVERS
Spirit rover used: No
• Hours: 208.9
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

Opportunity rover used: No
• Hours: 113.0
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

Curiosity rover used: No
• Hours: 220.8
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

Perseverance rover used: No
• Hours: 255.4
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

General notes on rovers: No EVA today – the rovers were not used.

Summary of Hab operations: The crew conducted routine activities, including rehearsal of instruments’ deployment.
• WATER USE: 15.96 gallons
• Water: 424.35 gallons
• Static tank pipe heater: On
• Static tank heater: On
• Toilet tank emptied: No

Summary of internet: Hughes Net was used during the day before the opening of COMMS for email purposes, and Starlink (MDRSCampus-Guest) is used during COMMS. Internet for the AI4U experiment (MDRSCampus) was tested today within the boundaries of the protocol of this experiment and is fully operational.

Summary of suits and radios: Spacesuits and radio were not used today, as there was no EVA.

Summary of GreenHab operations: The Crew botanist conducted routine operations and water tests within the protocol of the aquaponics experiment.
• WATER USE: 8.77 gallons
• Heater: On
• Supplemental light: From 10:15 pm to 2:00 am – Timer settings were changed back to nominal
• Harvest: 177 g of tomatoes – 1 g of lemon balm

Summary of ScienceDome operations: The Commander and Crew Scientist tested some experimental protocols.
• Dual split: Heat / From 10 pm to 7 am – We suspect that the dual split did not work this night

Summary of RAM operations: Trainings for the MegaAres experiment were performed. The Crew Engineer repaired a support arm used for the EchoFinder experiment. Environmental sensors were prepared for future deployment.

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: There was a small safety issue in the RAM using a welding iron. As the welding iron was still hot, it made contact with a small piece of aluminum which started to melt. The resulting hole is very small, about a centimeter in diameter. He reacted quickly by removing the welding iron when the first vapors arrived, and putting it in the RAM airlock. He contacted the Hab to inform us before turning on the supplemental ventilation of the RAM, as there was no immediate risk for his health.

Questions, concerns, and requests to Mission Support: None

Operations Report – February 14th

 

 

Crew 275 Operations Report

14th Feb 2023

SOL: 2

Name of person filing report: Quentin ROYER
Non-nominal systems:
• Toilets
• Leftmost knob of stove
• RAM: 1 leak in the roof
• Science Dome: 2 leaks in the walls

Notes on non-nominal systems:
• Leftmost knob of stove: the knob was not working, so we removed it and used the 3D-printed one which is next to it. As we have a 3D-printer (we have not tried it yet), we might 3D-print a new knob before the end of the mission, with your approval.
• RAM: 1 leak in the roof, probably due to snow. There is approximately one drop every four seconds. We discovered the leak during the afternoon and have taken appropriate measures. We placed a bucket under the leak (at 4:20 pm), to collect the water. We removed every sensitive items from the ground and covered them with tarps. I took pictures of the current situation and can send them to you if that can help.
• Science Dome: 1 leak coming from the junction between the ground and the wall under the window. A small amount of water leaked from the outside and flowed into the Science Dome. The puddle was about 1 cm high, 5 cm wide, and 3 meters long at 5:00 pm, and is located close to an electric socket. 1 leak coming from the junction between the ground and the wall near the door. The puddle was about 0.5 cm high, 3 cm wide, and 70 cm long at 5:00 pm. This second puddle partially dried during the afternoon. I took pictures of the situation if you need.

ROVERS
Spirit rover used: No
• Hours: 208.9
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

Opportunity rover used: No
• Hours: 113.0
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

Curiosity rover used: No
• Hours: 220.8
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

Perseverance rover used: No
• Hours: 255.4
• Beginning charge: 100%
• Ending charge: N/A
• Currently charging: Yes

General notes on rovers: No EVA today – the rovers were not used.

Summary of Hab operations: The crew conducted routine activities including deployment of experiments.
• WATER USE: 18.07 gallons
• Water: 440.34 gallons
• Static tank pipe heater: On
• Static tank heater: On
• Toilet tank emptied: Yes

Summary of internet: Hughes Net was used during the day before the opening of COMMS for email purposes, and Starlink is used during COMMS. Environmental sensors were connected to Outpost 2g local network. We use the latter to have a communication between the sensors and a computer. No internet data should be used through this process, as we only use it locally.

