Operations Report – March 4th

Crew 189 Operations Report 4March2018

SOL: 14

Name of person filing report: Gabriel PAYEN

Non-nominal systems: –

Notes on non-nominal systems: –

Generator (hours run): Turned off at 08:45 and turned on at 1814

Solar— SOC 88 % (Before generator is run at night)

Diesel – 49 %

Propane – 25 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 3 gallons.

Water (trailer) – 0 gallons.

Water (static) – 550 gallons (100%)

Note : Dr Rupert and Atila realized that the tanks are 550 gallons one instead of 500.

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 656.6

Toilet tank emptied: NO

ATV’s Used: NO

Oil Added : YES

ATV Fuel Used: Gals

Hours the ATVs were Used today: –

Notes on ATVs: The ATVs are full and ready to go

Deimos rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

HabCar used and why, where : Used to get 120 water, for garbage and to stored parts of the aquaponics system

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations: –

Summary of GreenHab operations:

Summary of ScienceDome operations: –

Summary of RAMM operations:-

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

Copyright © The Mars Society. All rights reserved. | Main Site