Crew 203 Sol Summary Report 21-Jan-2019
Sol: 9
Summary Title: Aeolus Clash
Author’s name: Oscar Ojeda
Mission Status: Nominal
Sol Activity Summary: We woke up to check the SOC of the generator, given it’s anomalous functioning. We had a Colombian breakfast, and then worked for a while in our respective projects, before getting ready for the EVA. It was very windy outside, and during the EVA one of the suits shut off. We returned to the hab had lunch and rested a little, before starting to work on the reports. We expect to have a hot dinner to help with the cold night.
Look Ahead Plan: We’ll keep the EVAs going, and processing the results of the science projects.
Anomalies in work: The diesel generator was turned off during the night. During the EVA, one of the suits shut down.
Weather: WINDY, very windy, cloudy (nimbus and cumulonimbus) and with sporadic rain.
Crew Physical Status: In good health.
EVA: 1, a team of 4 went to the beige moon region.
Reports to be filed: Sol Summary, Operations Report, Greenhab Report, Journalist Report, EVA Request, EVA Report.
Support Requested: None