Summary of suits and radios: Spacesuits were not used today, as there was no EVA. Spacesuit n°6 was repaired yesterday and is not considered as non-nominal anymore.

Summary of GreenHab operations: The Crew botanist set up the aquaponics system, harvested and watered the crops. He also seeded carrots.
• WATER USE: 14.25 gallons
• Heater: On
• Supplemental light: From 10 pm to 2 am
• Harvest: 166 g of carrots (without leaves, and 364 g with leaves) – 2 g of thyme

Summary of ScienceDome operations: The Commander and crew Scientist tested some experimental protocols, and observations were performed with regards to the leaks. An environmental sensor was placed on the table.
• Dual split: Heat / From 10 pm to 7 am

Summary of RAM operations: Crew Engineer and crew Astronomer trained to build the weather station which will be set up during an EVA later on. Countermeasures were taken with regard to the leak. RAM operations were suspended at 11 am because of the very cold conditions in the RAM.

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: A crew member slightly hurt their finger during routine operations.

Questions, concerns, and requests to Mission Support:
• Does the astronomer have his own wifi network to plan the observations? If so, what are the login and password? If not, which wifi network should he use to plan observations?
• Would it be possible to have an extended use of the Starlink network? We have one experiment which will require a 24/7 access to a good internet connection. It will not use much data (we can monitor it with you on the first days, and reduce it if needed). Would it be possible to have a 24/7 access to Starlink? Again, we will not use it all the time, we will use it during random moments of the day.
• If the previous request is not possible, is it possible to have a supplemental access to Starlink between 2 pm and 5 pm?

Operations Report – February 13th

 

 

Crew 275 Operations Report 13Feb2023
SOL: 1

Name of person filing report: Quentin ROYER
Non-nominal systems:
• Toilets
• Upper Deck outside weather station
• Spacesuit n°6

Notes on non-nominal systems:
• Weather station: the screen is on, but does not display any value and says “configure wifi for more detailed forecast”, and there is a red cross on the WiFi logo at the bottom left of the screen. How can we fix this?
• Spacesuit n°6: the collar is linked to the backpack with the help of only one fixation, instead of two on the other suits. Therefore this suit was not used today. There is a spare collar in the shelf in the EVA preparation room, do we have the permission to repair the spacesuit with it?

ROVERS
Spirit rover used: Yes
• Hours: 208.9
• Beginning charge: 100%
• Ending charge: 91%
• Currently charging: Yes

Opportunity rover used: Yes
• Hours: 113.0
• Beginning charge: 100%
• Ending charge: 92%
• Currently charging: Yes

Curiosity rover used: Yes
• Hours: 220.8
• Beginning charge: 100%
• Ending charge: 92%
• Currently charging: Yes

Perseverance rover used: Yes
• Hours: 255.4
• Beginning charge: 100%
• Ending charge: 88%
• Currently charging: Yes

General notes on rovers: Spirit and Opportunity were used during the morning EVA. Perseverance and Curiosity were used during the afternoon EVA.

Summary of Hab operations: The crew finished settling in the Hab, conducted the two training EVAs and started to set up the first experiments. An inventory of food, hygiene and medication items was performed All operations were nominal.
• WATER USE: 26.24 gallons
• Water: 458.41 gallons
• Static tank pipe heater: On
• Static tank heater: On
• Toilet tank emptied: No

Summary of internet: No internet was used during the day before the opening of COMMS. We are using Hughes Net (Outpost 2g and Outpost 5g), and Starlink (MDRScampus-Guest).

Summary of suits and radios: Spacesuit n°6 is reported as non-nominal. The other suits are nominal. Radios were charged after the EA and are now all charged off-charger as the green-light was blinking. All radios were nominal.

