Sol 2 Summary Report
November 24, 2017
Julielynn Wong, Crew 183 Mission Commander
Summary Title: A day of continuous 3D printing off-line and off-grid at MDRS.
Mission Status: Nominal.
Sol Activity Summary: We have been measuring the power usage of 3D printing 7 designs (including wind turbine components and a spare part for our drone) on our humanitarian 3D printing system (H3DPS-LM). Our Crew Engineer is preparing to use our recycler to convert printed plastic items into 3D printer feedstock.
Look Ahead Plan: Preparing for sim on 0700 MST 2017-11-25 (Sol 3) and 0700 MST 2017-11-27 (Sol 5).
Anomalies in work: Out of sim.
Weather: Calm, sunny and warm.
Crew Physical Status: Healthy
EVA: Crew Astronomer, Crew Engineer, HSO, and Greenhab Officer participated in an EVA led by our Crew Geologist.
Reports to be filed:
GreenHab Report
Operations Report
EVA Report
Astronomer Report
Support Requested: None