Operations Report – February 6th

SOL: #2
Name of person filing report: Rajvi Patel
Non-nominal systems: None
Notes on non-nominal systems: None
ROVERS
Spirit rover used: EVA #1
Hours: 245.5
Beginning charge: 100%
Ending charge: 68% (On return from EVA, before recharging)
Currently charging: No
Opportunity rover used: EVA #1
Hours:160.5
Beginning charge:100%
Ending charge: 78%
Currently charging: No because of the rain
The duration for EVA #1 was 1 hour 20 minutes.
Curiosity rover used: EVA#2
Hours: 265.7
Beginning charge: 100%
Ending charge: 85%
Currently charging: No because of the rain
Perseverance rover used: EVA#2
Hours: 283.6
Beginning charge: 100%
Ending charge: 75%
Currently charging: No because of the rain
EVA #2 was aborted after 1 hour and 5 minutes due to rain. The crew returned to the Hab safely.
General notes on rovers:
Summary of Hab operations:
WATER USE: 23 gallons
Water (static tank): 309.37 gallons
Static tank pipe heater (on or off): ON
Static tank heater (On or off): ON
Toilet tank emptied: no
Summary of Internet: Nominal
Summary of suits and radios:
– Space suits #2, #6, #5, and #9 were used for EVA #1. Suits and Radios for EVA had no issues.
– Space Suits #1, #3, and #7 were used for EVA #2. Suits and Radios for EVA #2 had no issues.
– COMMS kit #1 radio harness holder pocket is coming loose. Will be re-sewed.
Summary of GreenHab operations: put notes here
WATER USE: 17 gallons
Heater: On
Supplemental light: From 22:00 to 02:20
Harvest: 83 grams (cherry tomatoes)
Summary of Science Dome operations: put notes here.
Dual split: Heat ON
Summary of RAM operations: (Tools used, work done) put notes here
Summary of any observatory issues:
– None. The observatory was accessed at 2:05 pm for the initial check and sending initial pictures to Peter Detterline.
Summary of health and safety issues: None
Questions, concerns, and requests to Mission Support: put notes here.
– All Hab doors are secured properly as per the weather forecast from Mission Support.
– Checked for tennis balls on the fence and zip ties on tarps for tarp safety:
HAB to RAM:
· 2 zip ties missing due to the torn holes used for zip ties. Was thinking of making another hole a little further from that location and securing it using a zip tie.
· The bottom tarp of the overlapping tarp section needs to be secured (I would recommend at least three points). Need advice from Mission Support
· A small hole was detected in the tarp. Is any action required? Does the mission support want me to put a tape on it?
HAB to Green Hab:
· 2 locations were found that need to be secured using zip ties. Will use the zip ties to secure them.
· A small hole was detected in the tarp near Green Hab. Is any action required?
Green Hab to Science Dome:
· 4 locations were found to be secured using zip ties. Will use the zip ties to secure them.
Science Dome to Observatory:
· 2 locations were found to be secured using tennis balls. Need tennis balls for it?
· 3 locations were found to be secured using zip ties. Will use the zip ties to secure them.