Supplemental Operations Report – February 10th

Date: 2/10/2024
Name of person filing report: Sergii Iakymov
Reason for Report: Routine
Non-Nominal Systems: HAB wall heater, solar observatory

Power system: Solar: Nominal.
SOC Last 24 hours: Max 100%; Min 76%; Avg 81.8%.
VDC Last 24 hours: Max 59.61V; Min 42.39; Avg 51.76V.
Generator run time: 5053.3 hours. Serviced on 02/08/2024, oil changed and air filter changed

Propane Readings: Station Tank: 66%
Director Tank: 60%
Intern Tank: 74%
Generator Tank: 30%

Water: Hab Static Tank – 341.09 gallons
GreenHab – 151.94 gallons
Outpost tank – 420 gallons
Science Dome – 0 gallons
Septic Tanks emptied: No

Rovers: Sojourner rover used: Yes, around campus
Hours: 196.6
Beginning Charge: 100 %
Ending Charge: 100 %
Currently Charging: Yes
Notes on Rovers: Perseverance is back to normal.

ATV: ATV’s Used: None. Nothing to report.

Cars: Hab Car used and why, where: To Hanksville for supplies. Need to be serviced.
Crew Car used and why, where: From Grand Junction by crew
General notes and comments: N/A.

Summary of Internet: All nominal.
EVA suits and radios: Suits: Suit 6 battery need to be tested. All others nominal
Comms: All nominal
Campus wide inspection, if action taken, what and why: All nominal.
Summary of Hab Operations: Wall heater is not functioning. Diagnostic is pending.
Summary of GreenHab Operations: All nominal.
Summary of SciDome Operations: All nominal.
Summary of Observatories Operations: Solar observatory telescope diagonal has two snapped screws. Repairs pending.
Summary of RAM Operations: All nominal.
Summary of Outpost Operations: Intern heater installed and running. Ventilation halls are made under the kitchen counter, bathroom sink and in the toilet door to help hot air move through. Rat holles have been patched,
Summary of Health and Safety Issues: All nominal.