Operations Report – January 30th

Crew 204 Operations Report 30-Jan-2019

SOL: 2

Name of person filing report: Kunal Naik (Space_bot)

Non-nominal systems: None

Notes on non-nominal systems: N/A

Generator (hours run): started at 0730 in the Morning, stopped by 1830.

Solar— SOC % Turned on (29th January) 85%, Turned on (30th January) 74%

Diesel Reading – 1/2 Tank

Propane Reading – 73%

Ethanol Free Gasoline – 10 gallons

Water (Auxillary tank) – Not in use gallons

Water (Static tank) – 90%, 450 gallons

Auxiliary to Static tank transfer – No

Gallons transferred: Not Applicable

Water in GreenHab – 278.5 gallons

Water (loft) – 12 marked level

Static to Loft Pump used – yes

Water Meter: 01406324 units

Toilet tank emptied: No

Deimos rover used: No, still not functional
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: Not Applicable
Beginning charge: Not Applicable
Ending charge: Not Applicable
Currently charging: Not Applicable

Spirit rover used: Used for 1st EVA

Hours:71.6 hours
Beginning charge: 100%
Ending charge: 88%
Currently charging: Yes

Spirit rover used: Used for 2nd EVA (Due to limited time and Natgeo Photos)
Hours:71.8 hours
Beginning charge: 100%
Ending charge: 79%
Currently charging: Yes

Curiosity rover used: Not Used
Hours: Not Used
Beginning charge: Not Used
Ending charge: Not Used
Currently charging: Not Used

Opportunity rover used: Brakes not functional
Hours: 46.2 hours
Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes

Notes on rovers: None

ATV’s Used: None

Reason for use: N/A

Oil Added? N/A

ATV Fuel Used: Nope

# Hours the ATVs were Used today: N/A

Notes on ATVs: N/A

HabCar used and why, where? For water

Crew Car used and why, where? Off-Campus

General notes and comments: We have received 2 packages.

Summary of internet: N/A

Summary of suits and radios: Nothing to report.

Summary of Hab operations: Nothing to report.

Summary of Green Hab operations: Nothing to report.

Summary of Science Dome operations: Received a box package of
Measuring Cylinder in the science room which was broken by crew 203 which are now in the HAB with the crew 204.

Summary of RAMM operations: Received a box package of MDRS Sim Suit Recharger which is now in the HAB with the crew 204.

Summary of any observatory issues: Nothing to report.

Summary of health and safety issues: Nothing to report.

Questions, concerns, and requests to Mission Support: Nothing to report.

Copyright © The Mars Society. All rights reserved. | Main Site