Operations Report – May 1st

Crew 193 Operations Report 01May2018

SOL: 9

Name of person filing report: David Attig

Non-nominal systems: Two piece suits still need straps adjusted for neck ring. Generator/inverter/charger. One piece suit #10.
Notes on non-nominal systems: The generator still appears to not be charging the batteries at night (only powering the HAB). Shannon is having a look, this should not affect our operations (particularly with the days being so long now).

Generator (hours run): 7:00 pm to 7:55 am.

Solar— SOC 60 % (Before generator is run at night)

Diesel – 70 %

Propane – 60 psi.

ATV Fuel (Ethanol free gasoline) – 0 gallons.

Water (trailer) – 220 gallons.

Water (static) – 345 gallons

Trailer to Static Pump used – no

Water (loft) – Static to Loft Pump used – yes

Water Meter: 134437.8

Toilet tank emptied: no
Date last emptied: April 29

ATV’s (Honda, 300, 350.1, 350.2, 350.3): Honda, 300, 350.1, 350.3

ATV Oil Checked?: No

ATV Oil Added?: No

ATV Fuel Used: 0.5 Gallons

# Hours the ATVs were Used today: 3

Notes on ATVs: 350.2 is out of service, due to a previous issue. Honda has a hole in the seat.

Deimos rover used: No
Hours: 124.8
Beginning charge: 100%
Ending charge: N/A %
Currently charging: No

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: Unknown
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

Spirit rover used: No
Hours: 35.0
Beginning charge: 100 %
Ending charge: N/A %
Currently charging: No

Opportunity rover used: No
Hours: 34.2
Beginning charge: 100 %
Ending charge: N/A %
Currently charging: Yes

Curiosity rover used: No
Hours: 29.8
Beginning charge: 100 %
Ending charge: N/A %
Currently charging: Yes

Hab Car used?: No
Where was Hab Car used?: N/A
Why was Hab Car used?: N/A

General notes and comments: Supported two EVAs today.

Summary of internet: We’re out, same as normal.
Summary of suits and radios: Still work to do on two piece suits. Repair of suit chargers still in progress. Other than #10, one piece suits nominal.

Summary of Hab operations: Rear airlock door was pulled on while latched (we accidentally locked a crew-member out). While pulling, one screw came loose; it has been replaced by a screw with more length and girth.

Summary of GreenHab operations: Watered twice.

Summary of ScienceDome operations: Dishwasher experiment proceeding.

Summary of RAM operations: None today

Summary of health and safety issues: None to report

Questions, concerns and requests to Mission Support: Our garbage is ready to be picked up (both burnable and non burnable). There is also cardboard from sawhorse and wagon boxes. We would also like more ATV fuel (ethanol free gasoline).