Hello CapCom, Graeme,
Here is my Operation Report.
Crew 189 Operations Report 26Feb2018
SOL: 8
Name of person filing report: Gabriel PAYEN
Non-nominal systems: Pipe leak, radio
Notes on non-nominal systems:
-The pipe still leaks in the lower deck
-A radio became inaudible during the EVA
Generator (hours run): Turned off this morning and turned on at 6:45 PM
Solar— SOC % (Before generator is run at night) 85%
Diesel – Too dark to see
Propane – Too dark to see
Ethanol Free Gasoline (5 Gallon containers for ATV) – 5 gallons.
Water (trailer) – 0 gallons.
Water (static) – Between 400 and 450 gallons
Trailer to Static Pump used – NO
Water (loft) – Static to Loft Pump used – YES
Water Meter: 131 473.9
Toilet tank emptied: NO
ATV’s Used: 350.1 & 350.2
Oil Added : YES
ATV Fuel Used: Gals
Hours the ATVs were Used today: 3 hours
Notes on ATVs: –
Deimos rover used: NO
Hours:
Beginning charge:
Ending charge:
Currently charging:
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: NO
Hours:
Beginning charge:
Ending charge:
Currently charging:
Opportunity rover used: NO
Hours:
Beginning charge:
Ending charge:
Currently charging:
Curiosity rover used: NO
Hours: Beginning of the EVA : 13.3 , End of the EVA : 13.7
Beginning charge: 100%
Ending charge: 87%
Currently charging: YES
HabCar used and why, where : –
General notes and comments: –
Summary of internet: –
Summary of suits and radios:
For the first time, our helmets stayed clear during the EVA and the fog quickly disappeared after every physical effort!
Summary of Hab operations: –
Summary of GreenHab operations: –
Summary of ScienceDome operations: –
Summary of RAMM operations: –
Summary of health and safety issues: –
Questions, concerns and requests to Mission Support: –