Summary of GreenHab operations: The Crew botanist set up the aquarium for the aquaponics experiment. He then harvested tomato and basil.
• WATER USE: 21.78 gallons
• Heater: On
• Supplemental light: From 10 pm to 2 am
• Harvest: 223 g of tomato – 3 g of basil

Summary of Science Dome operations: An inventory was performed by the Crew Scientist.
• Dual split: Heat / From 10 pm to 7 am

Summary of RAM operations: An inventory was performed by the Crew Engineer.

Summary of any observatory issues: The Robotic Observatory was repaired and has been reported as operational by Mission Support. Operations are planned but the Crew astronomer for the next days, we will keep Mission support updated with regard to this.

Summary of health and safety issues: Small cut on the finger of a crew member.

Questions, concerns and requests to Mission Support:
• Is it possible to reduce / cut the fan that supplies air in the Commander / Executive Officer’s rooms?
• Could you remind us of the internet networks we are allowed to use, and their availability time slots?
• How can we monitor our internet consumption on Hughes Net and Starlink?
• What is the limit of internet consumption each day / during the mission?
• Where is the charger for the power drill that is located in the RAM?

Operations Report – February 12th

 

 

Crew 275 Operations Report 12Feb2023
SOL: 0

Name of person filing report: Quentin ROYER
Non-nominal systems:
• Toilets
• MDRS Robotic observatory

Notes on non-nominal systems: As Crew 275 arrived today, non-nominal systems are the ones that were non-nominal for the previous crew.

ROVERS
Spirit rover used: Yes
• Hours: 208.9
• Beginning charge: 100%
• Ending charge: 91%
• Currently charging: Yes

Opportunity rover used: Yes
• Hours: 113.0
• Beginning charge: 100%
• Ending charge: 93%
• Currently charging: Yes

Curiosity rover used: Yes
• Hours: 220.8
• Beginning charge: 100%
• Ending charge: 91%
• Currently charging: Yes

Perseverance rover used: Yes
• Hours: 255.4
• Beginning charge: 100%
• Ending charge: 89%
• Currently charging: Yes

General notes on rovers: The 4 rovers were used out of sim for training

Summary of Hab operations: The crew arrived at 12:30 and Hab operations consisted only in training.
• WATER USE: 0 gallons before the opening of COMMS
• Water: 484.65 gallons
• Static tank pipe heater: On
• Static tank heater: On
• Toilet tank emptied: Yes

Summary of internet: Starlink was used today, we will switch to Hughes Net tomorrow

Summary of suits and radios: Nothing to report

Summary of GreenHab operations: No GreenHab operations
• WATER USE: 0 gallons
• Heater: On
• Supplemental light: From 10 pm to 2 am (according to Mission Support)
• Harvest: None

Summary of ScienceDome operations: No ScienceDome operations
• Dual split: Heat / From 10 pm to 7 am (according to Mission Support)

Summary of RAM operations: No RAM operations

Summary of any observatory issues: Robotic Observatory is closed until further notice

Summary of health and safety issues: Nothing to report

Questions, concerns and requests to Mission Support: None

Operations Report – February 10th

 

 

Crew 274 Operations Report 2/10/2023

SOL: 12

Name of person filing report: Alexis Joseph Lojek

Non-nominal systems: Toilet. Robotic Observatory.

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews. Robotic observatory is closed until further notice.

ROVERS

Spirit rover used: No

Hours: 208.8

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.9

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: No

Hours: 220.7

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: No

Hours: 255.4

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

General notes on rovers: Rovers were cleaned by the crew today.

Summary of Hab operations: The habitat is in a nominal condition.

WATER USE: 52 gallons as of 6:56 pm

Water (static tank): 184 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were not used but are off chargers from yesterday. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 12:14 – 1:02 pm.

WATER USE: 14.79 gallons (Same as yesterday).

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: No.

Summary of ScienceDome operations: Science dome was cleaned today.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: RAM was cleaned today.

Summary of any observatory issues: The MDRS Robotic Observatory is inoperable until further notice due to the mechanical issue described in Sol 9’s Operations report.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – February 9th

 

 

Crew 274 Operations Report 2/9/2023

SOL: 11

Name of person filing report: Alexis Joseph Lojek

Non-nominal systems: Toilet. Robotic Observatory.

