Astronomy Report – Mar 25th
Crew 207 Astronomy Report 25 Mar 2019
Crew Astronomer: Tom Baldwin
MDRS ROBOTIC OBSERVATORY
Robotic Telescope Requested: None
Objects Viewed:
Remote observatory used to image M 65. Image processing not yet complete.
Problems Encountered: None
MUSK OBSERVATORY
Solar Features Observed: None.
Observatory closed, and photos of telescope, Laptop, and Solar Astronomy box sent to Peter.
Problems Encountered: None.
GreenHab Report – March 25th
Crew 207 GreenHab Report – 25 Mar 2019
GreenHab Officer: Diane Rothberg, Julielynn Wong
Environmental control: Heat and cooling w/ambient air 10:00 hr
Shade Cloth (40%)
Average temperatures: RH
Low: 17 deg C 16%
High: 27 deg C 28%
Hours of supplemental light: 0 Hours
Daily water usage for crops: 6 gal
Water in Blue Tank: 136 gallons
Crops watered at 08:00 hours (3 gal) and 17:00 hours (3 gal)
TIME NOTED TEMPERATURE (DEG C) / HUMIDITY (%)
1) 8:00 AM 26 deg C / 25%
2) 10:35 AM 17 deg C / 20%
3) 14:10 PM 27 deg C / 20%
4) 17:00 PM 24 deg C / 20%
Changes to crops:
Narrative: Disposed of a dead pea plant from CRew 206.
Harvest: Basil: 6 gm Parsley 6 gm Sage 1 gm
Support/ Supplies needed: none
Operations Report – Mar 25th
Crew 207 Operations Report 25 Mar 2019
SOL: 9
Name of person filing report: Tom Baldwin
Non-nominal systems:
Generator: Radiator hoses and alternator need replacement on the generator. A contractor has been arranged to make these repairs within a few days.
Generator
Generator (hours run): 12.5 hours
Generator turned on (1930 last PM), SOC (100%)
Generator was turned off at (0700 this AM), SOC (100%)
Diesel Reading – 50 %
Propane Reading – 60 %
Ethanol Free Gasoline – 2 gallons.
Water (auxiliary tank) – Not in use
Water (static tank) – 200 gallons (replenished by David)
Auxiliary to Static tank transfer– Not applicable
Gallons transferred: Not Applicable
Water in Green Hab – 142 gallons
Water (loft) – Static to Loft Pump used – yes
Water Meter: 142050.1 gallons
Toilet tank emptied: No
Deimos rover used: No, not functional
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: Not applicable
Beginning charge: Not applicable
Ending charge: Not applicable
Currently charging: Not applicable
Spirit rover used: Not used
Hours: 85.1 hours
Beginning charge: 100 %
Ending charge: 100 %
Currently charging: Yes
Opportunity rover used: Not used
Hours:54.9hours
Beginning charge: 100 %
Ending charge: 95 %
Currently charging: Yes (now 100%)
Curiosity rover used: Used
Hours: 84.7 hours
Beginning charge: 100 %
Ending charge: 97 %
Currently charging: Yes (now 100%)
Notes on rovers: not used
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): N/A
Reason for use: Not used
Oil Added?: N/A
ATV Fuel Used: N/A
# Hours the ATVs were Used today: None
Notes on ATVs: None
HabCar : None.
CrewCar used and why, where? Not used
General notes and comments: Nothing to report
Summary of internet: Nothing to report
Summary of suits and radios: EVA suits normal, with all batteries greater than 13 volts,
Summary of Hab operations: Per recent electrical anomalies, checked SOC of electrical system.
06:00 SOC 100 %, generator on.
07:30 SOC 100%, generator off
10.50 SOC 91%
Summary of Green Hab operations: Nothing to report
Summary of ScienceDome operations: Nothing to report
Summary of RAM operations: Nothing to report
Summary of any observatory issues: Nothing to report
Questions, concerns and requests to Mission Support: None
Sol Summary Report – Mar 25th
Summary Title : Day #9 (Out of Sim)
Author : Julielynn Wong
Mission Status : All nominal
Sol Activity Summary:
COM continued data collection for the thoracentesis and bike-powered 3D printing studies.
COM + XO continued 3D printing items in Level 1 of the Hab.
ENG + GHO signed out their duties to XO + COM.
ENG + GHO conducted testing of the new drone controller, completed surveys, and submitted qualitative feedback to manufacturer.
XO transported ENG/Astronomer + GHO/Journalist to GJT this PM.
Look ahead plan : Continue 3D printing projects, drone flight mapping, drone controller testing, and data collection for bike-powered 3D printing studies.
Anomalies in work : None
Weather : Sunny
Crew physical status : Fine
EVA : Drone flight testing in PM.
Reports to be filed : Operations, GreenHab, Astronomy
Support Requested : None
You must be logged in to post a comment.