Crew 215 Sol Summary 20Nov2019

Crew 215 Sol Summary Report 20-NOV-2019
Sol: 10
Summary Title: Rain on Mars?
Author’s name: Andrew Wheeler
Mission Status: Active
Sol Activity Summary: Overnight rain made the environs impassable so all activities
were confined to the habs. In the Green Hab, pots were filled in preparation for more
seedlings and in the Science Dome, gypsum was heated and rehydrated to create cement
tiles that were set aside for drying and strength testing. There are only 10 more
planned for this expedition. In addition, the water liberated from the heating process
was captured and will be investigated for suitability as a basis for medical solutions.
Meanwhile, the main hab became a haven for report writing. The afternoon saw more
gypsum cement tiles were constructed and dinner approached. Tonight,it was a spicy
jambalaya followed by chocolate chip cookies and lime and pineapple jelly.
Look Ahead Plan: Plantings in the Green Hab, the final 10 gypsum cement tiles to be
created and set aside for drying and an actual gypsum plaster of paris milled for a
splint making demonstration.
Anomalies in work: Three false alarms with smoke detectors (caused by water/humidity).
Weather: Rain and clouds clearing, light winds.
Crew Physical Status: Healthy
EVA: N/A.
Reports to be file: Sol Summary Report, Operations Report, Science Report, Green Hab
Report, Journalist Report, Daily Photos.
Support Requested: N/A

Copyright © The Mars Society. All rights reserved. | Main Site