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews. Robotic observatory is closed until further notice.

ROVERS

Spirit rover used: Yes

Hours: 208.8

Beginning charge: 100%

Ending charge: 53%

Currently charging: Yes

Opportunity rover used: Yes

Hours: 112.9

Beginning charge: 100%

Ending charge: 55%

Currently charging: Yes

Curiosity rover used: No

Hours: 220.7

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: No

Hours: 255.4

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

General notes on rovers: Rovers Spirit and Opportunity were used for the morning EVA and plugged in when they returned, as it was a cloudless day and before noon. Curiosity and Perseverance were not utilized.

Summary of Hab operations: Toilet tank was emptied this evening and habitat is in a nominal condition.

WATER USE: 42 gallons as of 6:50pm

Water (static tank): 236 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged after EVA today and are off chargers. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 12:39 – 1:04 pm.

WATER USE: 14.79 gallons

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: Yes; 86 grams of tomatoes. Total: 86 grams.

Summary of ScienceDome operations: GHO Tyler Hines’ experiment concluded today. The Microgreens were a “partial success” according to Hines, with cress being the most successful to germinate. The LDEF seeds – one that was previously noted as germinating on Sol 6 is still germinating, and will be preserved for future study. Th rest of the seeds that did not germinate will be discarded.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: The MDRS Robotic Observatory is inoperable until further notice due to the mechanical issue described in Sol 9’s Operations report.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – February 8th

 

 

Crew 274 Operations Report 2/8/2023

SOL: 10

Name of person filing report: Alexis Lojek

Non-nominal systems: Toilet. Robotic Observatory.

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews. Robotic observatory is closed until further notice.

ROVERS

Spirit rover used: Yes

Hours: 208.5

Beginning charge: 100%

Ending charge: 75%

Currently charging: Yes

Opportunity rover used: Yes

Hours: 112.5

Beginning charge: 100%

Ending charge: 76%

Currently charging: Yes

Curiosity rover used: Yes

Hours: 220.7

Beginning charge: 100%

Ending charge: 80%

Currently charging: No

Perseverance rover used: Yes

Hours: 255.4

Beginning charge: 100%

Ending charge: 71%

Currently charging: No

General notes on rovers: Rovers Spirit and Opportunity were used for the morning EVA and plugged in when they returned, as it was a cloudless day and before noon. Curiosity and Perseverance were utilized for the afternoon EVA, but returned after noon, so were not plugged.

Summary of Hab operations: Toilet tank was emptied this morning and habitat is in a nominal condition.

WATER USE: 36 gallons as of 5:30pm

Water (static tank): 278 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged yesterday and are off chargers. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 1:01 – 1:32 pm.

WATER USE: 12.68 gallons

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: No.

Summary of ScienceDome operations: GHO Tyler Hines’ experiment is continuing to be monitored. Forty LDEF seeds placed in the GreenHab are continuing to be monitored as well.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: The MDRS Robotic Observatory is inoperable until further notice due to a mechanical issue described in Sol 9’s Operations report.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – February 7th

Crew 274 Operations Report 2/7/2023

SOL: 9

Name of person filing report: Alexis Lojek

Non-nominal systems: Toilet. Robotic Observatory.

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews. Robotic observatory is closed until further notice. Please see more detailed explanation under “summary of any observatory issues.”

ROVERS

Spirit rover used: Yes

Hours: 208.3

Beginning charge: 100%

Ending charge: 49%

Currently charging: Yes

Opportunity rover used: Yes

Hours: 112.4

Beginning charge: 100%

Ending charge: 72%

Currently charging: No

Curiosity rover used: Yes

Hours: 220.5

Beginning charge: 100%

Ending charge: 76%

Currently charging: No

Perseverance rover used: No

Hours: 255.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

General notes on rovers: Rover Spirit was used for the morning EVA and plugged in before noon to charge as it was a beautiful, cloudless day outside. Opportunity and Curiosity were used for the afternoon EVA, but returned after noon, so were not plugged in to charge.

Summary of Hab operations: Hab is in a nominal condition.

