Crew 182+ Operations Report 20NOV2017
SOL: n/a
Name of person filing report: Shannon Rupert
Non-nominal systems: same as yesterday, except the generator is
running well again
Notes on non-nominal systems: Generator run all night last night, so
we don’t know if the last failure was due to the diesel or needing
oil.
Generator (hours run): 24
Solar— SOC 100 %
Diesel – 63 %
Propane – not known psi.
Ethanol Free Gasoline (5 Gallon containers for ATV) – 0 gallons.
Water (trailer) – 0 gallons.
Water (static) – 150 gallons (Brandon is currently bringing 100
gallons but we will need to make a couple more trips tomorrow.
Trailer to Static Pump used – no
Water (loft) – Static to Loft Pump used – not known
Water Meter: not checked
Toilet tank emptied: not that I know of
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) All 5 were moved to make
space for the big equipment preparing for the RAMM’s arrival tomorrow
Oil Added? no
ATV Fuel Used: 0Gals
# Hours the ATVs were Used today: 5 min each
Notes on ATVs: The 300’s battery is low, will need to jump it tomorrow
Deimos rover used: yes
Hours:
Beginning charge:
Ending charge:
Currently charging: yes
Sojourner rover used: ASSIGNED TO DIRECTOR, not yet ready
Hours:
Beginning charge:
Ending charge:
Currently charging: yes
Spirit rover used: Not yet ready
Hours:
Beginning charge:
Ending charge:
Currently charging: no
Opportunity rover used: not yet ready
Hours:
Beginning charge:
Ending charge:
Currently charging: no
Curiosity rover used: no yet ready
Hours:
Beginning charge:
Ending charge:
Currently charging: no
HabCar used? Yes
General notes and comments: The new rovers need to be put together
and the seats modified (except for Sojourner). Not yet started on
this project. Will charge the other three tomorrow.
Summary of internet: Internet was upgraded at Shannon’s, but the
phone does not work properly. Internet seems as good as before it
went bad, but not blindingly faster even with the upgrade. Wifi is
turned off to this service. Hab internet is good.
Summary of suits: n/a, not used
Summary of Hab operations: The forced air furnace is still
periodically blowing cold air. Need to clean the filter tomorrow then
order some as soon as possible to see if that is the problem.
Summary of GreenHab operations: I moved the beans to the wooden bench
and provided cages for their continued growth. Other plants were
organized. I prepped 10 pots for moringa seeds. Ordered further
supplies: timer for lights, environmental monitor, herb and lettuce
seeds with planters
Summary of ScienceDome operations: Ordered two floor lamps for evening
light. We will have to clean the lab tomorrow as it is not in
changeover condition.
Summary of RAMM operations: The area was leveled and the swale was
dug so that water will go around the building during rain and runoff.
The RAMM left California this evening and will be onsite at 10 am. It
will be lowered onto a railroad tie frame to keep it off the ground.
Summary of health and safety issues: Nothing to report
Questions, concerns and requests to Mission Support: Nothing, thank you.