WATER USE: Mission Support facilitated a water delivery before we were able to measure our water usage.

Water (static tank): 314 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged yesterday and are off chargers. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 10:27 – 11:01 pm and harvested a number of vegetables.

WATER USE: 13.74 gallons used. By the GHO’s calculations, approximately 22 gallons will be remaining at the end of the mission, after Saturday morning’s watering.

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: Yes. 99 grams of tomatoes, 26 grams of lettuce, 30 grams of carrots, 26 grams of spinach, and 8 grams of kale microgreens. Total: 189 grams.

Summary of ScienceDome operations: GHO Officer Tyler Hines’ experiment is continuing to be monitored; cress microgreens have been harvested. Forty Long Duration Exposure Facility seeds were relocated to the Greenhab and are sitting on a shelf in a wet paper towel in order to further support the germination process.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: One side of the dome is not opening because the straps that provide tension for the doors were wrapped around the motor. The stress on the straps is severe enough that there is no way to release that tension to try and rewrap it. The crew has been informed that the MDRS Observatory is inoperable until further notice.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – 6th

Crew 274 Operations Report 2/6/2023

SOL: 8

Name of person filing report: Alexis Lojek

Non-nominal systems: Toilet

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews.

ROVERS

Spirit rover used: No

Hours: 208.0

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: No

Hours: 220.3

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: Yes

Hours: 255.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: No

General notes on rovers: No rovers were utilized today.

Summary of Hab operations: Toilet was drained into the septic system this morning.

WATER USE: 39 gallons as of 4:09 pm.

Water (static tank): 249 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: Yes

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged yesterday and are off chargers. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 11:23 – 12:00 pm.

WATER USE: 12.68 gallons used

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: No

Summary of ScienceDome operations: GHO Officer Tyler Hines’ experiment is continuing to be monitored; Cress microgreens are almost completely sprouted.

Dual split: Still on a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: No observatory issues.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: N/A

Operations Report – February 5th

Crew 274 Operations Report 2/5/2023

SOL: 7

Name of person filing report: Alexis Lojek

Non-nominal systems: Toilet.

Notes on non-nominal systems: Mission Support will install a new toilet holding tank between crews.

ROVERS

Spirit rover used: No

Hours: 208.0

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Opportunity rover used: No

Hours: 112.2

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: No

Hours: 220.3

Beginning charge: 100%

Ending charge: N/A

Currently charging: Yes

Perseverance rover used: Yes

Hours: 255.2

Beginning charge: 100%

Ending charge: 44%

Currently charging: No

General notes on rovers: Rover Perseverance was used during today’s EVA. The team returned after noon, so they were not plugged in.

Summary of Hab operations: Habitat is in a nominal condition.

WATER USE: 26 gallons as of 5:45 pm.

Water (static tank): 288 gallons remaining

Static tank pipe heater (On or off): On

Static tank heater (On or off): On

Toilet tank emptied: No

Summary of internet: Nominal

Summary of suits and radios: Suits are in nominal condition and charging. Radios were charged after EVA completion and taken off the chargers after the red charging lights turned off. All conditions normal.

Summary of GreenHab operations: GHO Hines watered plants from 2 – 2:40 pm.

WATER USE: 12.64 gallons used

Heater: On

Supplemental light: 4 hours (10pm-2am)

Harvest: No.

Summary of ScienceDome operations: GHO Officer Tyler Hines’ experiment is continuing to be monitored; Cress microgreens have made significant progress and are continuing to sprout.

Dual split: On a timer from 10pm to 7am and under Mission Support supervision.

Summary of RAM operations: No operations were conducted in the RAM.

Summary of any observatory issues: No observatory issues.

Summary of health and safety issues: N/A

Questions, concerns, and requests to Mission Support: Based on our average water usage and the fact that we are a larger crew, we have calculated that the minimum water level of ~145 gallons (“31 inches” from the top of the lid) is likely to be reached on Sol 10. We would like a resupply of the 125 gallons of H2O, as offered at the beginning of our mission, as a safety net. Thank you!

Copyright © The Mars Society. All rights reserved. | Main Site